• Title/Summary/Keyword: Project Level

Search Result 2,339, Processing Time 0.028 seconds

A Study on Factors for Influence SW Development Productivity on The IT Service Company (IT Service기업의 Software개발 생산성 영향 요인에 관한 실증 연구 : SW개발 방법론 중심으로)

  • Song, Young-Woon;Kim, Wanki
    • Journal of Information Technology Services
    • /
    • v.13 no.2
    • /
    • pp.195-217
    • /
    • 2014
  • This paper has explored when implementing SW development project of the IT service corporations, what factors affect its productivity in SW development methodology. The importance of the AHP analysis surveyed from the experts in IT service companies and related committee, was shown in the order of the following processes : 1) Deployment process 2) Management process 3) Establishment process. It is measured the methodology levels of establishment, deployment and management in each project using the survey results collected from project execution members and analyzed the productivity of projects that have been executed within 2 years. Using project methodology level, productivity correlation analysis, and regression analysis, this study confirms that the methodology deployment level brings positive effects significantly to SW development productivity. The significance of this study would be not only to research and analyze SW development productivity using the real project execution data but also to underline the necessities and the importance of steady research, deployment and support for SW development productivity improvement.

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

A Research about Importance and Satisfaction in Each Tasks on Apartment Remodeling (공동주택 리모델링 사업의 업무별 중요도 및 만족도 조사)

  • Oh, Chi-Seob;Choi, yun-ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.6
    • /
    • pp.35-43
    • /
    • 2018
  • As rapid increasing of domestic apartments, decline of the market value of the old apartment and to be announced policy by government are re-lighting to be insufficient growth than the past 15 years in market of apartment remodeling. In this study, research the conflicts on apartment remodeling project and analysis of importance and satisfaction by survey. Also, the survey was being progressed for every participant who are related in an apartment remodeling project. After this study, this study will propose basic data for effective way to improve on apartment remodeling project. For this purpose, generalize the project stage level by level. And analysis status of business progress to be felt from participants of project. According to the results by a survey, the each result of elements can be a reference value for a good way of apartment remodeling to proceed and improve.

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF

Improving Qualification of Safety Manager at Construction Site (건설현장 안전관리자의 자격기준에 관한 연구)

  • Gal, Won-Mo;Son, Ki-Sang;Jeong, Se-Gyun;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Models of Technological Innovation at a Project And a Firm Level (기업에 있어서 기술혁신의 동태적 모형)

  • 이진주
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.3 no.1
    • /
    • pp.57-67
    • /
    • 1978
  • This paper reviews various models of technological innovations at different levels: project level and productive segment level. Firstly, it examines a number of significant factors influencing the success and failure of technological innovation at project level. Specifically, the role and characteristics of technical information for the success of innovation is analyzed. Secondly, the paper discusses in detail the relationship between technological innovation and the evolution of a firm. Product and process innovations are analyzed in accordance with a three stage model; the stages are performance maximizing (uncoordinated), sales maximizing (segmental) and cost minimizing (systemic). Various implications of the model are presented in terms of the business policy variables such as diversification, standardization, productivity improvement, marketing, etc. The applicability of the model to a developing country is sought and a few suggestions to develop new model of technological innovations in LDC are discussed.

  • PDF

Comparison of SE-CMM and KEPIC QAP-1 for Assessing Capability Level of Nuclear QA (원자력 QA의 능력수준 평가를 위한 SE-CMM과 KEPIC QAP-1간의 비교)

  • Lee Sun Kee
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.4
    • /
    • pp.1-14
    • /
    • 2004
  • Nuclear project company establishes and maintains its QA system in the conformance with applicable Codes & Standards and contract provisions. Certifying agency(e.g., Korea Electric Association) or project owner appraises the effectiveness of the company QA system by surveying or auditing it. However, although the company fulfills the requirements of this survey/audit, the capability level of its nuclear QA system is not appraised numerically and developed in that KEPIC QAP-1, used by the company as a nuclear QA guidebook, does not describe an approach for managing the capability level of the QA system. This study evaluates the characteristics of QAP-1 from the viewpoint of SE-CMM(Capability Maturity Model for Systems Engineering) in order to suggest a possible solution.

An Empirical Study on the Contingent Management Model of IS Development Projects (정보시스템개발 프로젝트의 상황적 관리모형에 관한 실증적 연구)

  • Kim, Sang-Hoon
    • Journal of Information Technology Services
    • /
    • v.3 no.1
    • /
    • pp.43-61
    • /
    • 2004
  • Recently It becomes a rapidly growing concern to find effective ways of managing IS development projects as the projects increase in many organization. This paper focuses on developing an integrative management framework for IS development project in contingent perspective. The framework is based upon contingent relationship between management dimensions of IS development project and the characteristics of the task replaced or supported by an IS. Management dimensions of IS development consist of mode, content and process. Task characteristics which are considered as contingent variables include project size, unstructuredness level, hierarchical level, interdependence level and system innovativeness level. The data used for validating this conceptual framework are collected from 119 IS development projects in 70 Korean business organizations. One-way ANOVA and T-test are employed to test the hypotheses.

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.