Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

Improvement of Human Motivation in Lean Construction Implementation (린 건설 수행에 따른 인적자원의 동기유발)

  • Kim, Dae-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.130-137
    • /
    • 2006
  • Since Lean Construction has been introduced in 1992, much research is in progress to popularize lean concepts and principles. Most research focuses on developing lean concepts and tools and strengthening the limited domain of instrumental rationality and technical efficiency. However, the basic concepts of human resource management seem to be ignored by those who advocate lean production. Thus, the lean construction research related to human resource management must be once considered for popularization and activation of lean construction at the beginning stage in the domestic construction industry. Because human resources have a major influence on lean implementation and its success, especially at the beginning stage of lean construction. This paper considers the human resource requirements for the implementation of lean construction in the USA construction industry. The results from the study will provide the foundations to adapt lean construction into the domestic construction industry. Consequently, the study found that lean construction could improve the capability of human resource and human motivation if effectively implemented in the construction sites. Since lean construction emphasizes and focuses on improvement of relationships among project participants, constant application to human resource management is crucial for successful lean implementation.

A Study on the Development of Information Strategic Planning for Green & Smart IT in Government-supported Research Institutes : Focused K Research Institute (정부출연 연구기관의 그린&스마트IT 정보전략계획 수립에 관한 연구: K연구원을 중심으로)

  • Cho, Sung Nam;Kim, Jae Sung;Jung, Chul Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.8 no.1
    • /
    • pp.37-50
    • /
    • 2013
  • Typical areas of recent changes in IT field is the progress of the Green & Smart IT. The primary purpose of this study is to establish information strategic planning for Green & Smart IT of government-supported research institutes. To this purpose, we developed the information strategic planning for Green & Smart IT environment based on the comprehensive analysis about the status of the related policy trends and relevant organizations' business. In particular, the establishment of information strategic planning was to target K research institute, a representative institute in the field of information analysis and distribution in Korea. And we developed implementation projects and long-term road-map for its effective and efficient promotion. Through the evaluation of priority testing based on their importance and viability of business to targe derived implementation projects, 12 critical implementation projects were selected. Then the target system and concrete action plan for each critical implementation project were presented. Based on the results of this study, we provide government-supported research institutes with useful implications for establishing a correct orientation for the introduction and promotion of Green & Smart IT in the future.

  • PDF

Conservation Process of Large-earthen ware in Geumgangsa Temple Site - A Study on the Cyanoacrylate Adhesive Used for Large-earthen Ware Joining - (금강사지 출토 대형 토기의 보존 - 대형 토기접합에 사용된 순간 접착제에 대한 연구 -)

  • Lee, Dahae;Hwang, Hyunsung;Shin, Minkyeong
    • Conservation Science in Museum
    • /
    • v.13
    • /
    • pp.1-11
    • /
    • 2012
  • While the project for registering the unregistered relics that had been stored in the relic storage warehouse was in progress, restoration operations were started for the large size pottery pieces that had been excavated from the Geumgangsa Temple Site and it is attempted to explain the pottery pieces and to introduce the process of the overall conservation treatment. About 600 pieces of large size pottery had been separately stored in more than 40 relic boxes in their original damaged condition without making it possible to figure out their shape, size, usage and quantity at all. Due to the enormous number and weight of the pottery pieces, they were, first of all, pre-classified largely into 6 groups of pottery pieces in consideration of the visible features such as pottery thickness, color sense and glaze brilliance, etc. for each kind of pottery raw material. However, as a result of making them adhere together on a temporary basis, they turned out to be only one piece of pottery in reality. In this restoring process, in order to see if the generally used cyanoacrylate adhesive was in fact safe when a very large, heavy and deformed pottery piece was to be put together, its safeness was checked by examining the adhesion velocity, adhesion strength and dissolution velocity for both from low to high viscosities through preliminary experiments. In order to restore the lost parts after putting the existing pieces together, diversified epoxy resins were used to fit their shapes. Considering that the bottom of the restored relic was shaped to be not flat but round without allowing it to stand alone, an exhibition mount was manufactured so that the relic could be stored stably and used readily for exhibition.

Analysis of Trial Test for ATP On-board Equipment of Tilting Train (틸팅열차 ATP 차상장치의 시운전시험 분석)

  • Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3911-3916
    • /
    • 2010
  • In this paper we describe contents and results on running test for ATP on-board equipment, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. We developed tilting trains for the speed-up of conventional lines and for the passenger service improvement where the KTX is not available. And we made progress the operation trial test in the 120,000 km distance with the use of ATS equipment, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. We decided to accelerate the speed for more than 200km/h with respect to the 6 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should have installed an ATP on-board unit in tilting trains and verified the operational suitability, therefore we installed the same ATP on-board unit on tilting trains as that used in the ATP construction project on Gyeongbu-line and Honam-line, and verified that the function and performance of the installed ATP on-board unit conformed to the tilting trains operation.

