Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions (대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략)

  • 이태식;김용천;박동찬;선우강;김열규
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

An Innovative Public Project Process Management For the Government Owner (발주자 입장에서 바라본 혁신적인 관급공사 관리 프로세스 제시를 위한 기초 연구)

  • Kim, Sung-Won;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.557-562
    • /
    • 2008
  • In Korean construction industry, a public sector's ordering volume has been constantly increased after 2000. But, because a cost, schedule and quality control generally depends on a result-centric management form and a transparent management is not done during the construction in the Korean public business, it is recognized that this causes problems including an increase of cost and schedule, incomplete construction, a difficulty to find the problem in advance to establish measures, and an unclear locus of responsibility of constructor, supervisor and designer. Accordingly, this study is intended to derive the problems and the limit of management by identifying and analyzing the management state of the present government construction client for the client organization of public sector's government construction. Also, the study is intended to contribute to the client's efficient and actual project management by presenting the model of supplementing or improving the derived problem and limits to the client's organization.

  • PDF

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF

A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation (공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Developing noise prediction software for Improvement of the construction noise management (공사장 소음 관리 효율화를 위한 소음예측프로그램 개발)

  • An, Jang-Ho;Lee, Jun-Seo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.155-156
    • /
    • 2009
  • Construction companies can easily understand present noise condition of their construction site via C-Noise. C-Noise is noise simulation software that simple to use. Construction companies spend time and cost for public complaints about construction noise. Construction site noise management using noise simulation software like C-Noise can reduce public complaint. achieve cost reduction to treat it.

  • PDF