• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.028초

국가철도연구개발프로젝트의 효과적인 수행을 위한 생명주기모델 개발에 관한 연구 (A study on the Life Cycle Model to effectively conduct the National Railway R&D Project)

  • 최요철;이재천
    • 시스템엔지니어링학술지
    • /
    • 제4권1호
    • /
    • pp.11-18
    • /
    • 2008
  • As a government agency or the Government-donated Research Institute or industrial research institute is intended to develop a product or to construct a system such as a railway safety systems by research and development process, a life cycle model leading a product development or a research and development is essential to them to systematically and effectively progress it. In this paper, the refined life cycle model to effectively conduct the national railway safety project consists of the life cycle phases and their detail descriptions with reference to other life cycle model in the international standard and the other national guidance and other industrial domain such as ship-building, weapon system, and aerospace areas, the proposed life cycle model in the paper considerably reflects the characteristics of the traditional research and development project in railway safety domain. A guidance of a life cycle model which based on lots of the life cycle model in other domains proposes additionally.

  • PDF

Life cycle Health Promotion Programs using Traditional Korean Medicine (HaPPs-TKM) and Activation Plan

  • Jo, Jae Kyung;Park, Sunju
    • 대한예방한의학회지
    • /
    • 제24권3호
    • /
    • pp.57-67
    • /
    • 2020
  • Background : The Life cycle Health Promotion Programs using Traditional Korean Medicine (the Life cycle HaPPs-TKM) are the on-going 3rd stage projects that have centered on the development and dissemination of the standard life cycle HaPPs-TKM in the local community. The purpose of the study was to introduce the development background of the standard life cycle HaPPs-TKM and to suggest its activation plan. Methods : Academic and government research reports on the life cycle HaPPs-TKM were analyzed to introduce the development process, development backgrounds and the details of KM-HPP for each life cycle, such as infants and toddlers, adolescents, pregnant women, adults and the elderly. Results : We reviewed the development process of the standard life cycle HaPP-TKM consisted of a series of diagnosis on community members' health problems, establishment of project purpose, research on the involvement of KM intervention in a project, and final development of the project model. And we rediscovered that in the development backgrounds of KM-HPP, there were beneficial goals to manage and promote public health conditions for each life cycle. Conclusion : To activate life cycle HaPPs-TKM, we would recommend that activation plan should include six factors through systematic analysis of research reports. These factors consist of diversified goals for each life-cycle, competency reinforcement of local project manager, diversified Korean Medicinal modalities to enhance Sasang Constitution and Qigong, development of standard Outcome Index, periodical holding of performance contest, and improved guidance of government and associated entities through whole process of HaPP-TKM.

R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로 (A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management)

  • 원종호;최성용;김희경;박소현
    • 한국IT서비스학회지
    • /
    • 제22권3호
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • 제8권1호
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

CPLM 구축을 위한 프로세스 모델 구축 (Process Model for Construction Project Life-cycle Management System)

  • 송제홍;윤수원;신태홍;진상윤;최철호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.277-282
    • /
    • 2007
  • 건설 산업은 각 단계별 업무 프로세스의 분절 및 프로젝트 관리를 위한 다양한 소프트웨어 등이 업무 단위별로 상이함에 따라 단계별로 생성되는 다양한 데이터의 누락이 발생하며, 효과적인 공유 및 이를 활용한 신속한 의사결정 등에 한계를 보이고 있다. 또한 이로 인한 잦은 설계 변경 등의 문제가 발생하고 있다. 이 같은 문제점을 해결하기 위하여 프로젝트에 참여하는 다양한 주체들 간의 협업 및 원활한 정보 공유의 중요성이 대두되고 있다. 따라서 본 연구는 이와 같은 문제를 해결하귀 위하여 BIM(Building Information Mode1ing)으로 지칭되는 3D 기반의 정보 체계와 동시 공학(CE, Concurrent Engineering) 개념을 바탕으로 제조업 등에서 활발히 사용되고 있는 PLM(Product Life cycle Management) 시스템을 건설 산업 특성에 적합한 형태로 벤치마킹하여, 건설 프로젝트 통합의사결정 지원 체계(Construction Project Life-cycle Management) 구축을 위한 CPLM의 프로세스 모델 및 시나리오를 제시하고자 한다.

