• Title/Summary/Keyword: Project evaluation

Search Result 2,337, Processing Time 0.027 seconds

Decision Support System for Project Duration Estimation Model (프로젝트기간예측모델을 위한 의사결정지원시스템)

  • 조성빈
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.91-98
    • /
    • 2000
  • Despite their wide application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today, due to a static view for project progression. This study proposes a framework for estimation by loaming based on a Linear Bayesian approach. As a project Progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g., the expected project completion time as well as the probabilities of completing the project within the due bate and by a certain date. By implementing such customized system, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF

An Inferential Study on the Effect of a Graduate School Funding Project: Case of World Class University Project's Improving Effect of World University Rankings (대학원 재정지원사업의 효과에 관한 추론적 연구: 세계수준의 연구중심대학(WCU) 육성사업 사례)

  • Park, Kyoung-Ho;Jang, Deok-Ho
    • Journal of Engineering Education Research
    • /
    • v.15 no.4
    • /
    • pp.101-108
    • /
    • 2012
  • The purpose of this study is to infer how is the effect of a governmental funding project to graduate schools by taking an example of World Class University Project's potential impact on the change of world university rankings in an international university ranking survey. Systematic results show that WCU contributes to improving academic peer reviews for both individual and institutional standings and discipline-based rankings. The potential effect of improving world rankings of participating universities could be ascribed to relatively higher weight of the survey to international peer review and invitation of world class scholars to the participating universities, which is a core device of the project. This implies a need to affirmatively utilize WCU foreign scholars over the course of facilitating international academic networking. The results should also be taken into consideration by universities and the government when developing evaluation systems and restructuring the project.

A Study on the Improvement for Practical Application of Cultural Impact Assessment System (문화영향평가제도의 현실적 적용을 위한 개선방안 연구)

  • Ko, Jeong-Min;Park, Ji-Hye
    • Review of Culture and Economy
    • /
    • v.20 no.1
    • /
    • pp.51-80
    • /
    • 2017
  • This study aims to analyze various issues and problems in the implementation process of cultural impact assessment in 2016. As a result of the analysis, it is found that the evaluation index of the cultural impact assessment is difficult to understand, and the referring data and materials in the evaluation planning phase in the process of the cultural impact assessment are deficient, and the evaluation planning is based on surveys rather than various methods. And there are some problems with evaluation scales and weighting, and they are focused on the evaluation itself rather than the feedback of the evaluation results. Therefore, this study suggests that, in the evaluation planning phase, the different methods of comparing the evaluation results according to the project execution, the project progress, and the completion time of the project should be adopted, and the project manager and the evaluation group participate developing the evaluation indicators together, and methodology for identifying causal relationship such as system dynamics will be adopted. In the stage of evaluation, it is necessary to introduce various methodology such as diverse residents participation, abundant case study, application of quantitative methodology, and the utilization of expert evaluation teams. In the evaluation feedback stage, it is necessary to provide thorough consulting based on the evaluation results.

A Study on the Evaluation for the Improvement of Streetscape through Analysis of Visual and Perceptual Characteristics - Focused on the Gwangbok Street, Busan - (시지각적 분석을 통한 가로경관개선사업 평가에 관한 연구 - 부산시 광복로를 대상으로 -)

  • Yang, Jae Hyuk;Lee, Kang Hee
    • KIEAE Journal
    • /
    • v.9 no.3
    • /
    • pp.37-46
    • /
    • 2009
  • This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of visual and perceptual characteristics by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of the environmental factors which influence subjects' satisfaction degrees including physical street equipments and street view factors which are main contents of this project. Using a satisfaction analysis and factor analysis, each factor's significance was verified quantitatively. As a result of the analysis, physical components of the streetscape were classified into 4 types according to project's effectiveness and improvement priorities. These 4 types include (1) Components for maintenance because of higher satisfaction and higher importance, (2) Components for improvement because of lower satisfaction and higher importance, (3) Components for good business fruits because of higher satisfaction and lower importance, and (4) Components for unnecessity because of lower satisfaction and lower importance.

Economic Evaluation of the IT SoC Industry Infrastructure Program

  • Oh, Wan-Keun;Min, Wan-Kee
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2007.04a
    • /
    • pp.79-99
    • /
    • 2007
  • This paper evaluates the economic effect of the IT SoC Industrial Foundation Composition Project. The evaluation was done in three steps. The first step was to estimate the contribution effect of the fabless small and medium venture business' sales. The step includes interview with all the CEOs of the firms under the support of the Enterprise Incubation System, The second step was to apply input-output analysis and then estimate the production inducement effect. The last step was to compare the results of estimation with the costs of the project. We have concluded this project had achieved 6.3 times greater economic effect compared to the budget. The reason for the large economic effect is that the project provided various infrastructures to the small and medium venture businesses.

