Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

CRITICAL SUCCESS FACTORS FOR PROJECT SUCCESS OF CONSTRUCTION PROJECTS BASED ON DIFFERENT PROJECT OBJECTIVES

  • Hamimah Adnan;Faridah Yusuf;Mohd Arphian Salleh
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.611-624
    • /
    • 2007
  • Every construction project expects a success. In order to attain success for every project involved, issues that are related to the success of a construction project must be identified. This paper identifies those key factors, which contribute to the success of construction projects. The main factors crucial to project success were identified from a literature review and through a questionnaire survey administered to local contractors. A follow-up interview was conducted to validate the first survey and to evaluate the perception of the local contractors. An Analytical Hierarchy Model was used to obtain the final Critical Success Factors. The identification of the critical factors related to the success of construction projects will contribute to the achievement of a particular objective which will accomplish the success of the project. Aspects that affect the success of the project are the project characteristic, contractual arrangement, parties involved in a construction project and finally, and the aspect of the project interactive processes.

  • PDF

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

PEFP CONTROL SYSTEM USING EPICS

  • Choi HyunMi;Hong In.Seok;Song YoungGi;Cho YongSub
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.656-658
    • /
    • 2005
  • KAERI (Korea Atomic Energy Research Institute) has been performing the project named PEFP (proton engineering frontier project). PEFP has been performing the project of a high power proton accelerator. Control system for 20 MeV proton accelerating structure has developed. We use the EPICS(Experimental Physics and Industrial Control System) tool kit as a foundation of the control system. EPICS is adopted for control systems which have OPI(OPerator Interface) and IOqlnput Output Controller). We have performed the PEPF control system on SUN workstation host computer. In this paper, we present the vacuum monitor, RFQ, and DTL Turbo pump control system.

  • PDF

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

Conflict Analysis in Construction Project with Unstructured Data: A Case Study of Jeju Naval Base Project in South Korea

  • Baek, Seungwon;Han, Seung Heon;Lee, Changjun;Jang, Woosik;Ock, Jong Ho
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.291-296
    • /
    • 2017
  • Infrastructure development as national project suffers from social conflict which is one of main risk to be managed. Social conflicts have a negative impact on not only the social integration but also the national economy as they require enormous social costs to be solved. Against this backdrop, this study analyzes social conflict using articles published by online news media based on web-crawling and natural language processing (NLP) techniques. As an illustrative case, the Jeju Naval Base (JNB) project which is one of representative conflict case in South Korea is analyzed. Total of 21,788 articles and representative keywords are identified annually. Additionally, comparative analysis is conducted between the extracted keywords and actual events occurred during the project. The authors explain actual events in the JNB project based on the extracted words by the year. This study contributes to analyze social conflict and to extract meaningful information from unstructured data.

  • PDF

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.