• Title/Summary/Keyword: Project Outcomes

Search Result 365, Processing Time 0.023 seconds

A Study on the Development and Application of Rubrics for Performance Assessment in Terms of Promoting Program Learning Outcomes (학습성과 수행평가를 위한 루브릭 개발과 적용에 관한 연구)

  • Shin, Minhee
    • Journal of Engineering Education Research
    • /
    • v.15 no.5
    • /
    • pp.108-118
    • /
    • 2012
  • The purpose of this study was to provide analytic rubrics for measuring teamwork(PO6), communication and presentation skills(PO7), and life-long learning(PO8) based on theoretical concepts of performance assessment and rubrics. Also, this study analyzed data about performance assessment and rubics from courses offered through college of engineering. Participants were 34 senior engineering students who took the course 'Technical writing and presentation'. In the second week of the course, students were given the pre-test instrument which was developed for measuring students' understanding of program outcomes for this study. After performing project activities using rubrics, students were encouraged to complete the post-test instrument and the reaction questionnaire during the ninth week. The data were analyzed by using SPSS 14.0 and Microsoft Excel. The research findings are as follows. First, to promote and evaluate program learning outcomes appropriately, performance assessment-based on rubircs should be implemented. Second, in the reaction questionnaire about the rubircs, students answered that using rubircs for performing the project was very useful for understanding the performance procedures and assessment criteria. Third, the mean of understanding of program outcomes of students in post-test was significantly increased than in the pre-test(p<.0001). From the findings, performance assessment and rubrics should be used as evaluation tools at course levels in terms of promoting program learning outcomes for engineering education.

A Study on the Establishment of the National Spatial Data Infrastructure

  • Hong, Sang-Ki;Shin, Dong-Bin
    • Journal of the Speleological Society of Korea
    • /
    • no.82
    • /
    • pp.13-16
    • /
    • 2007
  • Several research projects funded by National GIS Master Plan have started to produce several outcomes that need to be applied in the real world situation. To make the project results more useful and to improve upon the current results, it is necessary to integrate the project outcomes produced under various circumstances into a consistent and coherent structure.

Evaluation of Project Manager's Leadership in Construction Projects;Based on LBDQ and Pilot Test (건설 현장소장의 리더십 평가 방안에 관한 연구;LBDQ 기법을 활용한 파일럿 테스트를 중심으로)

  • Gang, Ji-Sun;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.209-212
    • /
    • 2007
  • Project managers' leadership in construction projects significantly influence project performance and outcomes. However, due to its conceptual and quantitative nature, leadership is a subject which is difficult to be evaluated or measured despite of the benefits of its measurement. The objective is this paper to apply the LBDQ technique in evaluating project managers' leadership and discuss outcomes through a pilot test.

  • PDF

The Busan Regional CardioCerebroVascular Center Project's Experience Over a Decade in the Treatment of ST-segment Elevation Myocardial Infarction

  • Lim, Kyunghee;Moon, Hyeyeon;Park, Jong Sung;Cho, Young-Rak;Park, Kyungil;Park, Tae-Ho;Kim, Moo-Hyun;Kim, Young-Dae
    • Journal of Preventive Medicine and Public Health
    • /
    • v.55 no.4
    • /
    • pp.351-359
    • /
    • 2022
  • Objectives: The Regional CardioCerebroVascular Center (RCCVC) project was initiated to improve clinical outcomes for patients with acute myocardial infarction or stroke in non-capital areas of Korea. The purpose of this study was to evaluate the outcomes and issues identified by the Busan RCCVC project in the treatment of ST-segment elevation myocardial infarction (STEMI). Methods: Among the patients who were registered in the Korean Registry of Acute Myocardial Infarction for the RCCVC project between 2007 and 2019, those who underwent percutaneous coronary intervention (PCI) for STEMI at the Busan RCCVC were selected, and their medical data were compared with a historical cohort. Results: In total, 1161 patients were selected for the analysis. Ten years after the implementation of the Busan RCCVC project, the median door-to-balloon time was reduced from 86 (interquartile range [IQR], 64-116) to 54 (IQR, 44-61) minutes, and the median symptom-to-balloon time was reduced from 256 (IQR, 180-407) to 189 (IQR, 118-305) minutes (p<0.001). Inversely, the false-positive PCI team activation rate increased from 0.6% to 21.4% (p<0.001). However, the 1-year cardiovascular death and major adverse cardiac event rates did not change. Even after 10 years, approximately 75% of the patients had a symptom-to-balloon time over 120 minutes, and approximately 50% of the patients underwent inter-hospital transfer for primary PCI. Conclusions: A decade after the implementation of the Busan RCCVC project, although time parameters for early reperfusion therapy for STEMI improved, at the cost of an increased false-positive PCI team activation rate, survival outcomes were unchanged.

