• Title/Summary/Keyword: Propagation Delay

Search Result 533, Processing Time 0.019 seconds

A Study on a Type of Regeneration Project on Old Industrial Complex (노후산업단지 재생사업 추진 유형에 관한 연구)

  • Kim, Joo-hoon;Byun, Byung-seol
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.192-211
    • /
    • 2018
  • With significant influences of old industrial complex in September 2009, Ministry of Land, Infrastructure and Transport chose the 4 districts for the first pilot project. In December 2014, the second pilot project districts were established. In addition, there were 10 districts in April 2016 and 5 districts in April 2016 as the third pilot project and 5 districts in March 2017 as the fourth pilot project. In order to promote smooth business operation of the recycling business, we introduced the effective area designation and special system as stipulated in Article 39.12-13 of the Industrial Location and Development Act revised in May 2015. The effective area, It is a method that can promote propagation and diffusion of the rehabilitation business through visualization by making effective the promotion of the rehabilitation business and by promoting the business in consideration of the geographical feature of the region and industry group, The setting of the unreasonable effective area is based on the criteria and classification of the plan and the objective promotion method according to the individual characteristics of the aged industrial park because the delay of the rehabilitation business and the possibility of the increase of many problems are presented Be sure to Data Envelopment Analysis (DEA) and the old industrial complex database were constructed and utilized to classify the types of recycling projects. Therefore, in this study, it is necessary to strengthen the competitiveness of aged industrial complex by examining the correlation between the diagnosis of 83 aged industrial complex sites and the rehabilitation projects supported by the Ministry of Land, and the types of business promotion for aged industrial parks. It can be used as a guideline for the feasibility of the project.

A Non-Calibrated 2x Interleaved 10b 120MS/s Pipeline SAR ADC with Minimized Channel Offset Mismatch (보정기법 없이 채널 간 오프셋 부정합을 최소화한 2x Interleaved 10비트 120MS/s 파이프라인 SAR ADC)

  • Cho, Young-Sae;Shim, Hyun-Sun;Lee, Seung-Hoon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.9
    • /
    • pp.63-73
    • /
    • 2015
  • This work proposes a 2-channel time-interleaved (T-I) 10b 120MS/s pipeline SAR ADC minimizing offset mismatch between channels without any calibration scheme. The proposed ADC employs a 2-channel SAR and T-I topology based on a 2-step pipeline ADC with 4b and 7b in the first and second stage for high conversion rate and low power consumption. Analog circuits such as comparator and residue amplifier are shared between channels to minimize power consumption, chip area, and offset mismatch which limits the ADC linearity in the conventional T-I architecture, without any calibration scheme. The TSPC D flip-flop with a short propagation delay and a small number of transistors is used in the SAR logic instead of the conventional static D flip-flop to achieve high-speed SAR operation as well as low power consumption and chip area. Three separate reference voltage drivers for 4b SAR, 7b SAR circuits and a single residue amplifier prevent undesirable disturbance among the reference voltages due to each different switching operation and minimize gain mismatch between channels. High-frequency clocks with a controllable duty cycle are generated on chip to eliminate the need of external complicated high-frequency clocks for SAR operation. The prototype ADC in a 45nm CMOS technology demonstrates a measured DNL and INL within 0.69LSB and 0.77LSB, with a maximum SNDR and SFDR of 50.9dB and 59.7dB at 120MS/s, respectively. The proposed ADC occupies an active die area of 0.36mm2 and consumes 8.8mW at a 1.1V supply voltage.

A comparative study of risk according to smoke control flow rate and methods in case of train fire at subway platform (지하철 승강장에서 열차 화재 시 제연풍량 및 방식에 따른 위험도 비교 연구)

  • Ryu, Ji-Oh;Lee, Hu-Yeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.4
    • /
    • pp.327-339
    • /
    • 2022
  • The purpose of this study is to present the effective smoke control flow rate and mode for securing safety through quantitative risk assessment according to the smoke control flow rate and mode (supply or exhaust) of the platform when a train fire occurs at the subway platform. To this end, a fire outbreak scenario was created using a side platform with a central staircase as a model and fire analysis was performed for each scenario to compare and analyze fire propagation characteristics and ASET, evacuation analysis was performed to predict the number of deaths. In addition, a fire accident rate (F)/number of deaths (N) diagram (F/N diagram) was prepared for each scenario to compare and evaluate the risk according to the smoke control flow rate and mode. In the ASET analysis of harmful factors, carbon monoxide, temperature, and visible distance determined by performance-oriented design methods and standards for firefighting facilities, the effect of visible distance is the largest, In the case where the delay in entering the platform of the fire train was not taken into account, the ASET was analyzed to be about 800 seconds when the air flow rate was 4 × 833 m3/min. The estimated number of deaths varies greatly depending on the location of the vehicle of fire train, In the case of a fire occurring in a vehicle adjacent to the stairs, it is shown that the increase is up to three times that of the vehicle in the lead. In addition, when the smoke control flow rate increases, the number of fatalities decreases, and the reduction rate of the air supply method rather than the exhaust method increases. When the supply flow rate is 4 × 833 m3/min, the expected number of deaths is reduced to 13% compared to the case where ventilation is not performed. As a result of the risk assessment, it is found that the current social risk assessment criteria are satisfied when smoke control is performed, and the number of deaths is the flow rate 4 × 833 m3/min when smoke control is performed at 29.9 people in 10,000 year, It was analyzed that it decreased to 4.36 people.