• Title/Summary/Keyword: Project Failure

Search Result 409, Processing Time 0.024 seconds

Remarks on Education Method to Turn Failure Experience to Instructions for Engineering Design

  • Arimitsu, Yutaka;Yagi, Hidetsugu
    • Journal of Engineering Education Research
    • /
    • v.13 no.2
    • /
    • pp.74-77
    • /
    • 2010
  • This article proposes to examine how the study of failure differs from other technical subjects, and how to turn failure experiences to one's advantage. The authors surveyed the properties of failures in PBL (Project Based Learning) and also examined students' interest and understanding of failure, after introducing failure examples. To investigate how students communicate failure experiences to third parties, reports of the failure experience in PBL were evaluated. From above mentioned surveys, we get the following results. The typical causes of failure in educational institutions are lack of skill in manufacturing and inadequate planning, which conversely are minor causes of failure in the industry. A knowledge database on failure, employed commonly in industry, is not effective in PBL, because projects in educational institutes are usually changed every year. Case studies in failure can be approached from many points of view including causes, processes, effects and safety measures. While teachers should emphasize the notable points in the failure examples in introducing examples of specific topics in machine design, teachers should explain the multiple aspects in the failure examples to educate students about the complexity of actual accidents.

  • PDF

A Study on Project Management for Product Development using Quality Tools (품질도구를 활용한 제품개발 프로젝트관리)

  • Park, Young Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.4
    • /
    • pp.665-676
    • /
    • 2017
  • Purpose: The purpose of this paper proposes an effective and systematic methods of risk management in product development project. Methods: This paper first discusses what risk factors be considered during product development period and then presented a model for preventive risk management. For that, this paper proposes how to evaluate the risk factors and risk events, and how to select prevention action for managing risk factors effectively. For this process, this paper uses well-known quality tools such as House of Quality (HOQ) and Failure Mode and Effects Criticality Analysis (FMECA) methods. Results: There is an inherent need for the development of robust risk management framework in order for product development projects to be successful. The identification and quantification of risk factors, risk events, and prevention actions can have significant effects on the success of a product development projects. Project managers can implement the proposed model to improve project success. Conclusion: The findings showed that this method would be effective for project managements in dealing with risk management issues in product development projects. This method presented would be an one of good guidelines for practitioners in the industry.

An Integrated On-Line Diagnostic System for the NORS Process of Maiden Reactor Project: The Design Concept and Lessons Learned

  • Kim, Inn-Seock
    • Nuclear Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.261-273
    • /
    • 2000
  • During an extensive review made as part of the Integrated Diagnosis System project of the Maiden Reactor Project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS is an integrated on-line diagnosis system that encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used at the Maiden Man-Machine Laboratory HAMMLAB of the OECD Maiden Reactor Project. The performance of MOAS, developed in G2 real-time expert system shell for the high-pressure preheaters of the NORS process in the HAMMLAB, was tested against a variety of transient scenarios, including failures of the control valves and sensors, and tube leakage of the preheaters. These tests showed that MOAS successfully carried out its intended functions, i.e., quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed.

  • PDF

An Empirical Study on Managerial Factor for the New Product Development Using Failure Case (신제품 개발을 위한 관리요인에 관한 실증적 연구 - 실패제품을 중심으로 -)

  • 이재하
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.41
    • /
    • pp.113-122
    • /
    • 1997
  • The purpose of this study is to extract managerial factor into each cell which is classified by the characteristic area of new products. For this purpose, the characteristic area of new products is classified by which is Needs & Seeds Basis. The focus of this study is on examination of failure factors, which have an important effect upon new product failure. The variables for this study were selected from literature survey and pre-interview was implemented specially. The subject of study was project leaders of electronics industry where have taken the leading part in product development activities in Korean manufacturing industries. Enquete survey was conducted in each firm and project managers were asked to respond to 37 questions. Conclusion of this study based on many significant results gained by the various multi-variated analysis are summarized as follows. First, it can be noted that failure factors are different by each classified model and characteristic area of a new product. Second, it has been identified that the important factors for the new product development were technical & managerial support and it's ability, namely, the crucial factors of failure product were lacking in ability of technical development and R&D management system construction.

  • PDF

Analytic Model on the Success/Failure Structure of New Product Development by Product Characteristic Grill (제품속성별 신제품개발의 성패구조 분석모형)

  • Gwon Cheol Sin;Lee Jae Ha
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.205-211
    • /
    • 2002
  • The purpose of this paper is 1) to extract managerial factor into each cell which is classified by the characteristic grill of new products 2) to construct a management model of new product development for korean companies. For this purpose, the characteristic grill of new products is classified by which is market/technology sphere. Moreover the focus of this analysis is on examination of success/failure factors, which have an important effect upon new product success or failure. The variables for this study were selected from literature survey and pre-interview was implemented specially. The subject of study was project leaders of electronics industry where have taken the leading part in product development activities in Korean manufacturing industries. Enquete survey was conducted in each firm and project managers were asked to respond. Conclusion of this study based on many significant results gained by the various multi-variate analysis are summarized as follows. First, it can he noted that success/failure factors are different by each classified model and characteristic grill of a new product. Second, it has been identified that the important factors of success products were technical & management support and market ability, the important factor of failure product were lacking in ability of technical development and R&D management system construction. This paper presents some useful guidelines in strategic and managerial aspects for development of new products. Concurrently, the model of this study should be a great practical approach for application of actual affairs.

