PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

A Study on Pricing Model of High-Rise Residential Buildings From the viewpoint of Landmark Factor

  • Sung-Kon Moon;Sang-Hyo Lee;Kyung-Min Min;Joo-Sung Lee;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.573-578
    • /
    • 2009
  • Previous research on super high rise buildings focused mostly on the use of public space from building plan perspective, survey of residents' satisfaction evaluation, construction technology and structural technology. But little research is done on the economic analysis of landmark factors. The purpose of this study is to find landmark factors that can be quantitatively measured, collect data on super high rise residential buildings in Seoul. Find the intrinsic values of the landmarks, and analyze how these values differ in areas with different densities, i.e. in 3 Gangnam-gus & Yeongdeungpo-gu and in other areas. It is expected that the results of this study can be used to set an appropriate price of super high rise building in consideration of its landmark value in different area

  • PDF

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Public Building Value Evaluation Using Contingent Valuation Method Based on Market Value Estimation

  • PARK, Jieun;YU, Jungho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.367-370
    • /
    • 2015
  • Building deterioration reflects the degradation of basic building performance including structural performance, energy performance, durability, and safety, and it also includes perceived deterioration, which considers a user-based perspective. More than 50% of the existing buildings in Korea are over 15 years old and public buildings compose 2.5% of all buildings domestically. Therefore, there are several different problems, such as poor energy efficiency, structural performance, and safety. To address the challenges of increasing stock in deteriorated buildings, it is necessary to make decisions about reconstruction or renovation. In this study, we propose a new method to evaluate public building value with a contingent valuation method (CVM). By estimating willing-to-pay (WTP) from users of private buildings in similar situation with the public building, it is possible to compare market prices and calculate a correction factor to adjust the WTP data. Finally, we apply the correction factor to the WTP of a public building and estimate market price, willingness to pay (WTP). Finally, we apply the correction factor to willing to pay (WTP) of public building and estimate market price.

  • PDF

공공임대주택의 2단계 공급방식 적용 방안에 관한 연구 - 일본 스켈레톤 임대형 SI주택 사례를 중심으로 - (A Study on the Application of the Two Step Supply System of Public Rental Housing - Focused on the cases of SI housing with skeleton rental in Japan -)

  • 이용규;박지영
    • 대한건축학회논문집:계획계
    • /
    • 제35권7호
    • /
    • pp.45-52
    • /
    • 2019
  • In recent years, there has been a demand for a residential supply model that can actively and flexibly cope with various housing demands in the changing paradigm of public rental housing. This study focuses on the two-step supply system that has been studied in Japan. It was used to examine and analyze cases to recommend a supply plan that can be used for domestic public rental housing. In more detail, the literature review of the two-step supply system discloses that four types by supply methods (A-1, A-2, B-2, and C-2) and four types of relationship (construction and management combine entities type, management entity type, construction entity type, a separated entity type) can be categorized. In addition, from the actual case study, it revealed that the way of linking and supplying activities among the entity can have a great influence on "ease of supply (supply)", "diversity of housing demand (diversity)," and "quality of construction (construction)". "Ease of supply (supply)" refers to whether the construction entity is separated, and the owner is a manager. "Diversity" refers to whether the management subject is separated, and if the owner is also the constructor or the manager. "Construction" is whether the management entity is connected and managed by the management entity and can be evaluated in "Good", "Middle", and "Bad" level. As a summary, even if the existing public rental housing in Korea can be separated into a skeleton and infill system, the result suggested that it has a limitation on response to residential demand. In addition, the paper was able to propose an improved plan to make the infill as a secondary operator.

공공공사의 발주방식선정을 위한 의사결정요인 연구 (Determining Decision-making Factors for the Selection of Contract Methods in Public Construction)

  • 김대길;이웅균;이학주
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.405-412
    • /
    • 2015
  • 공공공사의 발주는 발주방식의 선정이 발주부서 또는 발주업무 담당자의 업무적 경험 위주로 선정되고 있어, 해당 공사의 유형이나 특성 분석이 고려된 객관적인 선정 프로세스를 거치지 못하고 있다. 따라서 본 연구는 프로젝트 발주방식 선정 모델의 개발을 위한 초기 연구로써 공공공사의 발주방식 선정에 영향을 끼치는 주요 요인들을 분석하여 제시하고자 한다. 기존의 발주방식 관련 문헌조사를 통해 1차 요인을 제시하고, 요인분석을 통해 최종 영향 요인을 제시한다. 그 결과 발주자의 특성, 건설시장 환경, 조직, 프로젝트 특성, 비용, 책임요소의 6가지 대분류로 나뉘었으며, 하위요인으로 14가지가 선정되었다. 본 연구에서 제시된 요인들은 향후 공공공사 발주방식 선정을 위한 의사결정 지원 모델개발의 기초자료로 활용될 것이다.