Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.243-251
/
2013
Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.
The Journal of Asian Finance, Economics and Business
/
제8권9호
/
pp.79-89
/
2021
Green finance plays an important role in environmental protection missions and fighting climate change. The Environment Fund in Vietnam is the main channel of preferential capital offered to firms for environmental protection. Unfortunately, it was previously unknown which criteria influenced these companies' ability to obtain green financing. Using a survey method, we collected data through a structured questionnaire of 203 respondents that represent firms that had received concessional loans from 26 Environment Funds. A Multiple Linear Regression model was used to examine the determinants of access to concessional loans for environmental protection. We found relationships between age, size, ownership type, and industry sector, and access to green finance. Third-party guarantees were a significant factor in financing through Environment Funds. Moreover, we found commercial environmental projects face fewer green financing obstacles. Surprisingly, showing audited financial statements does not mitigate the information asymmetry between firms and these financial institutions. These findings suggest that Environment Funds should classify environmental project types to develop appropriate lending policies. In emerging markets, enterprises need to build a trusted relationship with financial institutions so that they can replace asset-based lending techniques, thereby increasing the firms' accessibility to green finance.
Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.
The 8th International Conference on Construction Engineering and Project Management
/
pp.371-380
/
2020
With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.395-398
/
2011
This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.
The 6th International Conference on Construction Engineering and Project Management
/
pp.527-531
/
2015
With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.
YESSENTAY, Aigerim;KIREYEVA, Anel A.;KHALITOVA, Madina;ABILKAYIR, Nazerke A.
The Journal of Asian Finance, Economics and Business
/
제7권7호
/
pp.531-541
/
2020
The purpose of the study is a theoretical and practical justification for building a mechanism for financing health facilities based on public-private partnerships from a pension fund in regions with environmental problems. The theoretical background is built on works of local and foreign authors on state and non-state pension provisions issues, pension funds' assets management. This study provides an analysis of the health status of the population of the Kyzylorda region; it analyzes also the worldwide and Kazakhstan practice of investing pension funds and implementing projects. There has been legislative and methodological framework for financing health projects based on public-private partnerships in Kazakhstan. The scientific methods considered in this study made it possible to develop a mechanism for financial support for the modernization of a healthcare facility using the budget of pension funds. The authors point out possible risks in the implementation of projects in the field of healthcare and make recommendations on the construction a mechanism for financing healthcare facilities in the regions of Kazakhstan with environmental problems. In addition, they underline the key insights of the analysis, which are requisites for identifying the profitability of project for business and social effects for the public. Factors influencing efficacy, effect and implementation risks identified.
The mutual credit of Fisheries Cooperatives is reciprocal financing bring overs and shorts to settlement themselves by filling each other's needs among feeble fishermen economically. The spread of mutual credit through Fisheries Cooperatives reduces private loan dependence and private loan interest rate at fishery village, and that fills up policy financing being restricted by working scale. And seeing movement side of Fisheries Cooperatives, it has done an under board to settle self-supporting foundation of primary fisheries cooperatives early. The mutual credit deposit shows about 53 times increase past an interval of a ten years. This increase rate is an epoch-making record being unparalleled in other banking facilities except Fisheries Cooperatives. Then being unparalleled increase rate, time and savings deposits increase has been contributed a great deal than demand deposits. Thinking important function factors as mutual credit growth, we can classify interior and exterior factors. The exterior factor is income of fishery household in some measure, interior factors are the high deposits interest rate and the enlargement of facilities organization. As these, they have been in a better factors, also have been a restriction factors. The restriction factors are conflict cancellation between mutual credit and them bring into existence a village vault, mutual savings and finance companies, private finance. For the sake of continuance growth rate in mutual credit as past, we should eliminate restricted factors in growth. On the other hand the better factors in growth should be act upon affirmation side continually. Consequently under circumstances not to an amicable settlement bring the fisheries fund demand as policy financing, we should do continuous and sound development of fisheries financing by means of putting in good order of fisheries cooperatives mutual credit. Surveying a problem from these viewpoints, when we study more deep and a full into a subject about growth project of mutual credit, we think to expect continuous growth in mutual credit of Fisheries Cooperatives.
건설사의 신용에 의존하던 과거의 PF사업은 국내 부동산 경기 악화 등의 영향으로 사업에 대한 부정적 인식이 증가하였다. 그 후 PF사업은 건설사의 신용에 단순히 의존하기보다는 실질적인 담보인 미래의 현금흐름, 수익성에 대한 안전성이 더 중요하다는 인식이 증가함에 따라, PF사업 전문가들은 사업의 안전 구조 확보, 리스크를 체계적으로 분석하기 위한 노력을 기울이고 있다. 그럼에도 불구하고 대부분의 PF사업은 금융, 부동산 전문가에 의해서 시장성 분석, 분양성 검토 등을 통해 사업 후의 개발이익을 예측하고 프로젝트 전반에 대한 사업의 타당성을 평가하는 기존의 방식에 의존하고 있다. 특히, 건설사 입장에서의 현금흐름 평가는 기초적인 수준에 머물러 있는 실정이다. 따라서 본 연구에서는 PF 사업의 안정적 수행을 위해 참여 주체들의 신용보강 구조(자금조달 및 회수계획)를 설정하는 기존 PF사업 타당성 평가 및 의사결정 구조에 대해 분석하고, 자금동원 능력이 상대적으로 미흡하도고 판단되는 중견건설사의 경우 PF사업의 참여 의사결정에 도움이 될 수 있도록 자기자본 투입시점과 규모를 합리적으로 예측하기 위한 현금흐름 방법론을 제안하였다.
This study was conducted to provide an improving direction of K-EIP(Korean Eco-Industrial Park) construction project by company's voluntary participation. For this purpose, we investigated and analyzed the status of domestic eco-industrial park projects from various literatures, foreign EIP cases and FGI(Focus Group Interview). The key issues to construct a voluntary K-EIP are the lack of experts, the difficulties of commercialization financing, and so on. In this study, therefore, the programs to resolve these problems in K-EIP construction project were suggested at the level of government and corporation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.