• 제목/요약/키워드: Project Management Model

검색결과 1,830건 처리시간 0.029초

UML기반의 공공부문 정보화프로젝트관리모델에 관한 연구 (A Prefect Management Model for Developing Information Systems in Public Sector with UML)

  • 옹상순;최재현;박제원;이남용
    • 한국IT서비스학회지
    • /
    • 제8권3호
    • /
    • pp.101-109
    • /
    • 2009
  • For half a century, PMM(Project Management Model) continually has been advanced by many researchers and managers. Especially, the model for civil and construct engineering has now high maturity, but the model for IT engineering has not acceptable maturity. PMI(Project Management Institute) provides the knowledge of protect management for general purpose, it is not adequate for IT prefect management without complements. In this paper, we propose IT project management model based the knowledge of PMI using UML. IT project management model provides not only functions for project planning, budgeting, design and Implement, but also the knowledge for managing IT protect efficiently. We use uses case diagrams to describe the details of the model. We expect the model to be used in management of IT project efficiently in public sector.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구 (A Study on the Integrated Conceptual Model of Software Development Project Management System)

  • 문용은;이재범
    • Asia pacific journal of information systems
    • /
    • 제6권1호
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

연구개발 프로젝트관리를 위한 시각화모델 (Dongeui Visual-PERT/CPM for R&D Project Management)

  • 황흥석
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2000년도 추계학술대회 및 정기총회
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

S/W 개발 프로젝트 관리를 위한 상황 모형 연구 (A Study on the Contingency Model for S/W Development Project Management)

  • 홍명헌;김정곤;김신곤
    • Journal of Information Technology Applications and Management
    • /
    • 제13권2호
    • /
    • pp.145-162
    • /
    • 2006
  • Despite the careful attention paid by managers and researchers to the effective administration of the S/W Development Project, there are cases where the project goes over-budget or misses deadlines. Existing research blames these problems on task complexity or mismanagement. In order to verify the results that varied according to the fitness between the Task Characteristics and the Project Management Types, a contingency model was employed. The verification of the contingency model demonstrated that the greater the task complexity, the greater the effectiveness of the project coordination, and the lesser the task complexity, the greater the effectiveness of project control. This research is theoretically important in that it develops a composite model to verify the relation between the three factors of Task Characteristics, Project Management Types, and Project Performance that compose the S/W Development Project.

  • PDF

R & D 프로젝트의 위험분석모형의 연구 (A Risk Analysis Model Using VERT for R & D Project Management)

  • 황홍석
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

제품개발 프로젝트관리 프로세스 개발 (Development of Project Management Process for Product Development)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

SI 프로젝트관리 프로세스 개발 (Development of Project Management Process for System Integration)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제35권3호
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF