• Title/Summary/Keyword: Project financing

Search Result 151, Processing Time 0.022 seconds

THE FINANCING MODEL FOR GREEN BUILDING PROJECTS WITH THE GOVERNMENTAL GUARANTEE BASED ON CER (Certified Emission Reduction)

  • Sang-Hyo Lee;Se-Woong Jang;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.368-375
    • /
    • 2011
  • Along with the growing interest in greenhouse gas reduction, the effect of energy reduction from green buildings is gaining interest as well. However, green buildings may have difficulties in financing due to their high initial construction costs. With this in mind, the objective of this study is to suggest a financing model for green building projects with a governmental guarantee based on CER (Certified Emission Reduction). In other words, in the financing model, the government provides a guarantee for the increased costs of a green building project in return for CER. The suggested financing model was tested and found feasible for implementing green building projects. In addition, the model in this study is applicable to private projects because guarantee has its return. To utilize CER as a return for a financial guarantee, however, certification of CDMs (Clean Development Mechanism) for green buildings must be vitalized.

  • PDF

Financing Strategy for Port Development in response to Unification of South and North Korea (남북한 통일대비 항만개발을 위한 재원조달 전략)

  • 임종길;이태우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.04a
    • /
    • pp.16-32
    • /
    • 2000
  • This paper aims at exploring financing methods for port development in response to unification of South and North Korea. In so doing, methods of port financing employed by major countries have been enumerated. Major financing sources for the two Korea, among others, taxes, public bond, public administration fund, establishment of harbour maintenance tax, port development tax, port development fund, Civil Economic Cooperation Fund of South and North Korea, and Fund for Port Development of North Korea and, fund for cooperation of South and North Korea, Economic Development Cooperation Fund, borrowing of foreign capital, project financing, domestic civil capital investment, foreign capital investment, application of cross-subsidization principle, etc. were suggested.

  • PDF

Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

Diversification of Financial Method for Effective Practice of Construction Projects (건설사업의 효율적 수행을 위한 파이낸싱 다양화 방안)

  • Han Sang-Hun;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.99-108
    • /
    • 2003
  • Recently, the construction companies are forced to cut down the investment amount due to increasing financial problems caused by severe recession and restructuring in the financial market as well as the long-term depression of the construction industry. To overcome this type of problems, a great many efforts have been made. An alternative may be adopting the advanced financing methods. However, during the course of enforcing process of the financing methods, many problems are revealed without any proper solutions being proposed. Therefore, the fundamental problems need to be solved through comprehensive and systematic approach under the changing environment of construction financing. In this paper, as a result of reviewing some financing methods such as ABS, REITS, and Project Financing, multiple business strategies for construction companies to cope with the changing construction market are found in the sense of effectiveness in implementing construction projects. Further, this paper presents diversified financing methods for the effective practice of construction projects through combination of above mentioned methods, and also proposes improvement plans to strengthen the financing function for the construction industry.

Effects of the contingent liabilities caused by project financing on financial status of the Korean construction firms (프로젝트금융으로 인한 우발채무가 건설기업의 재무상태에 미치는 영향)

  • Kang, Namhui;Kim, Hyunjoong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.84-91
    • /
    • 2015
  • Project Financing (PF) is a financing method, executed based upon the projected profitability from a project itself instead of relying on the credit rating of project sponsors or any type of collateral. However, most financial institutions of Korea lacks the long term profitability assessment capability, and they prefer to acquire credit reinforcement from the construction companies in the form of the guarantor or debt argument commitments. As a result, PF contingent liabilities as an indirect debt, are burdened to the construction companies. Even though the PF contingent liabilities are not supposed to be part of the financial statements, they became a mandatory disclosure items since 2009. In this study, PF contingent liabilities were studied to indicate how they were correlated with construction firms' financial ratios. Construction firms were grouped by their credit rating and each group was compared in order to analyze PF contingent liabilities' impact on the financial condition of the company in terms of liquidity, liability, and stability.

A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project - (해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 -)

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

기술혁신 기업과 R&D 프로젝트 파이낸스 : 지속적 기술혁신을 위한 자금조달의 대안

  • 김영훈;변혜영;이정동
    • Proceedings of the Technology Innovation Conference
    • /
    • 2006.02a
    • /
    • pp.170-186
    • /
    • 2006
  • The guarantee funds for government policy fund, venture capital investment fund, technology guarantee debt are the core parts of the external financing system in the constant technology innovation company. However, the enterpriser's requirement to keep the technology innovation with minimized management intervention and policy maker's hope to advance technology development with clear operation of funds is enough to request for research of the project investment plan to the R&D project. This paper will analyze whether technology innovation company that creates cash flow prefers to the project investment as a financing program or not, and if prefers, what characters of company affect on this preference. The more the company that pursuit the additional R&D activity separated to on-going items becomes over the fixed size, the more prefers the project investment as future external fund-raising. Together with that, this paper suggests that we can apply the plan like special purpose vehicle, SWORD(Stock Warrant Off-Balance sheet R&D) and R&D Limited Partnership as R&D project investment policy, and improve the system itself.

  • PDF

PROBLEMS AND SOLUTION OF IDENTIFICATION AND APPROVAL OF PRIVATELY FINANCED INFRASTRUCTURE PROJECTS IN CHINA

  • Xiangrong Du;Tsunemi Watanabe
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.731-736
    • /
    • 2005
  • The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.

  • PDF