• 제목/요약/키워드: Project Value Objective

Search Result 106, Processing Time 0.025 seconds

Prediction of the construction cost indices for construction cost of the public and permanent rental house (국민·영구임대주택 건축비 산정을 위한 공사비지수 예측 연구)

  • Kang, Gou-Ue;Lee, Ung-Kyun;Kim, Chun-Hak;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.111-112
    • /
    • 2012
  • Korean government is planning to supply a half million public and permanent rental houses from 2013 to 2018 for settlement of non-homeowners. It is requested an objective criterion to appropriate the budget for the rental houses construction project cost. In this study, construction cost indices, which reflect the inflation trend of construction resources, were explorated to suggest a effective methodology for the construction cost estimation of therental houses. We figured out the future construction cost indices using several scientific methods, and seven estimated indices values were shown. It is required an additional research to select the proper value among the analyzed indices.

  • PDF

Design Optimization Using Conflicting Building Information - A case Study Focused on the View and Structure in High-Rise Building Design

  • Cheon, Janghwan
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.69-75
    • /
    • 2013
  • Within residential high-rise market there are many value determining factors. Site condition, view, program, units and structure are important parameters that are directly related to the financial aspect of the project. However, most of the studies of high-rise building design focus on the facade and the shape strategies from an esthetic point of view without considering these factors. The objective of this study is to investigate new design approach that incorporates site, program and structural information at an early stage as a generator of building form and explore a wide range of strategies to negotiate these factors in the process of design/decision making. Not being based on designer's subjective preference or style, architects still can create interesting building design through integration and negotiation of various building information. Since this form is based on real data, not just play of form, we can expect that this form has great potential to be developed into real one at the later design phase.

CRITICAL FACTORS AFFECTING SAFETY IN THE SINGAPORE CONSTRUCTION INDUSTRY

  • Sze Ming Woo;Charles Y.J. Cheah;Wai Fan Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.759-768
    • /
    • 2007
  • Construction is one of the most hazardous industries due to its unique nature. Recent occurrences of highly publicised and criticized construction site accidents have highlighted the immediate need for the construction industry to address safety hazards. Safety used to be addressed as an isolated issue in the past, but the problem of safety is an emergent property of a system. In general, it seems that both industrial practitioners and government officials have tended to address safety by focusing on technical aspects and looking for immediate causes of accidents after they have taken place. The objective of this paper is to examine issues and critical factors that affect the safety standards from a holistic point of view. The job of making worksites safe should not just fall squarely on the contractors but should be shared by all parties in the value chain of construction activities.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Measurement of S/W Development Processes and Maturity using Agile Methodologies (Agile 방법론을 이용한 S/W개발 프로세스 및 성숙도 측정)

  • Kim, Tai-Dal
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.147-154
    • /
    • 2015
  • Recently agile development process became increasing effectiveness, quality, attention to experts in customer satisfaction, as evidenced in this methodology when selecting projects promoting productive efficiency. With regard to contemporary needs and user requirements on the methodology selected to meet this paper is the product based Cross functional team suggested methodology Feature Team model to solve problems of this model, and organizing the Cross functional team, this team but this outcome (product) basis, were examined for the model that points to progress the development across multiple product as a functional unit, value-driven agile project through the Skills-based model and proposed a difference. And it examined the Agile Maturity metrics. PRINCE2 Agile Health-check entries future development direction of Agile techniques is a requirement of the project outset has studied the subject objective evaluation by the assumption that they can be changed at any time, not fixed this way and for the project team through research The proposed.

A Study on the Economic Impacts of Ubiquitous Spectrum Monitoring Project (유비쿼터스 전파감시 사업의 경제적 효과 분석 연구)

  • Yoo, Seung-Hoon;Lee, Joo-Suk
    • Informatization Policy
    • /
    • v.17 no.3
    • /
    • pp.57-73
    • /
    • 2010
  • The objective of this study is to assess the economic impacts that ensue from the ubiquitous spectrum monitoring project(u-SMP) by employing a contingent valuation method(CVM) to provide policy-makers with useful and responsible information. Importance of investigating the u-SMP service and its economic desirability cannot be overemphasized to actively cope with varying environment for spectrum use in that the spectrum monitoring contributes to the public welfare. According to estimating results, annually WTP per household is 1,268 Korean Won. Consequently, the annual benefit of u-SMP is about 7.9 billion Korean won. This result contributes to robust policy-makings for the u-SMP, to uncovering the economic value of the u-SMP, and to obtaining policy implications for activating the spectrum use.

