• Title/Summary/Keyword: Project evaluation

Search Result 2,337, Processing Time 0.032 seconds

Improvement of Detailed Indicators and Application of Methodology for Post-Evaluation of National River Project (국가하천사업 사후 평가를 위한 세부지표 개선 및 방법론 적용)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.188-196
    • /
    • 2021
  • Korea has invested heavily in projects related to national rivers, but there is no evaluation technique and system to manage river projects that can evaluate the effectiveness of the river projects after they are completed. Their absence leads to the inability of information on river construction sections, analysis of project effects, and benchmarking between projects. This may cause over-budget, overlapping investment problems due to the implementation of similar projects in the same section, and incorrect business elements may be repeatedly utilized. In order to solve this shortcoming, this study developed river project evaluation techniques and a river project (construction) management system. The development of evaluation techniques enables comparison and analysis between projects and can be utilized in establishing maintenance plans. The system can also provide inquiry of construction information, visualization of construction, and management of performance items. In this study, the evaluation techniques developed through prior research were modified and supplemented, and the effectiveness was verified by applying them to national river projects in A river and B river. It is expected that the evaluation techniques and system utilization measures presented will increase the work efficiency of river projects and enhance the efficiency of river projects.

SERVICE QUALITY EVALUATION INDICATORS FOR ASP-BASED PROJECT MANAGEMENT INFORMATION SYSTEM

  • Lee, Seul-Ki;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1453-1462
    • /
    • 2009
  • It is very important for performance of information system that we make an effort to raise user's satisfaction by continuously grasping user's requirement by evaluation of PMIS based on ASP service quality and reflecting this to information system. However, It is lack that developments of suitable evaluation index of PMIS based on ASP service quality. Hereupon, In this study, we propose the evaluation indicators. First, The evaluation area is classified by form the foundation of D & M IS Success Model (2003); system quality, information quality, service quality. Second, The detail evaluation item which include considerations which are gotten through investigation of the construction industry and PMIS based on ASP is grouping by form the foundation SERVQUAL which is a service quality evaluation tool proposed PZB(1988). It is suitable to evaluate PMIS based on ASP service quality in construction industry and able to evaluate various aspects.

  • PDF

Standardization for Post-Construction Evaluation Report (건설공사 사후평가결과보고서 표준화 방안)

  • Kim, Kyong hoon;Lee, Chankyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

An Analysis of Influence on the Selection of R&D Project by Evaluation Index for National Land Transport R&D Project - Focusing on the Technology Commercialization Support Project - (국토교통연구개발사업 평가지표별 연구개발과제 선정에 대한 영향력 분석 - 국토교통기술사업화지원 사업을 중심으로 -)

  • Shim, Hyung-Wook
    • Journal of Industrial Convergence
    • /
    • v.20 no.2
    • /
    • pp.1-9
    • /
    • 2022
  • As the need for improvement of transparency and fairness in the selection of national R&D projects has been continuously raised, we analyzed the impact on the evaluation selection results by evaluation indexes for The land transportation technology commercialization support project and searched for ways to improve indexes using the analysis results. As for the research data, it were applied as selection results of new R&D projects and evaluation indexes in two fields(SME innovation and start-up) in 2021. Logistic regression analysis is used for the influence of each evaluation indexes on the evaluation result, and for the regression model, evaluation indexes with low influence are removed in advance through artificial neural network multiple perceptron analysis to improve the reliability of the analysis results. As a result of the analysis, in the field of SME innovation, the influence of the evaluation index on the workforce planning was the lowest and the influence of the appropriateness of commercialization promotion plan was the highest. In the start-up field, the influence of the evaluation indexes for technology development suitability, marketability, and suitability for carrying out the project were estimated to be similar to each other, and the influence of the technology evaluation index was found to be the lowest. The analysis results of this thesis suggest the need for continuous improvement of selection and evaluation indexes, and by using the analysis results to select a fair R&D institution according to the selection of appropriate indexes, it will be possible to contribute to deriving excellent research results and fostering excellent companies in the field of land transportation.

