• Title/Summary/Keyword: Project Stakeholder Management

Search Result 73, Processing Time 0.029 seconds

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

Contextual Models of Business Application Software Architecture

  • Koh, Seokha;Ji, Kyoung-Sook
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.3
    • /
    • pp.1-18
    • /
    • 2013
  • Software architecture is the blueprint for a software system and should provide consistent guidelines for design, implementation, and maintenance throughout the entire lifecycle of the system. Components, interactions between the components, well-formed structure, reasons, and various perspectives reflecting various stakeholders' concerns changing through the phases of software lifecycle are the key elements of software architecture. The architect identifies and engages the stakeholders, understands and captures stakeholder's concerns including those regarding life cycle, and lets the concerns reflected in the architecture. To do so, architect should take into consideration various contextual elements regarding the system too. We make an extended list of the elements, especially those of business application software architecture, that the architect should take into consideration and construct a model of the relationships between the elements.

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

A Study on the Conceptual Design of Integrated Management System for Public SW Project Information (공공 소프트웨어(SW) 사업정보 통합 관리체계의 개념적 설계에 관한 연구)

  • Shin, Kitae;Park, Chankwon
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.2
    • /
    • pp.199-216
    • /
    • 2019
  • The public SW market is 3 trillion won, which is less than 10% of the total SW market. However, due to the nature of the domestic market, it is an important market with a relatively large impact on small and medium-sized software companies. In this market, government is operating the Public SW Project Demand Forecasting System in order to support the marketing activities of small and medium sized SW companies and establish a fair market order. The current system has limitations such as lack of user convenience, insufficient analysis capability and less business connection. This study was conducted to identify the problems of these systems and to propose a new system for improving the convenience of users and expanding the information utilization of SMEs. To this end, we analyzed the requirements of each stakeholder. We proposed the 2-phased forecasting cycle, the management cycle, and the system life cycle of public SW projects and created a unified identifier (UID) so that the information of those projects can be identified and linked among them. As a result, an integrated reference model of project information management based on system life cycle was developed, which can explain the demand forecasting and project information, and the improved processes was also designed to implement them. Through the result of this study, it is expected that integrated management of public SW projects will be possible.

On the Development of an FMEA Method for Automotive Safety Utilizing Design Traceability (자동차 안전성 설계에서 설계 추적성을 활용한 고장형태 영향분석에 관한 연구)

  • Lim, Gwan-Taik;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2013
  • In modern systems design and development, one of the key issues is considered to be related with how to reflect faithfully the stakeholder requirements including customer requirements therein, thereby successfully implementing the system functions derived from the requirements. On the other hand, the issue of safety management is also becoming greatly important these days, particularly in the operational phase of the systems under development. An approach to safety management can be based on the use of the failure mode effect and analysis (FMEA), which has been a core method adopted in automotive industry to reduce the potential failure. The fact that a successful development of cars needs to consider both the complexity and failure throughout the whole life cycle calls for the necessity of applying the systems engineering (SE) process. To meet such a need, in this paper a method of FMEA is developed based on the SE concept. To do so, a process model is derived first in order to identify the required activities that must be satisfied in automotive design while reducing the possibility of failure. Specifically, the stakeholder requirements were analyzed first to derive a set of functions, which subsequentially leads to the task of identifying necessary HW/SW components. Then the derived functions were allocated to appropriate HW/SW components. During this design process, the traceability between the functions and HW/SW components were generated. The traceability can play a key role when FMEA is performed to predict the potential failure that can be described with the routes from the components through the linked functions. As a case study, the developed process model has been applied in a project carried out in practice. The results turned out to demonstrate the usefulness of the approach.

