• Title/Summary/Keyword: Process Scheduling

Search Result 802, Processing Time 0.031 seconds

Integer Programming-based Operation Sequencing for Multi-operation on Single Machine (정수계획법을 통한 다중작업 수행 단일기계에서의 작업순서 결정)

  • Park, Seonyeong;Shin, Moonsoo
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.9 no.3
    • /
    • pp.261-270
    • /
    • 2019
  • With the advent of the Fourth Industrial Revolution, multi-variety production in the up-to-date manufacturing environment is proceeding more rapidly whereby production planning and management have been getting more complicated. Moreover, the need to improve production efficiency through effective operation sequencing is further heightened. Fundamentally, the effective operation sequencing can reduce the set-up of the equipment, efficiently utilize the equipment, shorten the set-up time, and ultimately contribute to productivity improvement. This study deals with the problem of efficient operation sequencing in a situation where a single machine performs multiple operations. The complexity of the problem is very high when compared to the case where only one operation is performed on one machine, which is covered in most existing studies. In this paper, we propose an integer programming model to minimize the number of setups. This study aims at minimizing the number of mold replacement times in the process of processing a given production order for the wiring harness manufacturing process, which is one of the components of automobile electric field. In addition, brief case studies are presented to verify the validity of the proposed mathematical model.

A Study of Competency for R&D Engineer on Semiconductor Company (반도체 기술 R&D 연구인력의 역량연구 -H사 기업부설연구소를 중심으로)

  • Yun, Hye-Lim;Yoon, Gwan-Sik;Jeon, Hwa-Ick
    • 대한공업교육학회지
    • /
    • v.38 no.2
    • /
    • pp.267-286
    • /
    • 2013
  • Recently, the advanced company has been sparing no efforts in improving necessary core knowledge and technology to achieve outstanding work performance. In this rapidly changing knowledge-based society, the company has confronted the task of creating a high value-added knowledge. The role of R&D workforce that corresponds to the characteristic and role of knowledge worker is getting more significant. As the life cycle of technical knowledge and skill shortens, in every industry, the technical knowledge and skill have become essential elements for successful business. It is difficult to improve competitiveness of the company without enhancing the competency of individual and organization. As the competency development which is a part of human resource management in the company is being spread now, it is required to focus on the research of determining necessary competency and to analyze the competency of a core organization in the research institute. 'H' is the semiconductor manufacturing company which has a affiliated research institute with its own R&D engineers. Based on focus group interview and job analysis data, vision and necessary competency were confirmed. And to confirm whether the required competency by job is different or not, analysis was performed by dividing members into workers who are in charge of circuit design and design before process development and who are in the process actualization and process development. Also, this research included members' importance awareness of the determined competency. The interview and job analysis were integrated and analyzed after arranging by groups and contents and the analyzed results were resorted after comparative analysis with a competency dictionary of Spencer & Spencer and competency models which are developed from the advanced research. Derived main competencies are: challenge, responsibility, and prediction/responsiveness, planning a new business, achievement -oriented, training, cooperation, self-development, analytic thinking, scheduling, motivation, communication, commercialization of technology, information gathering, professionalism on the job, and professionalism outside of work. The highly required competency for both jobs was 'Professionalism'. 'Attitude', 'Performance Management', 'Teamwork' for workers in charge of circuit design and 'Challenge', 'Training', 'Professionalism on the job' and 'Communication' were recognized to be required competency for those who are in charge of process actualization and process development. With above results, this research has determined the necessary competency that the 'H' company's affiliated research institute needs and found the difference of required competency by job. Also, it has suggested more enthusiastic education methods or various kinds of education by confirming the importance awareness of competency and individual's level of awareness about the competency.

Design Information Management System Core Development Using Industry Foundation Classes (IFC를 이용한 설계정보관리시스템 핵심부 구축)

  • Lee Keun-hyung;Chin Sang-yoon;Kim Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.98-107
    • /
    • 2000
  • Increased use of computers in AEC (Architecture, Engineering and Construction) has expanded the amount of information gained from CAD (Computer Aided Design), PMIS (Project Management Information System), Structural Analysis Program, and Scheduling Program as well as making it more complex. And the productivity of AEC industry is largely dependent on well management and efficient reuse of this information. Accordingly, such trend incited much research and development on ITC (Information Technology in Construction) and CIC (Computer Integrated Construction) to be conducted. In exemplifying such effort, many researchers studied and researched on IFC (Industry Foundation Classes) since its development by IAI (International Alliance for Interoperability) for the product based information sharing. However, in spite of some valuable outputs, these researches are yet in the preliminary stage and deal mainly with conceptual ideas and trial implementations. Research on unveiling the process of the IFC application development, the core of the Design Information management system, and its applicable plan still need be done. Thus, the purpose of this paper is to determine the technologies needed for Design Information management system using IFC, and to present the key roles and the process of the IFC application development and its applicable plan. This system play a role to integrate the architectural information and the structural information into the product model and to group many each product items with various levels and aspects. To make the process model, we defined two activities, 'Product Modeling', 'Application Development', at the initial level. Then we decomposed the Application Development activity into five activities, 'IFC Schema Compile', 'Class Compile', 'Make Project Database Schema', 'Development of Product Frameworker', 'Make Project Database'. These activities are carried out by C++ Compiler, CAD, ObjectStore, ST-Developer, and ST-ObjectStore. Finally, we proposed the applicable process with six stages, '3D Modeling', 'Creation of Product Information', 'Creation and Update of Database', 'Reformation of Model's Structure with Multiple Hierarchies', 'Integration of Drawings and Specifications', and 'Creation of Quantity Information'. The IFCs, including the other classes which are going to be updated and developed newly on the construction, civil/structure, and facility management, will be used by the experts through the internet distribution technologies including CORBA and DCOM.

