A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Suggestions for Resolving the Social Conflict in Affordable Housing

  • Park, Tae Soon;Lee, Mihong
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.179-191
    • /
    • 2014
  • The purpose of this study is to employ a method called 'conflict impact assessment' to analyze the progress, background, cause and relevant issues of conflicts related with affordable housing for youth (Happiness Housing Project), a project that has been implemented since last May 2013, thereby identifying the relevant problems and draw out objectives for improvement. The researchers expect that this study will contribute to solving the current issues regarding Happiness Housing, and contribute to improving the quality of the government's policies. For the above purpose, literatures on Happiness Housing produced from August to November 2013 were reviewed, in-depth telephone or face-to-face interviews were conducted with personnel associated with project implementation in the Ministry of Land, Infrastructure and Transportation and LH, etc., and major interested parties including Yangcheon-gu residents. Key issues identified regarding Happiness Housing construction include: the way that the project was implemented, living quality of residents, impact on educational environment, inconsistence with existing plans, relatively high construction cost, insolvency of public corporations, land use fee issue with Korail, need of preliminary feasibility survey, securing sufficient amount for supply and issue of additional designation, likelihood of finishing construction in time and issues related with actual source of demand, etc. Through analysis of conflict development and positions of interested parties, the main causes of the conflicts were identified as follows: lack of deliberation on pledges during election, lack of viability review on pledges, lack of conflict management plans, one-way implementation without consent of interested parties, project plans established with no regard to local circumstances, frequent project revision, underwehlming level of conflict management. In order to address issues above, the following measures need to be taken: selecting election pledges based on actual effectiveness, thorough assessment on pledges by relevant departments, gradual implementation based on consideration of the actual circumstances, participation of key interested parties, consistent policy and adopting conflict management techniques that reflect the reality.

Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.69-77
    • /
    • 2005
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

NEW INTELLIGENT APPROACH FOR PROJECT MANAGEMENT IN CONSTRUCTION INDUSTRY

  • D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.366-370
    • /
    • 2005
  • The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.

  • PDF

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

Study on the Certificate System of the EIA Project Manager through Collaborative University Curriculum in Korea (한국에서 대학교과과정과 연계된 환경영향평가사 자격부여에 관한 연구)

  • Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.1
    • /
    • pp.81-95
    • /
    • 2008
  • The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction (프로젝트 관리 정보시스템 품질이 프로젝트 성과와 사용자 만족도에 미치는 영향)

  • Park, So-Hyun;Lee, Taewon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.50-60
    • /
    • 2018
  • The use of Project Management Information System (PMIS) is increasing in project management industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project performance. However, how much and which parts of project management performance are affected by PMIS still need to be studied further. The purpose of this study is to investigate the impact of PMIS quality on project management performance. We collected data from various project based industries such as construction, defense, manufacturing, software development and telecommunication by using survey questionnaire. PMIS quality was measured in three dimensions. They are system quality, information quality and service quality. Project management performance was measured in nine variables such as time reduction, work accuracy, cost management, etc. Statistical analyses such as multiple regression were used to analyze the data. The results showed that PMIS quality had significant impacts on the project management performance and user satisfaction. It was notable that only two dimensions out of the three PMIS quality dimensions, system quality and information quality, affected the project management performance. Also, it was found that PM performance played a mediating role between PMIS and user satisfaction, and between PMIS and reuse intention. The contribution of this research is that it helps to clarify what aspects of PMIS affect the project management performance and user satisfaction.