• 제목/요약/키워드: Project Cost Saving

검색결과 104건 처리시간 0.026초

Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 - (An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea-)

  • 임재환;이민수
    • 농업과학연구
    • /
    • 제29권1호
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

지방도시근교 단독주택의 외피구성 현황에 관한 연구 - 광주광역시/전남 소규모 건축설계사무소 실무자를 대상으로 - (A Study on the Current Status of Building Envelope in detached houses of near Local Cities - with Staff of Small-sized Architectural Design Firms in Gwangju and Jeonnam -)

  • 박성진;이창재
    • KIEAE Journal
    • /
    • 제13권2호
    • /
    • pp.53-60
    • /
    • 2013
  • This study examined the building envelope structure used in small housings near urban area which have not good energy source in relation to the application of passive design for energy saving of small-sized architectural design firms in local cities and aimed to provide the basic materials of future design direction of designers and housing owners by analyzing economy of a project in order to know the amount of energy saving and additional expenses depending on the building envelope pattern. As a result of comparing and examining the energy saving cost from the period of use compared to investment by the thickness of insulating materials based on building envelope pattern for energy saving, it was found that the thicker the insulating materials are, the more energy saving amount is. While the current bead-type insulating materials have short payback period due to low initial investment, extruded insulating materials show the difference of five years compared to bead-type insulation because of its high initial investment.

1MWh급 레독스흐름전지의 부하이전용 최적운전에 따른 전기요금 절감효과 분석 (Analysis of Electricity Cost Saving Effect by the Optimal load shifting Operation with 1MWh Redox Flow Battery)

  • 백자현;고은영;강태혁;이한상;조수환
    • 전기학회논문지
    • /
    • 제65권7호
    • /
    • pp.1151-1160
    • /
    • 2016
  • In recent years, the energy storage systems such as LiB, NaS, RFB(Redox-Flow Battery), Super- capacitor, pumped hydro storage, flywheel, CAES(Compressed Air Energy Storage) and so on have received great attention as practical solutions for the power supply problems. They can be used for various purpose of peak shaving, load leveling and frequency regulation, according to the characteristics of each ESS(energy storage system). This paper will focus at 1 MWh RFB system, which is being developed through the original technology project of energy material. The output of ESS is mainly characterized by C-rate, which means that the total rated capacity of battery will be delivered in 1 hour. And it is a very important factor in the ESS operation scheduling. There can be several options according to the operation intervals 15, 30 and 60minutes. The operation scheduling is based on the optimization to minimize the daily electricity cost. This paper analyzes the cost-saving effects by the each operating time-interval in case that the RFB ESS is optimally scheduled for peak shaving and load leveling.

농업용 저수지 준설토의 처리 공법에 따른 경제성 분석 (Economical Feasibility of the Treatment Methods of the Dredged Sediments from Contaminated Agricultural Reservoirs)

  • 오경희;조영철
    • 대한환경공학회지
    • /
    • 제35권10호
    • /
    • pp.756-762
    • /
    • 2013
  • 농업용 저수지의 수질과 저서환경을 개선하기 위해 저수지로부터 제거된 퇴적물의 친환경적 처리 방안을 모색하기 위해 실시된 퇴적물처리 시범사업의 경제성을 분석하였다. 비용은 집행된 사업비로 산출하였으며, 편익은 퇴적물 재활용으로 인한 폐기물 처리비용의 절감, 퇴적물 제거로 인한 침강지 건설비용의 절감, 저수지 내용적 증가로 인한 용수 확보 등의 3가지 요소로 설정하였으며, 이를 대체비용법을 이용하여 화폐화하고 현재가치화하였다. 편익 비용 비율(B/C)을 구하였을 때, 대상저수지에 따라 달랐으나 전체 사업의 B/C 값은 1.32로 경제성이 높은 것으로 평가되었다. 준설토 처리 공법에 따른 경제성을 분석한 결과, 응집침전 공법, 기계탈수공법, 열반응안정화공법, 토양개량안정화공법의 순으로 경제성이 높았다. 기계탈수공법의 경우 타 공법에 비해 처리토의 재활용이 쉬우며, 2차 오염을 발생하지 않고, 경제성이 뛰어나기 때문에, 저수지로부터 제거된 퇴적물을 처리하기에 가장 적합한 방법인 것으로 평가되었다.

시공단계와 유지관리단계 비용분류체계의 경계조건 분석 (Analysis of Boundary Conditions for Cost Breakdown Structure in the Construction and Maintenance phase)

  • 정재혁;신한우;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.21-23
    • /
    • 2012
  • The process of building project for planning, designing, construction, maintenance, and waste disposal are related with each other. However, we have a difficulty for estimating building's LCC due not to be flexible each other. Therefore, we analyzed the boundary condition between the process of construction and maintenance, and analyzed the factor of segment. We also suggested the Link System for flexible relation.

