• Title/Summary/Keyword: Project Life-cycle

Search Result 480, Processing Time 0.028 seconds

CALS/EC Development Process Standardization Progress Direction (CALS/EC 개발 프로세스 표준화 발전방향)

  • 최헌준;이윤희
    • Proceedings of the CALSEC Conference
    • /
    • 1998.10a
    • /
    • pp.149-161
    • /
    • 1998
  • For the purpose of developing CALS/EC, it was surveyed ISO/IEC 12207 that was international standard and IEEE/EIA 12207 that was national standard in U.S.A and then peformed analysis comparing with MIL-STD-498 it was called origin of DoD software development process. Also it was surveyed software life cycle Process using doemstic defense area now Software life cycle process based on MIL-STD-498 in defense area was not yet includ the concept of new development philosophy like iterative development and process management according to the characteristics of project. For the purpose of improving software life cycle in defense area, first refined the process. And then on this study it was recommended accomodation of incremental and evolutionary development approach and the method of tailoring based on MIL-STD-498 was able to select and apply the process on the characteristics of project.

  • PDF

An Improvement Scheme of Process Quality in The Korean Building Projects (건축프로젝트에 있어서 프로세스 질 관리의 개선에 관한연구)

  • Lee, Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.6 no.3 s.21
    • /
    • pp.51-57
    • /
    • 2006
  • The object of this study is to examine the managerial characteristics of the Korean building projects. The study in this paperproposes to investigate the factors that affect process quality not only in the construction phase but also in all three phases (design, construction, and operation) of the whole life cycle of a building project. A questionnaire survey is conducted to investigate the differences in the perceptions of graduate students, professors, designers and practitioners with regard to process quality in building projects. Analyzing these factors helps in revising and improving the Korean existing quality control system and programs. The findings indicate that cooperation of designer's professionals, level of management leadership in promoting quality, ability to operate the facility within design limits are important factors. Theparticipation percentage of "quality" treated in any course/seminar shows only 45%. It is recommended that college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs rover quality training.

  • PDF

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A study on the Systems Engineering Management Plan for the High-speed Electric Multiple Unit 400km/h eXperiment (차세대 고속열차를 위한 시스템엔지니어링 관리계획 개발)

  • Lee, Tae-Hyung;Park, Choon-Soo;Kim, Ki-Hwan;Han, Young-Jae;Choi, Sung-Hoon;Kim, Sang-Soo;Han, In-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2008.04c
    • /
    • pp.187-189
    • /
    • 2008
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h experiment) project starts last fear. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF

Introduction to SE Process Application on the development project of the Korean High-speed Train(HSR 350-x) (한국형 고속열차(HSR 350-x) 개발사업의 시스템엔지니어링 프로세스 적용사례 소개)

  • Park, Choonsoo;Lee, Tae Hyung;Choi, Sunghoon;Kim, Kihwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.15-26
    • /
    • 2008
  • The Korean High-speed train was developed during 1996 to 2007. This development project consists of many sub-projects and the train-system includes a lot of sub-systems. In order to promote the project on planned cost and time effectively, we tried to apply systems engineering process during the whole life-cycle. The purpose of this paper is to introduce the systems engineering process applied to this project. Activities carried out in each phase such as pre-design, detailed-design, integration & verification are described.

  • PDF

전자부품산업에서의 출연연구소와 기업간의 기술이전 성패요인 분석

  • 박원석;용세중
    • Journal of Technology Innovation
    • /
    • v.8 no.2
    • /
    • pp.119-143
    • /
    • 2000
  • The main objective of this study is to test hypotheses by empirical study on the technology transfer from a national institute to small and medium sized enterprises(SMEs) in the Korean electronic devices industry. The important findings of the study are as follows: First, the success of the technology transfer from national institute to SMEs depends on the character of the project manager such as research experience and academic degree level. Second, the success of the technology transfer is related to the nature of the research project, especially to the technology life cycle stage but insignificantly to the amount of R&D fund and duration. Third, another success factor for technology transfer is the joint technology development between institute and SMEs, which is due to the possibility of early commercialization of the technology development project. Fourth, the hypothesis about the relationship between the project selection and evaluation results and technology transfer success is not statistically supported.

  • PDF