Comparative numerical analysis for cost and embodied carbon optimisation of steel building structures

  • Eleftheriadis, Stathis;Dunant, Cyrille F.;Drewniok, Michal P.;Rogers-Tizard, William;Kyprianou, Constantinos
    • Advances in Computational Design
    • /
    • 제3권4호
    • /
    • pp.385-404
    • /
    • 2018
  • The study investigated an area of sustainable structural design that is often overlooked in practical engineering applications. Specifically, a novel method to simultaneously optimise the cost and embodied carbon performance of steel building structures was explored in this paper. To achieve this, a parametric design model was developed to analyse code compliant structural configurations based on project specific constraints and rigorous testing of various steel beam sections, floor construction typologies (precast or composite) and column layouts that could not be performed manually by engineering practitioners. Detailed objective functions were embedded in the model to compute the cost and life cycle carbon emissions of the different material types used in the structure. Results from a comparative numerical analysis of a real case study illustrated that the proposed optimisation approach could guide structural engineers towards areas of the solution space with realistic design configurations, enabling them to effectively evaluate trade-offs between cost and carbon performance. This significant contribution implied that the optimisation model could reduce the time required for the design and analysis of multiple structural configurations especially during the early stages of a project. Overall, the paper suggested that the deployment of automated design procedures can enhance the quality as well as the efficiency of the optimisation analysis.

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언 (Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5)

  • 설운호;배병훈;박종서;신재철;이근일
    • 한국BIM학회 논문집
    • /
    • 제4권4호
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

기업활용수준을 반영한 기술경영 연구방법론 교과도출을 위한 사전연구 (A Preliminary Study for Deriving Subjects of MOT Method Based on the Utilization Status in Korea Enterprises)

  • 이재하;나원식
    • 산업경영시스템학회지
    • /
    • 제35권2호
    • /
    • pp.212-219
    • /
    • 2012
  • This study focus on what methods of MOT are needed and utilized to solve a technical problem in the MOT leading company. We first classified the MOT methods by project life cycle and R&D job quality based on the several discussion with working group. In order to study, the survey was carried out by 168 experts working on MOT practices. Our main research findings are as follows. The level of utilized MOT methods was above average because MOT sector was beginning to represent an increasing share of total R&D business. But the satisfaction level on the MOT majors was below average. The more utilized MOT methods in practices were 'environment analysis and opportunity research,' 'business feasibility,' 'roadmapping,' 'portfolio,' 'technology tree,' 'scheduling,' 'risk management,' 'six sigma,' 'design of experiment,' 'quality control,' 'cost analysis' etc. And the subjects of product realization process were also needed to MOT practice such as 'design for reliability,' 'design for cost,' 'design for performance,' 'design for safety' deeply involved to product quality. Finally, the capability requested to University students were 'problem define and solving,' 'technology planning and strategy,' 'creative thinking.'

Content-based Configuration Management System for Software Research and Development Document Artifacts

  • Baek, Dusan;Lee, Byungjeong;Lee, Jung-Won
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제10권3호
    • /
    • pp.1404-1415
    • /
    • 2016
  • Because of the properties of software such as invisibility, complexity, and changeability, software configuration management (SCM) for software artifacts generated during software life-cycle has been used for guarantee of the quality of the software. However, the existing SCM system has only focused on code artifacts and software development document artifacts such as Software Requirements Specification (SRS), Software Design Description (SDD), and Software Test Description (STD). Moreover, software research-oriented project comes out late the code artifacts and the software development document artifacts. Therefore, there is a need for trace and management of software research document artifacts composed of highly abstracted non-functional requirements like 'the purpose of the project', 'the objectives', and 'the progress' before generation of the code artifacts and the software development document artifacts for a long time. Nevertheless, the existing SCM system cannot trace and manage them. In this paper, we propose content-based configuration management system comprised of the relevance link generation phase and content-based testing phase to trace and manage them. The preliminary application results show applicability and feasibility of the proposed system.

건설CALS의 정보화수준 조사 분석 (Analysis of Informatization Level for Construction CALS)

  • 정인수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.285-290
    • /
    • 2008
  • 국토해양부에서는 건설산업의 정보화 수준을 향상시키고 건설 생산체계를 효율화시키기 위해서 건설 CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS사업은 1998년부터 시작되었지만 건설CALS의 정보화수준은 어느 정도인지에 대한 측정이 없었다. 본 연구에서는 선행연구에서 도출된 평가지표를 사용하여 건설CALS의 정보화수준을 측정하였다. 연구는 설문항 및 표본 구성, 설문조사, 설문조사 결과 분석의 절차로 진행하였다. 설문조사 결과, 빠른 시스템 장애복구, 시스템의 웹환경 구축, 높은 표준분류체계 활용, 체계적인 정보전략 계획 수립 측면에서 우수한 것으로 판단된다. 본 연구에서 제시하는 결과는 건설CALS의 정보화수준을 정확히 파악하는데 기여할 것이라 생각된다.

