• Title/Summary/Keyword: Project Outcomes

Search Result 365, Processing Time 0.021 seconds

Impact of Construction Safety Managers and Project Characteristics on Air Conditioning Installation Safety Scores (건설 안전관리자의 특성 및 프로젝트 특성이 에어컨 설치 공사의 안전 점수에 미치는 영향)

  • Uhm, Miyoung;Kim, Jinyoung;Kim, Hongjo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.381-391
    • /
    • 2024
  • This study examined the factors influencing safety scores in air conditioning installation projects, with a specific focus on the characteristics of safety managers and project-specific details. Given the increase in industrial accidents within this sector and the lack of research on smaller-scale operations, this analysis of 7,046 safety data records from Company A aimed to address this gap. The results indicate that the month of project commencement has the most significant impact on safety scores(correlation coefficient of 0.21), followed by the age of the safety manager(correlation coefficient of 0.06). Interestingly, the educational background of the managers did not appear to influence safety outcomes. Furthermore, project cost was found to have a negative correlation with safety scores(-0.1), suggesting that lower-cost projects may be associated with higher risk levels. These findings underscore the importance of developing tailored safety checklists that take into account the specific timing and scale of air conditioning installation projects. Additionally, the results suggest that incorporating both experienced(older) and less experienced(younger) safety managers into safety strategies may be beneficial for achieving optimal safety outcomes. This balanced approach could leverage the strengths of both groups, potentially enhancing overall risk assessment and mitigation efforts.

Research on Conceptual Designs and Basic Plans of Korea Land Spatialization Program's Proving Ground (지능형국토정보 공동실험장 기초설계 연구)

  • Park, Jae-Min;Jung, Yeun-J.;Park, Dong-Youn;Park, Kwan-Dong;Kim, Byung-Guk
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.1
    • /
    • pp.169-176
    • /
    • 2009
  • Korean Land Spatialization Program(KLSP) is the R&D program of the National GIS Project for developing ubiquitous GIS core technologies under control of Ministry of Land, Transport and Maritime Affairs(MLTM). The first program of KLSP, from 2006 to 2012, initiated with $132 million (US dollars) of national fund and $42 million of matching fund. KLPS which aims 'Innovation of the GIS technology for the ubiquitous Korean land' consists of 5 core research projects and 1 research coordination project to practically utilize and commercialize the results of core research. Korean Land Spatialization Group(KLSG) is planning the KLSP proving ground for testing, integrating, exhibiting the KLSP's outcomes. In the near future, this proving ground would be utilized as a national ubiquitous GIS proving ground. The key objective of this paper is to present the conceptual designs and basic plans. In addition, this paper discusses characteristics of the outcomes which are applied to KLSP proving ground.

  • PDF

The Effect of Microvascular Decompression for Hemifacial Spasm Caused by Vertebrobasilar Dolichoectasia

  • Kang, Jeong-Han;Kang, Dong-Wan;Chung, Sang-Sup;Chang, Jin-Woo
    • Journal of Korean Neurosurgical Society
    • /
    • v.52 no.2
    • /
    • pp.85-91
    • /
    • 2012
  • Objective : Hemifacial spasm (HFS) caused by vertebrobasilar dolichoectasia (VBD) is very rare, and in theses cases, it is difficult to decompress the nerve from its vascular compression. The objective of this study was to investigate the outcome of microvascular decompression (MVD) for HFS caused by VBD. Methods : There were 10 patients of HFS caused by VBD at our hospital between September 1978 and September 2008. We evaluated magnetic resonance angiography (MRA) and time of flight magnetic resonance imaginge (TOF MRI) findings using the criteria for VBD. We compared the clinical outcomes of MVD for the 10 patients with VBD with the overall outcomes of the total 2058 MVDs performed for HFS. Results : The results of MVD for HFS caused by VBD were successful in 90.9% of cases. The postoperative complication rate in VBD was 45.5%. Offending vessels in patients with VBD were identified visually during surgery. Adverse effects after MVD were found in 4 patients. We found that the diameter of VBD was significantly greater in patients with complications than in those with no complications (p=0.028). Conclusion : Our data shows that MVD may be a good treatment modality for HFS caused by VBD but care must be taken to avoid adverse effects from the procedure. It is important to detach the dolichoectatic artery from its surrounding structures sufficiently to allow it to be easily movable. In addition, attempts should be made to lessen the retraction of the cerebellum during release of the dolichoectatic artery.

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

On the Peer-Review Process Model for an Effective Technical Review (효과적인 기술검토를 위한 동료검토 프로세스 모델에 관한 연구)

  • Choi, Yo-Chul;Lee, Jae-Chon;Cho, Yeon-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.376-381
    • /
    • 2009
  • While applying the systems engineering (SE) in systems development, a series of technical reviews play a critical role and is intended to monitor the status of the progress and outcomes of the project for which appropriate technical plans prepared earlier should be executed. It is noted however that during the technical review executed as planned, a lot of problems usually come out. Included are the ambiguity in the reports of the progress status and outcomes, discrepancies among the opinions from different participants, and the delay in carrying out the tasks. To solve those problems in an early stage, informal reviews are usually adopted before the formal technical reviews are held. A type of the informal reviews is the peer review. This paper is concerned with the peer review process model to make the later technical reviews more effective. Specifically, we first review the necessity and meaning of the peer reviews. We then study a model for the peer review process. To model the process, the methods of an IDEF modeling and schema definition have been applied using a computer-aided SE tool, Cradle(R), in the environment of the national research and development project. As a result, the implemented process model can show hew the peer review process is designed and managed to be utilized in the technical review. The documents related with the peer review process can also be generated automatically from the developed model Database. Finally, a general misunderstanding about the peer review and its improvement plan have also been mentioned.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Inhibition of Wntless/GPR177 suppresses gastric tumorigenesis

  • Seo, Jaesung;Kee, Hyun Jung;Choi, Hye Ji;Lee, Jae Eun;Park, Soo-Yeon;Lee, Seung-Hyun;Jeong, Mi-Hyeon;Guk, Garam;Lee, SooYeon;Choi, Kyung-Chul;Choi, Yoon Young;Kim, Hyunki;Noh, Sung Hoon;Yoon, Ho-Geun;Cheong, Jae-Ho
    • BMB Reports
    • /
    • v.51 no.5
    • /
    • pp.255-260
    • /
    • 2018
  • Wntless/GPR177 functions as WNT ligand carrier protein and activator of $WNT/{\beta}$-catenin signaling, however, its molecular role in gastric cancer (GC) has remained elusive. We investigated the role of GPR177 in gastric tumorigenesis and provided the therapeutic potential of a clinical development of anti-GPR177 monoclonal antibodies. GPR177 mRNA expression was assessed in GC transcriptome data sets (GSE15459, n = 184; GSE66229, n = 300); protein expression was assessed in independent patient tumor tissues (Yonsei TMA, n = 909). GPR177 expression were associated with unfavorable prognosis [log-rank test, GSE15459 (P = 0.00736), GSE66229 (P = 0.0142), and Yonsei TMA (P = 0.0334)] and identified as an independent risk predictor of clinical outcomes: GSE15459 [hazard ratio (HR) 1.731 (95% confidence interval; CI; 1.103-2.715), P = 0.017], GSE66229 [HR 1.54 (95% CI, 1.10-2.151), P = 0.011], and Yonsei TMA [HR 1.254 (95% CI, 1.049-1.500), P = 0.013]. Either antibody treatment or GPR177 knockdown suppressed proliferation of GC cells and sensitized cells to apoptosis. And also inhibition of GPR177 suppresses in vitro and in vivo tumorogenesis in GC cells and inhibits $WNT/{\beta}$-catenin signaling. Finally, targeting and inhibition of GPR177 with antibody suppressed tumorigenesis in PDX model. Together, these results suggest GPR177 as a novel candidate for prognostic marker as well as a promising target for treatment of GC patients.

