• 제목/요약/키워드: Project Life Cycle Cost

검색결과 172건 처리시간 0.022초

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안 (Problems and Solutions of LCC Analysis in BTL Project for Education Facilities)

  • 김청융;홍태훈;현창택;이현종
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.182-192
    • /
    • 2008
  • BTL 사업은 공공시설물에서 민간의 자본과 기술력을 통해 높은 성과를 낼 것으로 기대되고 있지만, VE의 최적 설계안을 선정하고 건물의 유지관리 비용 예측에 사용되는 LCC 분석은 다수의 복잡한 문제점을 가지고 있어 제한적으로 적용되고 있다. 본 연구의 목적은 국내의 BTL 사업에서 LCC 분석의 문제점을 분석하고 그 해결방안을 제안하는 것이다. 이를 위해 BTL 사업에서 주요 사업대상인 교육시설을 중심으로 LCC 분석을 두 가지 수준(대안선정 LCC와 건축 LCC)으로 구분하고, 이들의 주요 특징을 고찰하였다. 그리고 6가지 측면(비용분류체계, 수선정보, 생애주기, 비용의 시간적 가치, 수선정보 데이터베이스, LCC 분석모델)에서 사례연구를 통해 4가지 주요 문제점과 해결방안을 도출하였다. 이 연구의 결과는 민간과 공공분야 참여주체들의 중장기적인 계획과 실행에 의해 해결될 수 있을 것이다.

VE 적용에 의한 지하 골조공사 개선연구 (Case Study on the Improvement of Underground Building Works through the VE)

  • 홍재욱;김선국;이종국
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.106-113
    • /
    • 2004
  • 건설산업의 고부가가치화를 위해서는 계획적인 원가절감에 의한 방법과 기능의 향상에 의한 방법 및 효율적인 추가 원가투입에 의하여 더 높은 기능 향상을 실현함으로써 부가가치를 높이는 방법을 추구하여야 할 것이다. 특히 건축공사에서 골조공사는 전체 공정 및 원가에 영향을 크게 미치는 주요 공정으로서 철저한 공사관리 계획과 관리가 요구되는 부분으로서 생산 활동 및 공사 방식 선정의 효과를 크게 볼 수 있는 항목이라 할 수 있다. 본 연구는 현재 도심지 공사에서 날로 증가하고 있는 지하공사의 비율을 감안하여 지하골조 공사의 성능개선에 초점을 두었다. 건축물의 지하골조공사에 있어 효과적인 공기 및 원가절감을 위하여 VE 기법을 검토하여 VE 프로세스와 분석차원을 모델링하고, 이를 현장에 적용, 사례연구를 통하여 그 타당성을 입증하였다. 따라서 본 연구는 건축물 지하골조공사의 VE 활용모델로서 기술대안 선정방식 수립의 기초적인 연구가 될 것으로 기대된다.

최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구 (A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology)

  • 조창연;손재호;김재온
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.45-57
    • /
    • 2009
  • 교육시설물 BTL 사업은 여러 개의 시설물을 1개의 번들로 계약하며, 계약기간을 20년으로 산정하여 그 비용을 지급한다. 따라서 BTL 프로젝트 초기단계에 운영관리비를 예측하는 정확도와 발주번들에 포함되는 시설물을 어떻게 편성하느냐에 따라 비용편차가 크게 발생하게 된다. 본 연구에서는 교육시설물 BTL 사업 발주 시 운영관리 최적 번들을 구성하기 위한 방법으로 컴플리트 링키지 알고리즘을 이용하는 비용 예측 시스템을 개발하고, 이를 통해 발주번들에 포함되는 시설물 변화에 따라 제한조건들이 변화하는 경우에 대해 사용자의 의사결정 시 판단근거자료로 활용 가능하게 하고자 한다. 본 연구에서 제안하는 시스템을 활용하면 보다 효율적이고 신속한 BTL 프로젝트의 운영비 예측이 가능할 것으로 사료된다.

기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석 (An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals)

  • 정성영;김선혜
    • 한국건설관리학회논문집
    • /
    • 제19권5호
    • /
    • pp.3-9
    • /
    • 2018
  • 기술제안입찰의 주 평가요소 중 하나인 생애주기비용의 적정성은 평가의 전문성을 요하지만 평가에 필요한 시간이 절대적으로 부족하여 경험많은 평가자라 할지라도 단순한 수치 비교에 의한 상대평가에 그치는 경향이 많았다. 이에 본 연구에서는 기술제안입찰로 낙찰자를 선정한 실 사례와 기술제안서를 비교하고 110건의 기술제안입찰 제안서를 비교하여 생애주기비용 중 가장 변동 폭이 큰 유지관리 및 에너지 비용의 불확실성을 분석하였다. 또한 절감된 공사비 대비 유지관리 및 에너지 비용의 절감수준을 정규화하기 위하여 VE지수를 제시하였다. 프로젝트별로 상이한 수선 및 교체 주기, 수선과 교체의 중복, 비수선 항목, 그리고 기타 에너지비 등의 중복 적용이 VE지수의 불확실성을 가장 확대시키는 요인으로 분석되었으며, 이러한 요인의 중복을 제거한 유지관리 및 에너지 비용 산출법을 표본 기술제안 사업 35건에 적용하여 평균 1.38, 표준편차는 1.19를 가지는 VE지수 모집단을 도출하였다. 기술제안 입찰의 평가자는 다수의 제안안 중 가장 합리적으로 산출된 VE지수를 추정하기 위해, 특정 VE지수를 본 연구가 제안하는 모집단 분포에 비교하여 그 확률을 계산하는 결정론적 해석 방법 또는 불확실성을 고려한 확률론적 해석 방법을 사용할 수 있다.