  • PDF

An Evolution of Software Reliability in a Large Scale Switching System: using the software

  • Lee, Jae-Ki;Nam, Sang-Sik;Kim, Chang-Bong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.4A
    • /
    • pp.399-414
    • /
    • 2004
  • In this paper, an evolution of software reliability engineering in a large-scale software project is summarized. The considered software consists of many components, called functional blocks in software of switching system. These functional blocks are served as the unit of coding and test, and the software is continuously updated by adding new functional blocks. We are mainly concerned with the analysis of the effects of these software components in software reliability and reliability evolution. We analyze the static characteristics of the software related to software reliability using collected failure data during system test. We also discussed a pattern which represents a local and global growth of the software reliability as version evolves. To find the pattern of system software, we apply the S-shaped model to a collection of failure data sets of each evolutionary version and the Goel-Okumoto(G-O) model to a grouped overall failure data set. We expect this pattern analysis will be helpful to plan and manage necessary human/resources fur a new similar software project which is developed under the same developing circumstances by estimating the total software failures with respect to its size and time.

An Empirical Analysis of the Valley of Death: Large-scale R&D Project Performance in a Japanese Diversified Company

  • Osawa Yoshitaka;Miyazaki Kumiko
    • Journal of Technology Innovation
    • /
    • v.14 no.2
    • /
    • pp.93-116
    • /
    • 2006
  • The purpose of this study is to contribute reference material that provides insight into innovative process management that increases R&D output in commercializing new products. A model of a process from research to commercialization with the cumulative profit and loss curve is put forward and hypotheses related to success and failure are developed at the stages up to product launch. Seventeen large projects that have resulted in successful product launches have been examined from the initial research stage to commercialization. Prefect duration, standardized cumulative R&D expenditures and research resource concentration are analyzed in terms of statistical method and patterns in cumulative profit and loss curves after product sales, as well as the reasons for and other aspects of success/failure are investigated and analyzed. Consequently, valuable information on future management tasks has been obtained such as: (1) project duration differs depending on market sectors, product types and presence/absence of materials research (2) cumulative profit and loss curves can be categorized into four patterns (3) reasons for failure can be divided into technological and market problem categories and (4) these factors have an impact on product sales.

  • PDF

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

A Study on the Disturbing Factors in University's Hospital Reengineering Project (한 대학병원 종사자들이 인지하는 병원경영혁신의 장애 요인)

  • Nam, Eun-Woo;Van, Myeong-Kyu
    • Korea Journal of Hospital Management
    • /
    • v.1 no.1
    • /
    • pp.136-153
    • /
    • 1996
  • The purpose of this study is to identify the factors hindering hospital reengineering project in one university hospital. The data was collected by the self-administered Questionnaire to 288 members of the hospital in Pusan on April 5-18, 1996. This study took some statistical methodologies, such as descriptive analysis, factor analysis and logit model analysis. The results were as follows; First, in the descriptive analysis for whether the hospital reengineering named RUSH94 was a success or not, the subjects judged that it was not successful and regarded their fable mutual communication as the main factor. Second, in the reason of failure at the reengineering project, the group who thought that the failure factor was the lack of mutual consensus checked the scores of the first factor produced from the factor analysis.

  • PDF

Factors Affecting Quality Management Failure in Construction Projects

  • Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.66-81
    • /
    • 2024
  • Identifying the root causes of substandard construction projects is crucial considering the social and economic issues structural failures can cause. To date, the focus has predominantly been on identifying and penalizing the culprits rather than uncovering the fundamental reasons. Therefore, this study aims to identify various factors that contribute to failures in construction project quality management, including aspects of substandard construction projects, and determine the relationship between these factors and substandard construction projects. Through a literature review and case analysis, 61 influential factors were identified. A survey targeting participants including structural designers, architectural designers, construction companies, CM, and researchers was conducted to gauge the consensus on these factors. A regression analysis was performed based on data from 724 survey respondents. Ultimately, based on the 17 key influencing factors identified by the regression analysis, 9 preventive measures against substandard construction projects were proposed. This study is significant as it elucidates the reasons behind construction project quality management failures that lead to substandard construction projects and establishes a framework for developing practical solutions to real-world problems rather than theoretical or abstract ones.