• 제목/요약/키워드: Project Difficulty

검색결과 254건 처리시간 0.025초

경제성공학의 한계에 관한 고찰 (A Study on Limiting Factor of Capital Assets Investment Calculation)

  • 김성집
    • 산업경영시스템학회지
    • /
    • 제2권2호
    • /
    • pp.5-10
    • /
    • 1979
  • For investment calculation of capital assets, it is desirable to grasp the limiting factors of its calculation. The limiting factors can be listed as follows; $\circled1$ difficulty in estimating the service life of capital assets. $\circled2$ difficulty in estimating the receipts, and operating and maintenance expenses of the project. $\circled3$ difficulty in determining common Minimum Attractive Rate of Return. $\circled4$ difficulty in estimating the salvage value of the assets. $\circled5$ some limiting factors on present worth calculation of the projects. $\circled6$ Some limiting factors on payout period method of the economic calculation.

  • PDF

프로젝트 관리 시스템에 관한 연구 (A Study on Project Management System)

  • 박구락
    • 디지털융복합연구
    • /
    • 제13권1호
    • /
    • pp.305-311
    • /
    • 2015
  • 현대에 들어 IT 시장은 대형화와 복합화가 진행되고 경쟁이 더 심화되고 있기 때문에 전통적인 사업관리 방식으로는 관리하기 어려운 정보시스템구축 사업이 많아지면서 이를 효율적으로 관리할 수 있는 제도적 장치와 이를 지원하는 사업관리 프로세스를 도출하기 위하여 실무자(현장PM 및 사업참여자)를 대상으로 설문조사를 실시하였다. 이를 통해 소프트웨어개발 사업관리 요소기술의 중요도와 취약도를 파악하여 개선해야 할 요소기술이 도출되었고, 이를 활용하여 사업관리의 필요성과 총괄사업관리자의 역할과 핵심 사업관리 분야를 결정하는데 논리적 근거를 제시하는 매우 유의미한 결과를 얻었다.

ERP 시스템 가격산정에 영향을 주는 변수에 관한 연구 (A Study of Factors Influencing the Price of ERP System in its Implementation)

  • 이재정
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제12권1호
    • /
    • pp.1-17
    • /
    • 2003
  • ERP is a topic of currency in MIS circle. Numerous organization have developed their information systems using many kinds of ERP packages such as Oracle, SAP R/3, uniERP, etc. However, the pricing methodology of ERP systems is not yet established in a proper way. This paper attempts to investigate factors influencing the price of ERP system. Thirty eight ERP consulting firms participated in this research project. Based on the data from ERP consulting firms, price of ERP systems basically consist of package cost, consulting fee, and customizing expense. The results of this research project are finding factors affecting above three parts that consist price of ERP system. This paper found that factors influencing package price are number of modules, number of users, the degree of package reliability. The factors affecting consulting fee are the degree of project specialty, level of consultants. Finally the factors influencing customizing cost are the degree of project difficulty, project time.

  • PDF

프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델 (Project Participants Cooperative Decision Making Model with QFD-based VE Technique)

  • 임철희;전재열;이종식
    • 한국건설관리학회논문집
    • /
    • 제20권4호
    • /
    • pp.3-12
    • /
    • 2019
  • VE 분석은 사용자의 다양한 요구사항을 명확히 정의하여 기능과 성능을 확보함은 물론 비용절감이 가능한 대안을 제안하여야 한다. 하지만 현행 국내 VE 프로젝트는 프로젝트 참여자간 효과적, 효율적 커뮤니케이션의 어려움과 제약된 시간으로 인해 VE 기능분석에 대한 명확한 정의가 어려운 실정이다. 이로 인해 주로 국내 VE의 결과는 기존 시설 기능을 유지하면서 비용절감을 수행하는 방향으로 포커스 되어 있다. 따라서 본 연구는 VE 수행의 본래 취지에 맞추어서 사용자에 적합한 최적의 기능을 확보함은 물론 비용절감이 가능하도록 프로젝트 VE 참여자의 집단적, 협력적 방식이 가능한 QFD-VE 모델을 제안한다. QFD-VE 기법은 첫째, 요구기능의 정의 및 수정, 요구기능의 중요도 설정에 대하여 집단의사결정 적용이 가능하며, 둘째 VE 대안에 대한 인접시스템의 간섭, 충돌 여부를 프로젝트 VE 참여자가 협력적으로 검토할 수 있는 기법이다. 본 연구는 향후 QFD-VE 기법을 이용한 전산시스템 구현을 위해 수학적 모델을 함께 제시하였다.

ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 1998년도 The 12th Asia Quality Management Symposium* Total Quality Management for Restoring Competitiveness
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

Assessing Critical Quality Metrics for Successful Baseline Construction Scheduling

  • Bivans, John;Choi, Jin Ouk
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1241-1241
    • /
    • 2022
  • In the current construction industry, difficulty arises in creating an adequate baseline schedule to establish a fundamental plan for construction. This presentation will present the research findings which investigated industry-recognized schedule metrics that aid in the successful implementation of said schedule. Industry organizations (Association for the Advancement of Cost Engineering, the Government Accountability Office, the Project Management Institute, and local city, state, and county government offices) provide standardized guidelines with specific metrics requirements to ensure successful implementation. However, most of those metrics are substantiated or validated in their effectiveness. The study examined the impact between these industry-recognized critical metrics and three distinct scheduling characteristics: Project Type, Project Duration, and Project Density (number of activities within a schedule). The research results showed that, among the 12 various schedules evaluated in parallel with 20 industry-recognized critical metrics, seven metrics substantially demonstrate a significant impact on a project schedule's success. Furthermore, six of the seven metrics directly correlate to at least one of the three scheduling characteristics outlined. As a result, this research has established more predictable outcomes based on impacts between three distinct project characteristics and 20 of the most discussed/researched critical scheduling metrics in the field. This allows management teams to have more confidence in establishing critical milestones and accurate turnover dates from the start of the project through its final completion.

  • PDF

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

프로젝트 관리의 성공에 영향을 미치는 장애요인 (Barriers to Success of Project Management)

  • 이아연;문경미;김승철
    • 산업경영시스템학회지
    • /
    • 제43권3호
    • /
    • pp.179-190
    • /
    • 2020
  • As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.

주제중심 프로젝트 모형을 적용한 해양분야의 STEAM 교육 설계 및 효과 분석 (Designing of STEAM Education in the Marine Field Applied with the Thematic Project Model and an Analysis of its Effect)

  • 최성봉
    • 수산해양교육연구
    • /
    • 제25권4호
    • /
    • pp.915-927
    • /
    • 2013
  • This study aimed to discover the affective ability of students by applying a thematic project model concerning the marine field unit of science for third grade middle school students from among diverse methods of realizing STEAM education. Also, based on this, STEAM education is a new type of learning including the process of exploring by oneself, presenting, discussing and mutually evaluating by becoming an independent person in learning As the results of the study are as follows: First, the STEAM class applied with a thematic project model was discovered to promote a learning attitude toward science by learners. Second, the STEAM class applied with a thematic project model was shown to be effective in improving the self-directed learning characteristics of learners. Third, STEAM education applied with a thematic project model was found to promote learners' motivation for learning science. This may be an effective method for learners who have felt difficulty in the science curriculum or have not been interested in the curriculum by triggering voluntary motivation.

DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석 (Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method)

  • 이아연;장미경
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.