• Title/Summary/Keyword: Production scheduling

Search Result 452, Processing Time 0.026 seconds

Conceptual Design of Production Planning and Scheduling Module to Improve Delivery Quality

  • Choi, Jung-Sang
    • Journal of the military operations research society of Korea
    • /
    • v.29 no.1
    • /
    • pp.112-119
    • /
    • 2003
  • The procedure and implementation of an simulation based production planning and scheduling system. Production planning and scheduling is important problem in manufacturing field. It is so important for delivery quality as well as productivity, too. In this paper, heuristic production planning and scheduling module for improving delivery quality and productivity will be discussed. Beginning with total demand and initial work in process, the algorithms for production scheduling and planning can efficiently generate a feasible production resources and capacity schedule results in high resource utilization, minimum number of the late orders and reduced labor variability. The algorithm is executed to achieve the best on time delivery performance. The developed heuristic algorithms in the module will be expected to provide the better delivery performance and productivity.

A production scheduling Method considering Usability of Form Module Combinations (형상모듈 조합의 이용 가능 여부를 활용한 생산 스케줄링 방법)

  • Seokmin, Han
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.1
    • /
    • pp.139-144
    • /
    • 2023
  • Recently, many manufacturing companies are paying more attention to energy efficiency due to increased energy costs. Energy-efficient scheduling of production systems is a good method for energy efficiency improvement and cost reduction. In this research, we assumed the tire production problem and aim to construct a production scheduling considering specific shape module types, ordered amount for each tire, number of production modules, and the production time for each type. To facilitate effective production scheduling, we considered the types and number of shape modules currently available, and tire types that can be selected to be produced in the next stage were used as additional inputs, In addition to that, additional production was permitted to reduce the halt of production processing. Thus, an average production module utilization rate of about 62 percent was obtained.

An Algorithm for Single Machine Scheduling Using The Control of Machining Speed (단일공정에서의 가공속도 조절에 의한 생산일정계획)

  • 박찬웅
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.162-169
    • /
    • 1998
  • This study presents an single machine scheduling algorithm minimize lateness of product by controlling machining speed. Generally, production scheduling uses the information of process planning. But the production scheduling algorithm has not considered the control of machining speed in its procedures. Therefore, the purpose of this study is to consider the machining speed in production scheduling algorithm for efficient production scheduling. Machining time and machining cost required to manufacture a piece of a product are expressed as a unimodal convex function with respect to machining speed, so it has minimal point at minimum time speed or the minimum cost speed. Therefore, because of considering the machining cost, the control of machining speed for the algorithm is executed between minimum speed and maximum speed. An example is demonstrated to explain the algorithm.

  • PDF

이산적 시뮬레이션 모델을 이용한 커피 생산 스케줄

  • 박영홍
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2000.11a
    • /
    • pp.28-33
    • /
    • 2000
  • This article describes the application of discrete event simulation in a process industry (coffee manufacturing) as a daily production-scheduling tool. A large number of end products (around 300), sporadic demand, and limited shelf life of coffee (90 days) make it difficult to generate feasible production schedules manually. To solve this problem an integrated system was developed incorporating discrete event simulation methodology into scheduling process. The integrated system is comprised of two components: a scheduling program and a simulation model. The scheduling program is used to generate daily schedules for roasting, grinding, and packing coffee. The simulation model uses the generated schedules to simulate the production of coffee and regenerates a modified production schedule. In this paper, each of the components will be described in detail, evaluated in terms of performance factors, and validated with a set of real production data. Although this article focuses on a specific system, we will share our experiences and intuitions gained and encourage other process industries to develop simulation-based scheduling tools.

  • PDF

Systems Engineering Approach to Develop Intelligent Production Planning Scheduling Model linked to Machine and Quality Data (설비 및 품질 데이터 연계 지능형 생산계획 스케줄링 모델 개발을 위한 시스템엔지니어링 접근 방법)

  • Park, Jong Hee;Kim, Jin Young;Hong, Dae Geun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.1-8
    • /
    • 2021
  • This study proposes a systems engineering approach for the development of an advanced planning & scheduling (APS) system for a cosmetic case manufacturing factory. The APS system makes production plans and schedules based on the injection process, which consists of 27 plastic injection machines in parallel to control recommended inventory of products. The system uses machine operation/failure information and defective product/work-in-process tracking information to support intelligent scheduling. Furthermore, a genetic algorithm model is applied to handle the complexity of heuristic rules and machine/quality constraints in this process. As a result of the development, the recommended inventory compliance rate is improved by scheduling the 30-day production plan for 15 main products.