  • PDF

책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 - (CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA -)

  • 정진학;한종훈;이주성;안용한
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.22-30
    • /
    • 2019
  • 최근 건설 사업이 복잡해지고 대형화 되며 발주자의 요구사항 또한 다양해지고 있다. 그에 따라 책임형 CM 발주방식이 대두되었지만 국내 책임형 CM 프로젝트 수행사례는 민간 부분에서만 몇 차례 진행되었고 국내의 건설사의 프로젝트 경험 및 자료도 부족한 실정이다. 또한 건설 프로젝트는 다수의 프로젝트 주체들이 가시화 되지 않은 결과물에 대한 목적, 기간, 비용, 각 당사자의 권리와 책임, 이익 등을 합의하여 계약으로 명문화 하는 특성을 갖기 때문에 계약서의 작성 및 관리는 계약의 목적물인 프로젝트의 성공적 수행과 매우 밀접한 관계가 있다. 따라서 본 연구에서는 책임형 CM 발주방식이 보편화 되어있는 미국의 사례 중 GMP 계약 방식으로 수행된 프로젝트의 계약서에 대해 고찰하여 GMP 구성요소 및 프로세스에 대한 공통 요소를 도출하고 국내 책임형 CM 프로젝트 수행 시 이용 될 수 있는 기초자료를 제안 하였다. 본 연구에서 도출해 낸 GMP구성 요소 및 프로세스는 국내 시범사업이 완료된 이후에 국내와 해외 사례를 비교 분석하여 국내에 효과적인 적용 법에 대한 추후 연구가 진행 될 수 있을 거라 판단된다. 또한 건축물 종류별 GMP 요소를 비교하여 건물 종류별 적합한 적용 법에 대한 연구도 진행 될 수 있을 것이라 사료된다.

PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)

  • 백인희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

ECONOMIC ANALYSIS BY GLASS TYPES IN BALCONY CONVERSION OF MULTI-FAMILY HOUSING PROJECTS

  • H.G. Kim;D.I. Kim;D.W. Ko;T.H. Hong;C.T. Hyun;K.J. Koo
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.625-634
    • /
    • 2007
  • Energy-saving is one of important issues in multi-family housing projects in South Korea. According to the study by Yu et al. (2002), the balcony conversion causes energy loss approximately one and a half times. Therefore, it is important to select the economical glass type in the balcony window. In order to identify the most economical glass type of balcony conversion in multi-family housing projects, the most typical type of the multifamily housing projects in the metropolitan area was selected as a candidate project. The selected candidate project has been simulated using ENERGY-10 program to estimate the heat load by the different five types of glasses as well as their life cycle cost analysis (LCCA) using present worth method. Finally, sensitivity analysis has been conducted to determine the most economical glass types under a different discount rate (interest rate) and service life of building.

  • PDF

건설 구조물의 공장생산방식 적용 의사결정모델에 관한 연구 (Decision Making Model for Application of Manufacturing Production System in Construction Project)

  • 진의재;박상혁;채명진;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.515-520
    • /
    • 2004
  • 최근 건설산업은 구조물의 일부 또는 전체를 대상으로 제조업의 체계적인 생산시스템인 공장생산방식을 활용하여 생산성을 향상시키기 위한 방안을 마련하고 있다. 하지만 효과를 검증하지 않고 무조건적으로 공장생산방식을 도입한다면 생산 규모와 위치에 따라 현장생산보다 공사비용이나 공기가 증가되는 경우도 있다. 공장생산방식을 보다 효과적으로 활용하기 위해서는 공장생산방식과 현장생산방식을 다양한 기준으로 비교해본 후 적용여부에 대한 의사결정이 이루어져야한다. 본 연구는 기존의 연구와 사례분석을 통하여 공장생산방식의 적용에 필요한 의사결정요인을 도출하고 이를 고려한 의사결정모델을 제시하고자한다 크게 3단계의 연구방법을 거쳐 의사결정을 내릴 수 있는 의사결정순서도와 의사결정모형도를 작성하였다. (1) 공장생산방식 적용 의사결정요인을 도출하고 구조화하여 (2) 공장생산의 규모와 공장의 위치의 변화에 따른 이익, 비용, 공기를 산출한 후 (3) 현장생산방식과 공장생산방식을 반복적으로 비교함으로써 의사결정을 내릴 수 있는 모델을 제시하였다.

  • PDF