ECONOMIC ASSESSMENT OF THE SOLAR-ENERGY SYSTEM USING LIFE CYCLE COST ANALYSIS

  • Chang-Yoon Ji;Dong-Won Jang;Taehoon Hong;Chang-Taek Hyun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.669-675
    • /
    • 2009
  • As the use of new and renewable energy is one of the ways by which the exhaustion of fossil fuels and the other existing environmental problems can be addressed, a policy of spreading information regarding it and of conducting R&D related to it is currently being implemented in advanced countries. In the construction field, the concept of "green building" was born, and the application of this concept has increased, with the end in view of achieving energy savings, resource savings, and recycling, and of conserving the natural environment. In this context, the government of Korea amended the "Law on the Development, Use, and Promotion of New and Recycled Energy" in 2004, which contains 11 provisions related to new and renewable energy and their sources, including solar and geothermal energy as well as sunlight, water, rainfall, and organisms. Since solar-energy should be used instead of fossil fuels by converting sunlight directly into electricity, many researches on this subject are in progress. There are few researches, however, employing the economic approach to the subject. Thus, in this study, an economic assessment of the solar-energy system was conducted using both life cycle cost (LCC) analysis and sensitivity analysis. The results of the LCC analysis show that the solar-energy system will become economically better than the fossil fuel system after 16 years, although the initial construction cost of the solar-energy system is higher than that of the fossil fuel system. The results of this study are expected to be used in selecting an eco-friendly and economical solar-energy system when the construction of a green building is planned.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

공동주택의 시간의존적 설계VE 및 LCC분석 모델 (A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings)

  • 서광준;최미라;신남수
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.133-141
    • /
    • 2005
  • 최근에 공동주택 건설사업을 위한 가치공학 및 생애주기비용(LCC)분석의 중요성이 대두됨에 따라, 대형 건축물의 건설사업에서 가치공학 및 생애주기분석을 위한 이론적 모델, 표준지침 및 소프트웨어 등이 개발되어지고 있다. 그러나 현재까지도 실질적인 과거 보수이력데이터의 부재로 인한 VE 및 LCC분석 결과에 대한 신뢰수준이 미흡하다. 본 연구에서는 공동주택의 건설사업에 대한 합리적인 투자의사결정과 설계대안선정을 위한 시간의존적 LCC분석에 의한 가치분석 방법론을 제시하였다. 제안된 방법론은 과거이력데이터의 불확실성과 분석대안의 가치분석을 보다 합리적으로 고려하기 위한 시간의존적 생애주기비용 모델과 퍼지로직에 의한 성능평가기법과의 상관관계를 규명하였다. 또한, 제시된 시간의존적 생애주기비용 모델과 가치분석 절차의 타당성을 검토하기 위하여 실제대상사업에 적용하였다. 본 연구에서 제안된 방법론은 공동주택 건설사업에서의 설계대안 선정, 생애주기 비용 평가 및 합리적인 예산의 분배 등에 크게 기여할 것으로 기대된다.

공공건축물의 초기공사비 산정방법 연구 (Cost Estimating method for the Public Office building at the early stage)

  • 구원용;김정곤;이준석;박형근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.261-266
    • /
    • 2007
  • 이 연구는 프로젝트 기획단계에서 발주자가 실적자료를 활용해 공공건축물인 관공서의 총공사비를 견적하는 방법에 대한 것이다. 최근 공공건축물의 종류 및 용도가 다양화 되면서, 공사비 산정 시 고려해야할 요소가 증가하여 공사비 추정에 대한 논리적인 분석이 어려운 경우가 많다. 이로 인해 경우에 따라서는 건축물이 과다 또는 부실하게 계획되는 사례가 발생하고 있어 예산이 낭비되기 쉽다. 특히, 학교, 관공서, 체육시설 등의 공공건축공사에 BTL(Build Transfer Lease)방식이 도입되어 활성화되면서 건축물의 기획 단계부터 적정규모 산정 및 공사비에 대한 체계적 예측 및 관리가 필요하며, 효과적인 건축물의 기획을 위해서는 장기적인 건축물의 이용자 및 건축물의 수명주기(Life cycle)를 예측한후 건축물의 규모를 산정하는 것이 바람직하다. 그러나 현실적으로 모든 변수들을 종합한 결과를 토대로 건축물을 기획하는 것은 용이한 일이 아니다. 따라서 본 연구에서는 발주자가 건축물의 기획 단계에서 공공건축물의 예산 수립을 쉽게 검토할 수 있는 방법론을 제공하고, 과거에 수행된 유사한 용도의 건축물 실적자료를 활용해, 총공사비를 견적할 수 있는 회귀분석모델을 제안하고 모델의 적용성검토를 위해 일본의 관공서 건축데이터를 통해서 검증하였다.

  • PDF

한국형 고속열차(HSR 350-x) 개발사업의 시스템엔지니어링 프로세스 적용사례 소개 (Introduction to SE Process Application on the development project of the Korean High-speed Train(HSR 350-x))

  • 박춘수;이태형;최성훈;김기환
    • 시스템엔지니어링학술지
    • /
    • 제4권2호
    • /
    • pp.15-26
    • /
    • 2008
  • The Korean High-speed train was developed during 1996 to 2007. This development project consists of many sub-projects and the train-system includes a lot of sub-systems. In order to promote the project on planned cost and time effectively, we tried to apply systems engineering process during the whole life-cycle. The purpose of this paper is to introduce the systems engineering process applied to this project. Activities carried out in each phase such as pre-design, detailed-design, integration & verification are described.

  • PDF