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Evaluation of Healthy City Project Using SPIRIT Checklist: Wonju City Case (SPIRIT 체크리스트를 활용한 건강도시평가: 원주시 사례)

  • Nam, Eun-Woo;Moon, Ji-Young;Lee, Albert
    • Korean Journal of Health Education and Promotion
    • /
    • v.27 no.5
    • /
    • pp.15-25
    • /
    • 2010
  • Objectives: The objectives of this study was to evaluate Wonju Healthy City project and identify its problems, and seeking a way for its improvement based on the Healthy City project philosophy and strategies. Methods: We used the SPIRIT Checklist that was a process evaluation tool and developed by Alliance for Healthy Cities for the study. We analyzed 39 related materials and gathered opinions on the evaluation result with Healthy City Team staffs, related department staffs and the advisory committee. Finally, a joint meeting with AFHC SPIRIT evaluation expert verified the result of the analysis. Results: The evaluation of Wonju Healthy City project confirmed that Wonju city is equipped with the resources, such as mid-term plan, infrastructure, cooperative organizations, and the Healthy City network to enable the consistent implementation of the Healthy City project based on strong political commitment. However, the necessity of additional complementary processes as well as the application of further improvements to assist health promotion strategies was evident. Conclusion: It is required to improve Wonju Healthy City project that activation of health promotion programs based on the political support and cooperation with public health center and Healthy City project departments in city hall.

Environmental Assessment for Decision Making in Water Resources Projects (수자원사업 의사결정 지원을 위한 환경성 평가 방안)

  • Kim, Gil-Ho;Kim, Woo-Chan;Yeo, Gyu-Dong;Yi, Choong-Sung
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.291-306
    • /
    • 2011
  • It is important to evaluate the environmental effect before performing the project and it should be tried to minimize the negative effects through the project planning based on the evaluation. This study aimed to determine environmental criteria and suggest the procedure for evaluating and scoring the environmental change through water resources projects. In evaluation criteria it was involved in water quality, landscape and ecosystem. And we suggested a valuation indicator and utility functions using MAUT in each criteria determined. In assessment procedure, it is involved in quantitative or qualitative estimation at before and after of project. Meanwhile, we suggested that it is desirable to determine the relative weighting of criteria whenever individual project's assessment performed for considering characteristics of the project. To this end, we verified the applicability of the procedure suggested on case. From this study, it will be used in decision making process of water resource project involved in environmental attributes.

A Study on Evaluation Criteria of Design Project though a Case Study of Introduction to Engineering Design Course (공학설계입문 운영사례를 통한 설계과제 평가기준 탐색)

  • Ryu, Kyung-Hyun
    • Journal of Engineering Education Research
    • /
    • v.14 no.6
    • /
    • pp.31-40
    • /
    • 2011
  • This paper explores and proposes the evaluation criteria of design projects in the entry-level design course. In the entry-level engineering design course the students proceeds various design projects to understand the concept of engineering design process and to develop the creativity. The evaluation criteria of design projects is very important component because the outcome of students in the engineering design course are effected from the evaluation criteria that enforces the students to focus on doing their task. According to this case study the evaluation criteria can be good solution to evaluate the design projects. By the outcome standard of ABEEK on the entry-level engineering design course the evaluation criteria was selected with the results of design projects such as design plan, report, handicrafts, objectives.

Some Considerations of the Evaluation and Its Analysis on tile Profitability of the Investment Project. -On the Calculation and Analysis of IRR in Casting Facilities- (투자사업의 수익성 평가 및 분석에 관한 소고 -주물시설에 대한 IRR를 중심으로-)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.53-62
    • /
    • 1979
  • A widely accepted indicator of a project's economic potential is the internal rate of return (IRR). The primary objective of feasibility analysis for any project is to measure the economic potential for the project, normally defined as the expected return on capital investment. The analysis should be designed to determine whether a project is technically and economically sound, and under what conditions. Therefore, there are factors other than economic potential that must be taken into account in the reasonable composition of an investment program. These kinds of factors can be given proper consideration in project selection after the economic feasibility of alternative projects has been determined. The primary reason for having to choose among different projects is that capital resources are scare : the investment budget is limited. The case project, casting facilities investment project, treated in this paper were selected for their value in illustrating the methods of feasibility analysis. This case project an actual potential project and is analyzed on the basis of the best available data for the specific conditions for that project.

  • PDF