• 제목/요약/키워드: Project Information Management

검색결과 2,597건 처리시간 0.028초

위키방식의 전문지식 협력이 프로젝트 구성원의 성과에 미치는 효과 (Wiki-Based Expert Knowledge Collaboration Effects on Performance of Project Members)

  • 김희영;강성배;이주헌
    • 한국IT서비스학회지
    • /
    • 제12권1호
    • /
    • pp.173-187
    • /
    • 2013
  • The advent of Web2.0 has believed to be the solution against many barriers in information sharing, especially wiki. Information sharing and collaboration are realized voluntarily and unselfishly with wiki. The purpose of this paper is to analyze the benefits and challenges of using wiki as a project management method in an IT/IS project. Wiki-based project management could provide project managers and members with expert knowledge collaboration for better project results. In the research model, we used TMS(Transactive Memory System) theory to define the relation of collaboration and performance of project members. Based on a survey among project members, the interactions between wiki characteristics and performance are examined in an IS project environment. Using Smart PLS 2.0, the data was analyzed to define the interactions by the structural equation modeling. From the empirical data, the mediated effect of expert knowledge collaboration is supported. We also derive the implications of wiki-based method. It is expected to bring new possibilities of Project management performance.

정보시스템 프로젝트의 성과영역별 위험요인에 관한 탐색적 연구 (Exploratory Study on Risk Factors by Project Performance Areas in Software Project Management)

  • 이석준;김혜정;서현석
    • Journal of Information Technology Applications and Management
    • /
    • 제11권4호
    • /
    • pp.103-120
    • /
    • 2004
  • Identifying validated risk factors in software risk management is imperative for project managers. Although validated risk lists were provided by previous researchers, risk list associated with software project performance areas was not provided as yet. This paper represents a first step toward understanding risk lists by various project performance areas (time, cost, and quality) to help project managers alleviating the possibility of software project failure. Four simultaneous exploratory surveys were conducted with 29 experienced software project managers. Three different risk factor ranking sets for each project performance area were compared with, the risk ranking, which was provided without clarifying specific project performance areas. The risk lists and their corresponding perceived importance were different from previous research results. This implies that identifying risk factors for specific project performance areas can provide additional information for project managers. We concluded by discussing implications of our finds for both research and improving risk management practice.

  • PDF

업무 효율 향상을 위한 사업관리정보시스템 (The Project Management Information System for the Work Efficiency Improvement)

  • 류지웅;송종철;문병주;정회경
    • 한국정보통신학회논문지
    • /
    • 제18권1호
    • /
    • pp.18-24
    • /
    • 2014
  • 프로젝트의 성공적 수행을 위해 단계별 체계적 관리를 제공하는 사업관리정보시스템은 필수적이다. 그러나, 기존 관리시스템은 사업을 통한 공모과제들의 접수, 선정, 수행관리 등에만 초점이 맞춰져 있었으며, 사업 자체에 대한 관리는 전무한 실정이다. 본 논문에서는 공모과제의 관리뿐만 아니라, 시행사업에 대한 총괄관리가 가능한 하향식 전주기적 사업관리의 시스템화를 통해 연구성과를 체계적으로 관리함으로써 사업관리 업무의 효율성을 제고할 수 있는 방안에 대해 기술한다. 또한, 사용자의 특성에 맞는 차별화된 정보를 제공할 수 있는 사업관리정보시스템 구축을 통해 고객 맞춤형 서비스를 제공하는 환경에 대해 기술한다. 이러한 사업관리정보시스템을 활용함으로써 표준화된 체계적 사업관리를 가능하게 하고, 시스템간 연계를 통한 즉각적인 후속 업무 진행으로 업무 효율성을 향상시킬 수 있음을 적용 사례를 통해 확인한다.

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

XML-based Information Model for Interactive Electronic Technical Manual for Urban Regeneration Project

  • Sunghoon Kang;Hyun-Soo Lee;Moonseo Park;Jin-Wook Jung
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.841-846
    • /
    • 2009
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.

  • PDF

현장(現場) 자율(自律) 품질안전관리(品質安全管理) 시스템 구축(構築) (The Establishing of the Self-regulation System for Quality and Safety Management)

  • 백인희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.81-87
    • /
    • 2007
  • PMIS (Project Management Information System) has been applied in the R4-PROJECT This construction project has been controlled and managed by PMIS for the whole process of project. Moreover, this PMIS is updated to the Self-regulation System for Quality and Safety Management which is integrated and developed from PMIS in R4-PROJECT. So, The Self-regulation System for Quality and Safety Management has been delivering effective communication and information distribution with various stakeholders related to project and also brought the achievement of efficient construction management. As the system is successfully utilize, the satisfaction of costumer request and the performance of no accident for 550 million hours could be attained.

  • PDF

소프트웨어 개발 프로젝트의 위험요인 도출에 대한 델파이 연구 (A Delphi Study on Software Project Risks)

  • 정경수;강명희;김용
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제13권1호
    • /
    • pp.1-20
    • /
    • 2004
  • Most of the software development projects bear risks that need analysis and management. Risk management plays a critical role for the success of software project management. In this study, we have used delphi method to delineate critical risk factors. The study pulls out 20 project risk factors from 21 project managers. It is certainly clear that certain features are more risky than others. Our study shows that unrealistic cost estimation and changes in scope and objective are more risky than other features.

  • PDF

소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델 (Maturity model considering the interrelation between software project management areas)

  • 전순천
    • 한국항행학회논문지
    • /
    • 제15권5호
    • /
    • pp.823-832
    • /
    • 2011
  • 최근 공공기관 및 금융권에서는 경쟁력 향상을 위한 정보시스템의 통합으로 프로젝트 규모가 대형화되고 있으며, 프로젝트 수도 날로 증가하고 있어 정보시스템 프로젝트 관리를 위한 적절한 방안이 필요하다. 프로젝트 관리, 성공요인 및 실패요인에 대한 연구는 많이 수행되었으나, 프로젝트 관리 영역 간에 미치는 영향에 대하여 체계적인 연구가 미흡하였다. 본 연구는 선행 연구와 발주자, 개발 PM과 정보시스템 구축 전문가들인 정보처리기술사를 대상으로 설문 및 인터뷰를 통하여 범위, 일정, 품질, 인력, 위험 프로젝트 관리영역으로 도출하였다. 그리고 도출된 각 관리영역들에 대하여 상호 미치는 영향도 및 관리영역간의 상대적인 중요도의 분석하였고, 관리영역의 진행 상태를 계획, 실행, 완료 단계로 구분하고, 각 진행단계의 수행상태를 평가하는 틀을 제시하였다.

대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구 (A Study on the Development of Project Management Information System for Mega Project)

  • 윤은상;이화기
    • 산업경영시스템학회지
    • /
    • 제22권50호
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

정보시스템 프로젝트의 위험요인에 관한 실증 연구 (An Empirical Study on Risk Factors in Information System Project Management)

  • 조숙진;이석준;함유근
    • Asia pacific journal of information systems
    • /
    • 제16권3호
    • /
    • pp.143-158
    • /
    • 2006
  • Identifying risk factors in software risk management is imperative for project managers. The purpose of this paper is to provide software project risk factors validated by statistical analysis, and thus to help project managers alleviating the possibility of software project failure. Factor analysis with data collected from 264 Korean project managers and consultants identified 12 categories and 46 risk factors. T-test results showed that project managers and participants had statistically different perception on 3 risk factors among those 46 risk factors. We concluded by discussing implications of our findings and future research directions.