• 제목/요약/키워드: Procurement management

검색결과 485건 처리시간 0.027초

제조업종의 표준 업무프로세스 개발 연구 (A Study on Process-driven Standardization in Manufacturing Industries)

  • 김훈태;정한일;한정우;양은찬;임춘성
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2001년도 International Conference CALS/EC KOREA
    • /
    • pp.277-288
    • /
    • 2001
  • Nowadays, for the competitive power of an enterprise, there are many attempts to implement information system that could support business innovation by business process re-engineering. However, there is no effort to standardize the core business processes of enterprise based on standards of data, documents. These facts make it difficult to introduce and implement enterprise information system designed by business processes of the higher level. Therefore, standardization of business process by analyzing the functionality and relationships among them are important and necessary. The results of our research are summarized as process-driven standardization (standardization of core business processes) and development of a repository. In process-driven standardization, we proposed the reference model by analyzing the business processes of the leading enterprises for core business processes. The reference model focuses on core business processes, such as sales management, procurement management, production management, logistics management, and customer support in manufacturing industry. We developed a knowledge-based system as a repository for a integrated management system of business process. And this repository was built up web-based system for the purpose of both reference and management.

  • PDF

우주 발사 시스템 개발에 있어서의 SE 관리기법 적용 (Application of SE Management Techniques for Space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.53-60
    • /
    • 2005
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effectiveness of these techniques. Management plans and guides are prepared for the work breakdown structure, data, configuration, interface control, quality assurance, procurement, reliability, risk and verification/validat ion. Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering management system.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

건설 B2B e-Marketplace 사례연구 (A Case Study On the Construction B2B e-Marketplace)

  • 최재화;이윤호
    • 경영정보학연구
    • /
    • 제6권1호
    • /
    • pp.141-153
    • /
    • 2004
  • 건설업 특성상 공사비용의 약 $40{\sim}60%$가 자재의 구매 및 조달에 투자되는 만큼 B2B e-Marketplace를 통한 건설자재 구매는 최적의 비용과 기존 Off-line에서 낭비된 시간과 절차를 단축 할 수 있다는 점에서 건설기업의 큰 관심을 끌고 있다. 건설 B2B e-Marketplace는 중소 건자재 제조회사 및 중소 건설기업 모두에게 비즈니스 범위를 넓혀 줌으로써 대기업 위주의 건설시장에 활력을 일으킬 수 있다. 그러나 현재 국내의 어떤 산업을 막론하고 B2B e-Marketplace는 기대 이하의 저조한 시장 참여로 심각한 수준에 이르고 있다. 건설업에서도 초기에 보였던 건자재 분야 B2Be-Marketplace의 낙관적 전망은 특정 대기업을 제외하고는 실질적인 이익이나 운영 실적면에서 뚜렷하게 성과를 나타나지 못하고 있다. 본 연구는 건설 B2B e-Marketplace의 운영 현황을 사례조사를 통해 파악한다.

BIM 기반/스마트 BOM의 형상관리에 의한 전 생명주기를 고려한 철도건설사업관리 시스템 및 방법에 관한 고찰 (BIM-based Smart BOM by the Configuration Management of the Life-cycleconsidering the Railway Construction Project Management System and Method)

  • 정수영;이종성;박수중;이근영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2280-2285
    • /
    • 2011
  • As the prefecture railroad construction accelerates, unmanned system's reliability and safety is increasing in demand. Accordingly, effective management of construction projects for the PM and SE techniques are being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. This study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

효율적인 공급자 선정을 위한 SLV(Supplier Lifetime Value)시스템 구현에 관한 사례 연구 (A Study On Realization of SLV System for Selecting Supplier)

  • 양광모;박재현;강경식
    • 대한안전경영과학회지
    • /
    • 제6권2호
    • /
    • pp.167-178
    • /
    • 2004
  • Supply chain management and e-procurement system built in the company, are set goal of internal process improvement. This paper show how SLV(Supplier Lifetime Value) can be used to structure the supplier in automotive part manufacturer, the method of selection is described and a detailed example of how SLV can be used and allocation of order Quantity for the selected suppliers also are provided, and aims at giving a method to realization profitable supplier relation using search for SL V system development which is making corporation with supplier, in the favor of decision supplier.

원전건설 공급망관리 기술영역 도출을 위한 기초연구 (A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction)

  • 박항순;김우중;정영환;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

사회적기업 지원정책 중요도에 대한 연구 -부산지역 전문가 AHP분석을 통한- (The AHP Analysis of Critical Factors on Social Enterprise Policy)

  • 김용호;송경수
    • 경영과정보연구
    • /
    • 제29권4호
    • /
    • pp.267-286
    • /
    • 2010
  • 정부는 사회적기업의 지속성을 높이기 위해 사회적기업육성법의 재정을 통해 경영지원, 시설비 지원, 공공기관 우선구매, 조세 및 보험료 지원, 재정지원등과 같은 다양한 정부지원제도를 구축하고 있고, 기업 및 지역과의 연계방안 활성화, 예비사회적기업의 활성화, 자본시장의 활성화, 연구기관의 활성화, 사회적기업에 대한 사회인식의 활성화, 지역특화 사회적기업의 활성화와 같은 사회적기업 기반구축 및 문화의 형성에 노력하고 있다. 정부의 이러한 노력이 사회적기업 현장에서 효율적으로 반영되고 정책수용자인 사회적기업가들이 만족하는 정책이 되기 위해서는 많은 정책들의 중요성과 우선 순위에 대한 평가가 따라야 할 것이다. 따라서 본 연구는 부산지역의 사회적기업 전문가들을 대상으로 정부정책에 대한 AHP분석을 통해 정책의 우선순위를 알아 보고자 하였다.

  • PDF

건설업 산재 은폐의 문제점과 대책에 관한 연구 (A Study on the Problem and Countermeasure of Concealment of Industrial Accident in Construction Site)

  • 최만진;강경식
    • 대한안전경영과학회지
    • /
    • 제10권3호
    • /
    • pp.29-33
    • /
    • 2008
  • According to statistics released by the Ministry of Labor for the past 6 years, work-related accidents in the construction industry have been on the continued increase, resulting in social and economic losses that are difficult to determine at an exact amount. However, the number will likely get much bigger if unreported cases are included, considering the fact that the aforementioned statistics are based soley on the applications filed with Korea Workers' Compensation and Welfare Service. The practice of businesses choosing not to report and dealing with industrial accidents in an unauthorized manner is defined as "concealment of industrial accident". The reason the employers tend to engage in the concealment practice even at their huge cost is a "pre-qualification" scheme for the applicants in the government procurement process. Under the pre-qualification scheme, the applicants with a high rate of industrial accidents receive a low grade and become less attractive candidates in the procurement process, thus losing an opportunity to win a contract. Such failure relates directly to the fate of business organizations, to survive or not. That is why they are making all-out efforts to obtain a high grade in the pre-qualification evaluation. With regard to the accident-concealment problem, the following can be mentioned as preventive measures: (1) To exclude a rate of industrial accidents from the pre-qualification scheme; (2) To strengthen the institution of imposing penalties on the occurrence of industrial accidents; (3) To introduce private insurance system to the current industrial accident compensation insurance; and (4) To give non-recognition treatment to industrial accidents that were not reported upon occurrence. In conclusion, the concealment problem can be resolved if the aforementioned measures are to be taken continuously along with corrective measures against institutional deficiencies.

건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로- (A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing-)

  • 전영진;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.