Production Scheduling using Overtime (잔업을 고려한 생산 스케쥴링)

  • 민병도;임석철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.197-205
    • /
    • 1997
  • Manufacturers can meet the due dates of orders by using overtime, in which case, additional cost incurs for the amount of overtime. Although many studies have been reported on scheduling, only a few papers are founds on production scheduling using overtime. We consider the problem of production scheduling using overtime on a single machine, in which each job has a given due-date, a constant processing time. We assume that the daily overtime does not exceed the daily regular operation time. The objectives is to minimize the total overtimes, while meeting all due dates. We first present a mathematical model, and then suggest a heuristic algorithm for the problem.

  • PDF

Determination of Machining Speed Considering Failure Cost (절삭 가공에서의 불량 발생 비용을 고려한 가공속도 결정에 관한 연구)

  • Park, Chan-Woong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.153-158
    • /
    • 2010
  • This study presents a single machine scheduling algorithm to minimize total cost(lateness cost, earliness cost and failure cost) by controlling machining speed. Generally, production scheduling uses the information of process planning and machining speed is not changed at production scheduling. And failure cost is not consider for scheduling algorithm. Therefore, the purpose of this study is to consider the change of machining speed for efficient production scheduling. And performance criteria for algorithm considers total cost. Especially, failure cost of product by increasing machining speed is considered.

Real-Time DBR Scheduling in Internet Based Make-to-Order Manufacturing (인터넷을 통한 주문생산환경에서의 실시간 생산 DBR 스케줄링)

  • Han, Young-Geun;Kim, Yeon-Kyun
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.341-347
    • /
    • 2001
  • This paper describes a real-time manufacturing scheduling system on Internet using DBR(Drum-Buffer-Rope) scheduling method. We intend to change company-oriented manufacturing scheduling, which has been used at most manufacturing companies, to customer-oriented manufacturing scheduling. Customers can not only choose product kinds, quantities and order due dates, but also evaluate optimum order due date by themselves in real-time through internet and then the results will be converted into practical manufacturing scheduling. If the company cannot meet the customer order due date, it will offer reliable and accurate information to the customers by suggesting the earliest order due date. To evaluate the customer order due date in real time, companies should be able to estimate their accurate production capacity. This research uses Goldratt's DBR scheduling method to realize that function. The DBR scheduling does not recognize the production capacity of the whole company, but only of the constraint resources which have a great effect on the company throughput. Thus, it can improve the customer service level as well as the profit by performing more dynamic and reliable scheduling through Internet.

  • PDF

LSB Algorithm for the Job Oriented Heuristic Scheduling (작업지향 탐색적 일정계획을 위한 LSB 기법)

  • Kim Hyun-joon;Park Changkyu
    • Korean Management Science Review
    • /
    • v.21 no.2
    • /
    • pp.79-91
    • /
    • 2004
  • In industrial production settings, scheduling problems for detailed day-to-day operations are often ordeals to production practitioners. For those who have scheduling experiences with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large scale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. In this paper, we Introduce the LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through a computer experiment in a hypothetical setting, we make a performance comparison of LSB scheduling algorithm with existing algorithms and also suggest a guideline for selecting the suitable algorithm for certain industrial settings.

A Systematic Review of Predictive Maintenance and Production Scheduling Methodologies with PRISMA Approach

  • Salma Maataoui;Ghita Bencheikh;Ghizlane Bencheikh
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.1
    • /
    • pp.215-225
    • /
    • 2024
  • Predictive maintenance has been considered fundamental in the industrial applications in the last few years. It contributes to improve reliability, availability, and maintainability of the systems and to avoid breakdowns. These breakdowns could potentially lead to system shutdowns and to decrease the production efficiency of the manufacturing plants. The present article aims to study how predictive maintenance could be planed into the production scheduling, through a systematic review of literature. . The review includes the research articles published in international journals indexed in the Scopus database. 165 research articles were included in the search using #predictive maintenance# AND #production scheduling#. Press articles, conference and non-English papers are not considered in this study. After careful evaluation of each study for its purpose and scope, 50 research articles are selected for this review by following the 2020 Preferred Reporting Items for Systematic Review and Meta-Analysis Protocols (PRISMA) statement. A benchmarking of predictive maintenance methods was used to understand the parameters that contributed to improve the production scheduling. The results of the comparative analysis highlight that artificial intelligence is a promising tool to anticipate breakdowns. An additional impression of this study is that each equipment has its own parameters that have to be collected, monitored and analyzed.