  • PDF

댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구 (The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis)

  • 윤재호;문영일
    • 한국수자원학회논문집
    • /
    • 제36권5호
    • /
    • pp.715-724
    • /
    • 2003
  • 이 연구의 목적은 사회간접자본의 대표적인 시설인 댐과 같이 기획, 조사, 타당성분석 단계에서부터 설계, 계약, 시공 및 유지관리단계까지 건설 생애주기가 긴 경우 Risk에 노출되는 시간 또한 길어져 건설기간 지연에 따른 비용증가는 물론 적기 미 준공시의 증액비용과 이용연기에 따른 편익손실로 국가 전체의 경쟁력을 저하시킴으로 이들 문제점을 감소시키는 방법을 모색하는 것이다. 이에 본 연구에서는 생애주기 각 단계별로 경제성분석을 통한 공기와 비용을 연계 분석하여 효율적이고 체계적인 사업수행단계 및 건설공정 Network모델을 도출하고 이 성과를 토대로 생애주기분석에 있어 Fast Track기법을 적용하는 하나의 새로운 방안으로 제안하고자 한다.

Quantifying Values from BIM-projects life cycle with cloud-based computing

  • Choi, Michelle Mang Syn;Kim, Inhan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.271-275
    • /
    • 2015
  • A variety of evaluation application and initiatives on the adoption of Building Information Modelling (BIM) have been introduced in recent years. Most of which however, focused mainly on evaluating design to construction phase-processes, or BIM utilization performances. Through studying existing publications, it is found that continuous utilization of BIM data throughout the building's life cycle is comparatively less explored or documented. Therefore, this study looks at improving this incomplete life cycle condition with the concept that accumulated BIM data should be carried forward and statistically quantified for cross comparison, in order to facilitate practitioners to better improve the projects the future. Based on this conceptual theory of moving towards a closedloop BIM building life cycle, this study explores, through existing literature, the use of cloud based computing as the means to quantify and adaptively utilize BIM data. Categorization of BIM data relations in adaptive utilization of BIM data is then suggested as a initial step for enhancing cross comparison of BIM data in a cloud environment.

  • PDF

건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로- (Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-)

  • 김현승;문현석;최광열;김창학;강인석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.11-24
    • /
    • 2012
  • 최근 공공사업 발주조건에 BIM(Building Information Modeling)이 의무화되고 있고, 실무 도입을 통한 성공 사례가 증가되면서 건설 분야의 BIM 도입이 본격화되고 있다. 그러나 기존의 BIM 관련 연구는 대부분 설계 또는 시공단계에 한정되어 수행됨에 따라 건설프로젝트의 생애주기를 고려하지 못하고 있고, 특정 업무지원 기능 위주로 진행되고 있다. 따라서 본 연구에서는 건설공사 프로젝트의 기획부터 유지관리단계의 생애주기 동안 단계별 BIM 적용이 가능한 통합 BIM 운영 프로세스를 제안하고 이를 토대로 통합 BIM 시스템을 개발한다. 이를 위해 교량공사를 대상으로 수행단계별 정보체계를 분석하여 BIM 활용 기능과 적용 프로세스를 제시하였으며, 이에 근거하여 수행단계별 BIM 운영 시스템을 구축하였다. 연구에서는 개발된 시스템의 실무 적합성 검증을 위해서 사례적용과 건설 실무자의 활용성 설문 조사를 수행하였다. 이러한 BIM 통합 운영체계는 생애주기를 고려한 건설공사의 3차원 기반 통합정보관리체계로 활용성이 기대된다.