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

A Study on Dose Distribution Programs in Gamma Knife Stereotactic Radiosurgery (감마나이프 방사선 수술 치료계획에서 선량분포 계산 프로그램에 관한 연구)

  • 고영은;이동준;권수일
    • Progress in Medical Physics
    • /
    • v.9 no.3
    • /
    • pp.175-184
    • /
    • 1998
  • The dose distribution evaluation program for the stereotactic radiosurgery treatment planning system using a gamma knife has been built in order to work on PC. And this custom-made dose distribution is compared with that of commercial treatment planning program. 201 source position of a radiation unit were determined manually using a gamma knife collimator draft and geometrical coordinates. Dose evaluation algorithm was modified for our purpose from the original KULA, a commercial treatment planning program. With the composed program, dose distribution at the center of a spherical phantom, 80 mm in diameter, was evaluated into axial, coronal and sagittal image per each collimator. Along with this evaluated data, the dose distribution at a arbitrary point of inside the phantom was compared with those from KULA. Radiochromic film was set up at the center of the phantom and was irradiated by gamma knife, for the verification of dose distribution. In result, the deviation of the dose distribution from that of KULA is less than ${\pm}$3%, which is equivalent to ${\pm}$0.3 mm in 50% isodose distribution for all examined coordinates and film verification. The custom-made program, GPl is proven to be a good tool for the stereotactic radiosurgery treatment planning program.

  • PDF

The Critical Factors Affecting Cultural Resources-based Regional Development Strategy (문화자원에 기반을 둔 지역발전전략에 미치는 영향요인 특성과 중요도 분석)

  • Lee, Soonja
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.7
    • /
    • pp.546-556
    • /
    • 2017
  • This study aims to find out the key factors that could influence on regional development strategy to use cultural resources. The methods employed are Meta-analysis with 61 case studies in order to draw related factors and Analytic Hierarchy Process with 68 experts in order to analyze the relative importance of important factors. The main findings are as follows: 26 critical factors are drawn from the case studies and they could be classified into four categories, named as 'the capacity building to excavate and utilize cultural resources which are having potential power', 'the establishment of institutional basis for making projects good progress', 'the boosting of internal capability of locals in the process of project', and 'the preparation of cultural governance and multidirectional networking strategies among persons concerned or stakeholder'. The analysis of relative importance of factors shows that among others, 'the capacity building to excavate and utilize cultural resources which are having potential power' is the most fundamental factors to achieve policy goals. There are few studies that have drawn factors from multi-case studies. In this respect, it is far from being complete but meaningful to a little more enhance the generalization of research findings.

A Study on the Development of a BIM Design Tool for Hanok Windows and Doors (BIM을 활용한 한옥 창호 설계 도구 개발에 관한 연구)

  • Choi, Joong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7331-7339
    • /
    • 2014
  • As the Korean government initiates the Han-style campaign, the efforts and expectations for the modernization and industrialization of Hanok are growing. Accordingly, a major R&D project sponsored by the government is in progress for the development of related technologies, in which the development of a Hanok design support system based on Building Information Modeling(BIM) technology is included as one of the major subjects. However, the development of design tools for Hanok so far has not focused on the windows and doors, which is another major element of Korean traditional architecture. Therefore, this study developed a BIM-based design tool for Hanok windows and doors as an approach to the integrated design of various Hanok elements and their applications to modern buildings. To this end, the characteristics of Hanok windows and doors were analyzed first in terms of the location, opening method, style, components, and the over-all construction. A design tool was then developed with the parametric modeling functions of the $ArchiCAD^{(R)}$system. The applicability and efficiency of the developed tool were verified with design simulations. This is expected to contribute to not only the application of Hanok windows and doors to modern buildings but also to the further development of an integrated Hanok design system.

Core Technologies Derivation of Fusion DEMO Reactor Applying TRL and AHP (TRL과 AHP를 적용한 핵융합 실증로 핵심기술 도출)

  • CHANG, Hansoo;KIM, Youbean;CHOI, Wonjae;THO, Hyunsoo
    • Journal of Technology Innovation
    • /
    • v.22 no.4
    • /
    • pp.145-164
    • /
    • 2014
  • Nuclear fusion is one of the most promising options for generating large amounts of carbon-free energy in the future. Major countries such as China, EU, and Japan have established a national plan for DEMO construction and they are implementing it. Korea has started a nuclear fusion research and development by the KSTAR project started in 1995. There are matured needs for a full-scale research and development initiatives to ensure competition with the major countries for DEMO as well as achieve the final goal to commercialize fusion energy. In this paper, we apply the TRL and AHP methods in order to identify the key technologies to conduct DEMO R&D. We propose the priorities of future R&D on DEMO by deriving a core technology in the field. At first, we review the scientific theory of fusion and trend of progress of DEMO activities in major countries. For previous studies, we review TRL and AHP methods to examine the technology classification system of DEMO and identify key technologies. We apply TRL method to identify readiness level of DEMO technologies and AHP to compensate shortcoming of TRL. The key technologies of DEMO to be secured from a synthesis result of the TRL and AHP are burning plasma, plasma facing material, structural material, high frequency heating, neutral particle beam, safety, plasma diagnostic, and simulation technologies.