  • PDF

차세대 고속전철 시스템 시험검증 체계 구축 및 적용

  • 최종민;유일상;김연태;박영원
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.1079-1084
    • /
    • 2002
  • Systems engineering technology development program for Korea next-generation high-speed railway(KNHR) system in progress is a national large-scale system development program that is not only a large-size and complex but also multi-disciplinary in nature. Using the RDD-IOO, a systems engineering tool, the KNHR program can establish requirements traceability and development process management in the course of development. This paper presents the results from a computer-aided systems engineering application to KNHR system technology development project over the three years of activities. The traceability among the system design database in the vertical direction of SE process, as the results of the first year and the second year research was accomplished. The database in both the requirement management domain and the project management domain was developed and set up the traceability between them in the horizontal direction of the SE process in the V model as the results of the third year research. Therefore, KNHR design database was built to support the life-cycle management of the system as well as to reuse the knowledge in future programs. In the following development phase, this database will be utilized to accomplish the test and integration activities providing a baseline database. The outcome of the study contributes to the establishment of the model-based systems engineering approach as a best practice in the accumulation and advancement of systems engineering technology for railway system development.

  • PDF

COTS 시스템 기반 속성 및 행위 분석에 의한 생명주기에 관한 연구 (A Study of Analysis of Attribute and Operation based on COTS System)

  • 이은서;김중수
    • 정보처리학회논문지D
    • /
    • 제17D권6호
    • /
    • pp.443-452
    • /
    • 2010
  • COTS(Commercial Off The Shelf) 시스템은 점점 더 재사용 개발에 있어서 중요한 일중의 하나로 되어가고 있다. 그것은 개발될 소프트웨어 품질 혹은 프로젝트 일정에 영향을 미칠 수 있는 COTS의 신뢰성을 포함한다. COTS 분석의 결과가 생길 수 있는 위험의 결과와 함께 프로젝트에 문서화되어야 한다. 효율적인 위험관리는 문제에 쉽게 대처할 수 있게 해주며, 그것이 수용할 수 없는 예산이나 일정 지연이 되지 않도록 해준다. 본 연구에서는 COTS 개발 시, 프로세스 이정표와 노력에 관한 위험요소 분석에 대한 기준을 제시한다.

Diagrammatic Formalism for Complex Systems: More than One Way to Eventize a Railcar System

  • Al-Fedaghi, Sabah
    • International Journal of Computer Science & Network Security
    • /
    • 제21권2호
    • /
    • pp.130-141
    • /
    • 2021
  • This paper is in the intersection of software engineering and system engineering, two intimately intertwined disciplines. A dominating theme in this paper is the integral conceptualization of systems at large, as well as an underlying concern with software systems. In the software development life cycle, challenges still exist in translating requirements into a design artifact and then into an implementation (e.g., coding), then validating the results. From our perspective, software engineering requires an integrating paradigm toward a unified modeling orientation. Many methodologies, languages, and tools exist for facilitating system development processes. This paper is a venture into project development. To focus the materials, we concentrate on Harel's novel (and classic) development environment, which integrates a scenario-based engineering object orientation and statecharts through developing a railcar system. The railcar system is used as a detailed sample of translating requirements into a design artifact and then into an implementation, then validating the result. The project is re-cased as a single integrated modeling endeavor to be contrasted with the scenario and statecharts' development. The result of this scheme is an enriched understanding through experimenting with and contrasting various development methods of software projects.

Aspects Of Architectural Design Using BIM Technologies

  • Tikhonova, Oleksandra;Selikhova, Yana;Donenko, Vasyl;Kulik, Mykhailo;Frolov, Denys;Iasechko, Maksym
    • International Journal of Computer Science & Network Security
    • /
    • 제22권1호
    • /
    • pp.85-92
    • /
    • 2022
  • In this article, we look at the application of BIM (Building Information Modeling) in sustainable infrastructures. In response to global warming, energy shortages, and environmental degradation, people are trying to build eco-friendly, low-carbon cities and promote eco-friendly homes. A "green" building is the entire life cycle of a building that includes maximizing the conservation of resources (energy, water, land, and materials), protecting the environment, reducing pollution, providing people with healthy, comfortable, and efficient use of space, and establishing harmony between nature and architecture. In the field of ecological and sustainable buildings, BIM modeling can be integrated into buildings with analog energy, air flow analysis, and solar building ecosystems. Using BIM technologies, you can reduce the amount of waste and improve the quality of construction. These technologies create "visualization" of digital building models through multidimensional digital design solutions that provide" modeling and analysis "of Scientific Collaboration Platforms for designers, architects, utility engineers, developers, and even end users. Moreover, BIM helps them use three-dimensional digital models in project design and construction and operational management.