Development of Activity Pattern Analysis and its Application to the Health Check-up Service Organization (활동패턴분석방법론의 개발과 적용 : 종합건강검진서비스 적용사례를 중심으로)

  • Moon, Jae Ung;Ahn, Joong Ho
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.3
    • /
    • pp.69-92
    • /
    • 2013
  • Activity Pattern Analysis(APA) is the methodology to Design the functions of information systems, to Estimate the monetary value of IS based on Activity Based Costing, to Acquire feasibility of IT Project. This study shows APA case in Health Check-up Service Organization (G-Center) and the Utility of APA. G-Center had acquired Five Outcomes through APA: (1) IT Strategy, (2) IT Project Goals, (3) Transformed Business Process, (4) Functional Blueprint of Information Systems, (5) IT Project budget and its feasibility. APA consists of three analysis processes; Activity Separation, Activity Rearrangement, Activity Costing. APA is flexible in determinating the range and the time of analysis, and is able to expand the Actors(as analysis objects) based on the purpose of analysis by researcher. Eventually APA can be used to do internal IT Management effectively.

Concept of Operations of Procurement Engineering Management Support System

  • Salim, Shelly;Kim, Jin Il;Yeom, Choong Sub;Park, Jong Sun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2018
  • A software support system, called procurement engineering management support system (PeMSS), is currently under development through a joint research project. The procurement-related scenarios considered in this research is as follow: an EPC (Engineering, Procurement and Construction) company receives an EPC project contract and starts the project to deliver the agreed system to the acquirer. In order to acquire the required equipments that the EPC company does not produce by itself, it eventually interacts with subcontractors, also called vendors. The EPC company responsibilities during the procurement activities are twofold. First, the EPC company has to guarantee that it has ordered the equipment, through issuing Purchase Order (PO), based on the requirements stated in the contract. Second, the EPC company has to verify that the received equipment designs, called Vendor Print (VP), meet the specifications in the PO, before finally acquiring the equipments. During our survey study, we discovered that EPC company takes a lot of time and effort to create PO and verify VP, mainly because these activities are performed manually by the responsible engineers. Therefore, we intent to support the above activities by developing a support system to the legacy procurement system that can trace the requirements from the contract to the PO and VP, among other functionalities. At the time of the writing of this paper, PeMMS is still under-development, thus, in this paper we focus on presenting the development steps of PeMMS using systems engineering theory and introducing the PO creation function. Wholly, PeMSS attempts to reduce the time and effort of engineers on the procurements activities while also increasing the quality of the procurement outcomes.

A Case Study on an Artificial Intelligence Fashion Curation Practice Subject through Industrial-academic Project-based Learning (산학 연계 프로젝트 기반 학습(PBL)을 활용한 AI 패션 큐레이션 실습 교과목 운영 사례 연구)

  • An, Hyosun;Park, Minjung
    • Fashion & Textile Research Journal
    • /
    • v.23 no.3
    • /
    • pp.337-346
    • /
    • 2021
  • In the fourth industrial revolution, fashion students are expected to work with various technologies to show creativity. This study aimed to conduct project-based learning(PBL) in collaboration with industry experts to design and operate artificial intelligence(AI) in the practice subject of fashion curation through the industrial academic teaching method. We first looked at teaching methods and strategies incorporating PBL in various academic fields. Next, we analyzed fashion projects and fashion curation services applying AI. Then through the question-and-answer method and by consulting with industry experts, we developed a curriculum for AI fashion curation, applying PBL(fashion market and trend analysis; new styles and time, place, and occasion planning; AI machine learning data set production; curation model development; and evaluation) suitable for the university's educational environment, information technology company conditions, and fashion students. As part of a close cooperation system with the industry, we conducted a 15-week Fashion Project II (Capstone Design) course and evaluated the outcomes and student satisfaction with the course. Students were able to develop new style, and time, place, and occasion categories and to utilize strategies for AI fashion curation services reflecting the unique needs of Millennials and Generation Z. Students showed high satisfaction with the curriculum. Further, it was confirmed that the study successfully applied PBL in class using AI technology in fashion education.