The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

A Study on the Construction Plan of Machinery Public Platform through the Survey of the Construction Machinery Rental Market

  • Chang Wook Kim;Myeong Jin Jeong;Hyo Bae Lee;Jong Kwan Ho;Myeong Gu Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.4
    • /
    • pp.311-325
    • /
    • 2023
  • In the construction machinery rental market, there are frequent cases of sublease through large-scale rental companies or rental through mediation organizations without legal grounds. In addition, institutional improvement of the construction machine safety management system has been required due to concerns over the internalization of legal inspections due to the lack of type approval data and construction machine history management during the construction machine inspection process. The government is responsible for securing safety of construction machinery and promoting mechanization of construction machinery by efficiently managing the construction machinery market by setting safety management such as type approval, registration, and inspection of construction machinery. In order to efficiently implement this, it is required to establish a platform for renting construction machinery and collecting safety management information. We presented a plan to build a public platform for construction machinery to secure the soundness of the construction machinery rental market and to improve safety management.

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

The Study on Evaluation Basis of Management Strategy in Public Buildings (공공건축물의 합리적인 운영평가기준 설정 방향에 관한 연구)

  • Lee, Sang-Beom;Noh, Byung-Ok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.69-76
    • /
    • 2009
  • Recently, the twenty-first century is called "the age of localization and regionalization" in Korea. So, local government should need to keep balance between the existing administrative management and new management strategies based on CEO's mind in order to deal with the situation of such that(the age of localization and regionalization) and improve efficiency of public service. In addition, they build public buildings after that they should operate and maintain them regularly. However, Korea local governments have tried to run many projects to expand insufficient local finance that was only for profit oriented public projects without considering management. Therefore, this paper is a basic study to establish and suggest the reasonable operation plan for local government by examining and reviewing actual operation condition in the public buildings. With the evaluation method which is demanded from public construction management to introduce a civil management technique manages an investment mind standard and management basis of assessment, proposes 8 sides of financial affairs, real estate maintenance and facility management, achievement evaluation, environmental safe crisis management, judiciary and explanation responsibility with base.

A Comparative Analysis on the Merits and Demerits in Domestic and Overseas Public Facilities Management (P-FM)

  • Yoon, Seung-Wook;Lee, Chun-Kyong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.357-360
    • /
    • 2015
  • For the last 40 years, the Korean government has built and supplied diverse public facilities. The Korean government, which has supplied diverse public facilities for the last 40 years, has maintained these public facilities as breakdown maintenance under limited budget. Because of increase of aging of public facilities and insufficient budget, it needs the total public facility maintenance. Especially, as Japan has also experienced similar issues and solved these, they are the introduction of P-FM theory and see successful examples. In this study, by comparison Analysis on the Merits and Demerits for Public Facility management (P-FM) between domestic and abroad, it would find a future direction to public facility management P-FM is to go.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.