  • PDF

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

Public Art Work for Creating Hangang Artpark - Focus on A Project 'Thinking of Each Other' -

  • Maeng, Wookjae
    • Journal of recreation and landscape
    • /
    • v.12 no.4
    • /
    • pp.67-78
    • /
    • 2018
  • Hangang Artpark construction is an enterprise founded in 2018 that involved installing public artworks created by 37 different people (teams) in Hangang Park located in Yeouido and Ichon Park. An iconic public space in Seoul, Hangang Park is turning into an even better public space due to the efforts to change the park into an eco-friendly, cultural-artistic space in tandem with the change in times. The objective of the Hangang Artpark construction business is to augment the environmental and scenic value of Hangang not only to provide a space for leisurely activities but also to revive it as a cultural-artistic area. This is a study of the concept and the design and installation processes of "Thinking of each other", a project by the Hangang Artpark construction business. This art piece has been installed in the wetlands and it trails along Ichon Hangang Park, which was created during the environmental recovery project. The piece consists of sculptures molded into animal shapes that are unique to the location and ecology of the area, displayed in harmony with the park's street furniture. By showing the coexistence of animals that existed in Hangang in the past along with the current inhabitants and the natural enemies of these inhabitants, the piece displays an ecofriendly scene. Moreover, by incorporating this piece into the street facilities of the park, such as gazebos, streetlights, surveillance cameras, and perches, the piece exhibits a different kind of street view compared to the installation style of other conventional environmental artworks. The various sculptures are installed along with the street facilities throughout the trail, rather than in a specific location intended for artworks, thereby achieving harmony with the park scene. In so doing, the piece elicits in the beholder an environment-friendly way of thinking, and at the same time, gives them a sense of calm and pleasure. Further, the paper researches the methods of safely installing art pieces in public spaces and of maintaining these installations.

The Roles and Challenges of Agricultural Extension Program Evaluation (농촌지도사업 프로그램 평가와 농촌지도사의 역할)

  • Park, Duk-Byeong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.10 no.1
    • /
    • pp.43-56
    • /
    • 2003
  • Evaluation in both an art and a science. The art of evaluation involves working with the management to agree upon purpose and users of results, creating design and gathering information that are appropriate for a specific situation and a particular policy making context. The value of evaluating extension p개grams has received a lot of attentions recently, and many extension educations see evaluation as an integral part of their work. The science of evaluation involves determining standards and developing indicatiors, selecting methods appropriate to gather information in a systematic way, analyzing information to assist in determining the value of the program in an objective manner. First, extension specialists have to consider relative merits about methods of gathering evaluation data. Selection of method should be influenced by the type of information desired, time availability, and cost of using the method. Second, good evaluations involve stakeholders at all stages including planning, implementation, and utilization of results. Third, far from being an "add-on ," evaluation begins with the initial planning of an educational program. Fourth, it is important for extension specialists that although evaluation is valuable and essential in any effective program, one of the biggest mistakes of extension program evaluators in to promise results that cannot possibly solve all the problems of project.

  • PDF

BIM-enabled Quantitative Indicators for Analyzing Building Circulation in Early Phase of Design (설계초기 동선 분석을 위한 BIM기반 정량 평가지표 및 평가체계에 관한 연구)

  • Shin, Jaeyoung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.4
    • /
    • pp.147-155
    • /
    • 2016
  • In order to ensure a certain level of the quality of design, standardized evaluation indicators are being used as an objective criterion. Even though the evaluation indicators are quantifiable, limitations such as inefficiency and inconsistency caused by manual task in the evaluation process still have been found. BIM (Building Information Modeling) technology that is commonly adopted in architectural design process provides an environment which enables us to figure out a building model to be interpreted quantitatively with the basis of the building information model. It supports quantitative, consistent, accurate and quick evaluations so as to improve quality of design even in the initial design phase. This paper aims to establish BIM-enabled quantitative indicators and an evaluation framework to analyze building circulation even in early phase of design. The indicators are composed of 4 types (relative distance, accessibility, simplicity, pedestrian friendliness) and 7 sub-types. The evaluation framework is the process to derive Parameterized Path Value (PPV) as weighting on each indicator. For demonstrating the scalability of the suggested evaluation indicators and the framework, the authors implemented an evaluation tool and a case study has been carried out by using an actual building remodel project.