The Role of Public Developer in Urban Regeneration Projects

  • Lee, Sam-Su;Jeong, Kwang-Jin
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.59-71
    • /
    • 2017
  • With the passing of Special Act on Promotion and Support for Urban Regeneration (will be hereafter referred to as the Urban Regeneration Special Act) in December 2013, urban regeneration projects have begun in full scale. 13 regions including Jongno District, Seoul were selected as the urban regeneration leading area in 2014 and 33 regions as urban regeneration general regions in 2015 to push ahead a nationwide urban regeneration front supported by government funds. However, it is not clear if these urban regeneration projects will be revitalized by the sole means of government's financial support. Above all, cooperation among all interested parties including the central government that is propelling urban regeneration, local governments, state corporations, private entities, and citizens is urgent. In an urban regeneration project, delegation between state and private entities is absolutely crucial. The central government and the pertinent local government must provide their support by forming new policies and repairing old institutions that are right for urban regeneration, securing the necessary subsidy, and outsourcing government-owned land development. A state corporation must play its part in every aspect that requires public character such as an overall project management of an urban regeneration project, cooperation with the local government, and infrastructure installation. The private stakeholder must share his private capital and know-hows as a construction investor and a development businessman to make possible a successful urban regeneration project. In order for these public and private entities to cooperate with one another, it is necessary to reestablish the role of a public developer and contemplate running an urban regeneration project that permeates public character through a public developer.

Project Participants Cooperative Decision Making Model with QFD-based VE Technique (프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델)

  • Lim, Chulhee;Chun, Jaeyoul;Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2019
  • VE analysis is a method to secure definite functions and performance by defining user's various requirements clearly and propose alternatives to reduce cost. However, the present domestic VE project has difficulty in defining design function analysis clearly due to time constraints as well as difficulty in effective and efficient communication between project stakeholder. Domestic results of VE were largely focused on reducing cost while maintaining the functions of the existing facility. Therefore, this study aims to secure the optimal functions for users according to the original intent of user requirements through QFD-VE model which project VE participants can make collective and cooperative decision making. QFD-VE is a technique that first, it can make collaborative decision making in defining and modifying of design function and setting the importance of requirement function. Second, it allow project VE participants to check design interference and conflict between neighbor systems. This study also provided a mathematical model for implementing the computer system using QFD-VE in the future.

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • v.20 no.6
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

Public-Private Partnerships in International Development Cooperation: Avoiding the Pitfalls to Make a Difference

  • Lussier, Dr Kattie
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.30-31
    • /
    • 2015
  • PPPs in international development cooperation can be challenging due limited capacities in the country, weaknesses in terms of policy and legislative frameworks, differences in mindsets, values, work ethics and hierarchical structures as well as cultural issues. These can lead to misunderstandings and implementation problems. However, a careful assessment of the situation on the ground, stakeholder analysis and needs assessment can help to identify potential bottlenecks and address capacity constraints that could slowdown operations. A sound understanding of local power dynamics and work practices can help to put in place an exit strategy which will enhance the projects' sustainability. Making sure that goals and objectives are understood in the same way by all partners, establishing an ongoing and respectful dialogue between them, as well as transparent implementation and monitoring mechanisms can also contribute to the PPP's success and increase the likeliness to make a difference in the lives of those in needs.

  • PDF

A Study of Environment Analysis Method for Information Strategy Planning based Scenarios (시나리오 기반의 정보화전략 계획 수립을 위한 환경 분석 방법 연구)

  • Hong, Jin-Woo;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.195-203
    • /
    • 2016
  • This paper, which was performed for an environmental analysis step in the information strategy planning, proposes the capable method of building a foundation which can improve the quality of results. An existing environment analyzing method is composed with external environment analysis, internal capacity analysis and information direction deriving activity. At the first stage of environment analysis, with current state analysis, preparation of interview with major stakeholder of project, carrying out the interview, added the activities to gain initial direction of the information. Then it applied a key-questioning of convergence scenario-based analysis for external environment analysis and internal capacity analysis. Performing the external environment analysis and internal capacity analysis with analysis model, convergence application of scenario-based analysis model was enabled to verify information direction on the initial setting. The result was applied at actual project site and was enabled to perform the project quickly, and to improve the quality of project results.