• Title/Summary/Keyword: Project Types

Search Result 1,158, Processing Time 0.029 seconds

A Study on the Contingency Model for S/W Development Project Management (S/W 개발 프로젝트 관리를 위한 상황 모형 연구)

  • Hong Myung-Hon;Kim Jeong-Gon;Kim Shin-Kon
    • Journal of Information Technology Applications and Management
    • /
    • v.13 no.2
    • /
    • pp.145-162
    • /
    • 2006
  • Despite the careful attention paid by managers and researchers to the effective administration of the S/W Development Project, there are cases where the project goes over-budget or misses deadlines. Existing research blames these problems on task complexity or mismanagement. In order to verify the results that varied according to the fitness between the Task Characteristics and the Project Management Types, a contingency model was employed. The verification of the contingency model demonstrated that the greater the task complexity, the greater the effectiveness of the project coordination, and the lesser the task complexity, the greater the effectiveness of project control. This research is theoretically important in that it develops a composite model to verify the relation between the three factors of Task Characteristics, Project Management Types, and Project Performance that compose the S/W Development Project.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

A Study on establishment of urban regeneration project models and evaluation indexes - Focused on Public project - (도시재생 평가지표와 재생모델 설정에 관한 연구 - 공공부문 시행을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.3
    • /
    • pp.53-60
    • /
    • 2011
  • The purpose of this study was to propose the urban regeneration project model that reinforce public functions and contribute effectively to urban development. The results of this study were as follows. First, this study developed objective 22 different types of evaluation indexes. The indexes allows to figure out the necessities, business value and conditions of certain urban regeneration project. Second, the urban is divided to 6 types by characteristics of functionality and location. So, each regeneration project model can be applied to meet the condition of the urban.. Third, this study proposed 5 types of urban regeneration project model to fulfil roles of public and encourage the urban development. The urban regeneration project model is supposed to perform the evaluation of urban condition using the index, typological analysis under the law and scheme and analysis of function and urban location.

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Effects of Peer Feedback Types and Feedback Acceptance Levels on Academic Achievement in Middle School Project-based Learning

  • JIN, Myunghwa;LIM, Kyu Yon
    • Educational Technology International
    • /
    • v.20 no.1
    • /
    • pp.57-81
    • /
    • 2019
  • This study aimed to investigate effects of peer feedback types and feedback acceptance levels on academic achievement in project-based learning. The participants were 70 middle-school students taking an English course. They were divided into corrective and suggestive feedback groups. These participants were asked to create user-created content (UCC) as an individual task and provide peer feedback on a peer's UCC in the same type of feedback group. Results showed that there were significant differences in academic achievement according to peer feedback types (corrective vs. suggestive) and feedback acceptance levels (high vs. low). In particular, the suggestive peer feedback group had higher academic achievement than the corrective peer feedback group. Moreover, the group with a high level of feedback acceptance gained higher academic achievement than the group with a low level of feedback acceptance. Moreover, there was an interaction effect between peer feedback types and feedback acceptance on academic achievement. These results indicate that peer feedback types and feedback acceptance should be considered for effective peer feedback activity. These findings provide practical implications for the design and implementation of peer feedback activity in project-based learning.