A Case Study of Course-Embedded Assessment for Program Outcomes in Computer Science & Information Engineering (컴퓨터·정보공학 분야의 교과기반 학습성과 평가 사례연구)

  • Cho, Soosun
    • Journal of Internet Computing and Services
    • /
    • v.17 no.1
    • /
    • pp.73-81
    • /
    • 2016
  • This paper deals with the practical experience and lessons to develop a method of course-embedded assessment for program outcomes in Computer Science & Information Engineering. In engineering education, ABEEK(Accreditation Board for Engineering Education of Korea) has been nominated as an official accreditation from Korean government under some conditions of fulfillment. One of the conditions is enforcement of course-embedded assessment for program outcomes. In this paper, a method of course-embedded assessment in Computer Science & Information Engineering is suggested. The case study was done in a basic project course which includes the special assessment methods in project courses. The case study of course-embedded assessment in a basic project course was given with consideration for each step, that is, set up of program outcomes which are highly related to the course, selection of assessment tools such as written examination and project-based assessment, set up of assessment criteria, implementation of course-embedded assessment, and analysis of results. The proposed method is expected to be a good example to construct the whole strategy for course-embedded assessment in Computer Science & Information Engineering.

The Influences of Perceived Usefulness and Perceived Ease of Use on Learning Outcomes in Team Project-based Learning with Naver Band (네이버 밴드를 활용한 대학 팀 프로젝트 학습에서 지각된 유용성과 지각된 사용용이성이 학습성과에 미치는 영향)

  • Kim, Seyoung;Yoon, Seonghye
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.12
    • /
    • pp.695-706
    • /
    • 2016
  • The present study sought to shed light on specific designs and strategies by investigating the impact that team project-based learning approach using Naver Band had on learning outcomes specifically, on satisfaction and achievement. Variables of perceived usefulness and perceived ease of use were chosen as critical predictors of the learning outcomes. 70 undergraduate students were divided into 18 groups and instructed to work on a team project using Naver Band for 6 weeks. Data analysis was completed using descriptive statistic analysis, correlation analysis, hierarchical regression analysis. Also, descriptions of Band from team reflection journal were analyzed. The major results of the study are as follows: first, perceived usefulness was the significant predictor of satisfaction and achievement. Second, 5 functions were revealed as strengths about Band.

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

A Study of the Effect of PMC and Human Resource Competency on Construction Project Performance Outcomes (PMC (Project Management Consultant)와 인적자원역량이 건설프로젝트성과에 미치는 영향에 관한 연구)

  • Lee, Heonchang;Lee, Jeongryun;Ahn, Byeonghoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.701-710
    • /
    • 2022
  • This study aims to prove the importance and necessity of a project management consultancy (PMC) that systematically manages construction projects to ensure their successful implementation. In order to analyze the interrelationship between the role of PMC and the outcome of the construction projects, structural equation modelling(SEM) was conducted. Hence, one of the critical aspects when conducting the project, human resource competency, especially referring to the competency of project team members and the project manager's leadership, affects the performance of construction projects. As a result of this study, PMC is found to have significant effects on human resource competency and construction project performance. In addition,human resource competency also had a significant effect on construction project performance. Consequently, the research outcomes suggest that introducing PMC services should be done when implementing large domestic infrastructure projects successfully, as doing so will enhance PM leadership and strengthen the capacity of the project team members.

Key Success Factors of Collaborative R&D Projects in the Small and Medium-Sized Companies in the Korean Electronic Parts Industry (우리나라 전자부품 중소기업에 있어서 공동기술개발의 성패요인)

  • 이광회;김영배
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.104-130
    • /
    • 1997
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 80 projects in the Korean electronic parts industry The patterns in this study were categorized into 4 types by two criteria : product types(off-the-shelf/unique) and project initiator (focal/partner). The bivariate relationships revealed that project characteristics (technological complexity, demand certainty), partner characteristics(the number of partners, precious experience), process characteristics (participation in the project formulation, specificity of the collaboration process and outcomes) appear to be different among four types of collaboration. Furthermore, this study found that each type of collaborative R&D projects has different KSFs for their commercial success. The KSFs of type 1 (off-the-shelf product and focal organization initiation), for instance, include the strategic importance of the project, the problem solving performance of the focal organization while those of type 4(unique product and partner initiation) are technological complexity, demand certainty, reliability of partner relationship, specificity of the goals, specificity of the process and outcomes, information sharing. Finally, based on this empirical results, managerial, policy, and theoretical implications of the study were discussed.

  • PDF

TOWARDS A RELATIONAL CONTRACTING FRAMEWORK IN THE AUSTRALIAN CONSTRUCTION INDUSTRY: AN INITIAL FRAMEWORK

  • Melissa Chan;Bambang Trigunarsyah;Vaughan Coffey
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.117-123
    • /
    • 2011
  • The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

  • PDF