  • PDF

The Evaluation and Countermeasures for the 2nd Arc Reduction for the High Speed Reclosing in 765kV Transmission Line (765kV 계통의 고속도 다상 재폐로 관련 2차 아크 검토 및 억제 방안)

  • Ahn, J.S.;Kim, J.Y.;Jin, J.Y.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.613-615
    • /
    • 1995
  • KEPCO is now going on upgrading the highest system voltage from 345kV to 765kV since 1992. The main reason of this 765kV project is the bulk power transmission from the power generation sites at the East and West coasts to the Kyeong-in area. The first 765kV transmission lines will be constructed by 1998 and operated as 345kV level until 2001. This system needs a detailed evaluation of the 2nd arc in case of 765kV transmission line outages and the countermeasures for the fast arc reduction for the successful high speed reclosing. So, this paper deals with the simulation results of the 2nd arc characteristics using EMTP and comparison of Sh.R and HSGS for the reduction methods.

  • PDF

Evaluation of Project Manager's Leadership in Construction Projects;Based on LBDQ and Pilot Test (건설 현장소장의 리더십 평가 방안에 관한 연구;LBDQ 기법을 활용한 파일럿 테스트를 중심으로)

  • Gang, Ji-Sun;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.209-212
    • /
    • 2007
  • Project managers' leadership in construction projects significantly influence project performance and outcomes. However, due to its conceptual and quantitative nature, leadership is a subject which is difficult to be evaluated or measured despite of the benefits of its measurement. The objective is this paper to apply the LBDQ technique in evaluating project managers' leadership and discuss outcomes through a pilot test.

  • PDF

Evaluation of R&D Projects in Electric Power Industry with Efficiency and Effectiveness (전력산업 R&D 프로젝트의 효율성 및 효과성 평가)

  • Park, Sung-Min;Kim, Heon;Baek, Dong-Hyun
    • IE interfaces
    • /
    • v.22 no.3
    • /
    • pp.192-204
    • /
    • 2009
  • Based on the characteristics of 'Korean electric power industry R&D programs', this study proposes a new performance evaluation framework where electric power industry related R&D projects are scrutinized. The abovementioned R&D programs have their own goals and especially they emphasize the effectiveness as well as the efficiency of each subordinate R&D project. Hence, in this framework, a performance evaluation procedure is established and then a mathematical model is developed according to the procedure. The model calculates performance evaluation indices for a set of R&D projects integrating the effectiveness with the efficiency of each R&D project. In a case study with an empirical dataset, statistical significance is tested on the integrated performance evaluation indices of R&D projects regarding organizational types and program categories considered.

Estimation of Induced Highway Travel Demand (도로교통의 유발통행수요 추정에 관한 연구)

  • Lee, Gyu-Jin;Choe, Gi-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.7 s.93
    • /
    • pp.91-100
    • /
    • 2006
  • Travel Demand Forecasting (TDF) is an essential and critical process in the evaluation of the highway improvement Project. The four-step TDF Process has generally been used to forecast travel demand and analyze the effects of diverted travel demand based on the given Origin-Destination trips in the future. Transportation system improvements, however, generate more travel, Induced Travel Demand (ITD) or latent travel demand, which has not been considered in the project evaluation. The Purpose of this study Is to develop a model which can forecast the ITD applied theory of economics and the Program(I.D.A) which can be widely applied to project evaluation analysis. The Kang-Byun-Book-Ro expansion scenario is used to apply and analyze a real-world situation. The result highlights that as much as 15% of diverted travel demand is generated as ITD. The results of this study are expected to improve reliability of the project evaluation of the highway improvement Project.

Developing u-Service Evaluation Methodology for Optimal u-Service Group of u-City Project (u-City사업의 최적 u-서비스군 선정을 위한 가치평가모형 (u-SEM) 개발)

  • Byun, Wan-Hee;Cho, Hyun-Woo;Lee, Yong-Taeck
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.3
    • /
    • pp.153-164
    • /
    • 2007
  • Nowaday, in Korea, many u-City projects have been developed as a core business in the new town development project by national or local level of government. However, the new business projects have some problems, such as excessive number of u-services, increased project funds and period, and lower u-services due to lack of u-service evaluation methodologies. Therefore, this paper proposes a new u-service evaluation methodology to solve current problems. The methodology gives an ability to guard general u-service groups for reaching the main goal of the u-City project, and then select alternative u-service groups against being limited by the law and technology in the project year. Besides, as a key variable on performing u-City plans, the complexity between stakeholders is considered in the methodology. Finally, through the Optimal Sequential Method in the methodology, the maximum value of u-service group is obtained as a optimal service group of u-City.

  • PDF