  • PDF

Volume Rendering System of e-Science Electron Microscopy using Grid (Gird를 이용한 e-사이언스 전자현미경 볼륨 랜더링 시스템)

  • Jeong, Won-Gu;Jeong, Jong-Man;Lee, Ho;Choe, Sang-Su;Ahn, Young-heon;Hur, Man-Hoi;Kim, Jay;Kim, Eunsung;Jung, Im Y.;Yeom, Heon Y.;Cho, Kum Won;Kweon, Hee-Seok
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.560-564
    • /
    • 2007
  • Korea Basic Science Institute(KBSI) has three general electron microscopes including High Voltage Electron Microscope(HVEM) which is the only one in Korea. Observed images through an electron microscope are what they are tilted by each step and saved, offering the more better circumstances for observers, a reconstruction to 3D could be a essential process. In this process, a warping method decreases distortions maximumly of avoided parts of a camera's focus. All these image treatment processes and 3D reconstruction processes are based on an accompaniment of a highly efficient computer, a number of Grid Node Personal computers share this process in a short time and dispose of it. Grid Node Personal computers' purpose is to make an owner can share different each other and various computing resources efficiently and also Grid Node Personal computers is applying to solve problems like a role scheduling needed for a constructing system, a resource management, a security, a capacity measurement, a condition monitoring and so on. Grid Node Personal computers accomplish roles of a highly efficient computer that general individuals felt hard to use, moreover, a image treatment using the warping method becomes a foundation for reconstructing to more closer shape with an real object of observation. Construction of the electron microscope volume 랜더링 system based on Grid Node Personal computer through the warping process can offer more convenient and speedy experiment circumstances to observers, and makes them meet with experiment outcome that is similar to real shapes and is easy to understand.

  • PDF

A Survey on Nurses' Utilization of Computerization in Nursing Practice (간호사의 간호업무 전산화 활용에 대한 조사연구)

  • Rhee, In-Soon
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.5 no.2
    • /
    • pp.209-224
    • /
    • 1999
  • I have practiced this reserch for the purpose of proposition of basic data for amendment and addition of computer system after I surveyed the degree of abilities and satisfaction on the computerization in nursing\ practice. Subjects were collected from September 1 to September 30, 1998. Study subjects are 151 clinical nurses who are working at university hospital in Chonbuk area. Study instrument consists of 116 questionnaire which was developed by Kim H. K(1998). The data were analized number, mean ,t-test, ANOVA by using SPSS. The study results are as follows: 1. Most of the nurses who answered the questions were educated computerizing(96%). The abilities of computer program utilities were the most in inputting data(74%). The program nurses wanted computerizing education was wordprocess, dealing internet and statistics. 2. As for applying parts of computer system in nursing, the most nurses were Dr's order check (96%), treatment activity(91.4%), medication(89.4%), lab. test(87 .4%), transfering department(85.4%), transfering room(79.5%), diet(71.8%), discharge (70.2%), Barcord Sticker(70.2%) , reservation(62.2%) in order that were all conected order system mutually to other part. It showed that computer system was not applied for treating the original nursing work such as nursing record (13%), duty scheduling(6.0%) , nursing process(4.6%) , Q.I(1.3%), nursing research(1.3%), education(1.3%), 3. As for the benefit when computer system is applied for, the most respondence was promptness of work and convenience(90.6%) , exactness of work (82.8%), offering information exactily and efficiently(36.3%), offering good quality of nursing (6.0%) in order. 4. The degree of contentment on computerizing in nursing practice showed average 3.24%. The best marking item is that they are eager to participate in the computer education. Next, the automatic output of label and giving the number automatically is to prevent loss and mentioned items of patient registration from being changed(3.95) and to prevent mistakes possibly happening because of doctor's difficult order(3.85). 5. The problems which may happen to in nurses' utilization of computerization for the nursing practice showed average 3.18. The most problem is that the practice may stop because of the problem of computer itself(3.67), and the next, the indication of act can be imperfect(3.66) , manual training may overlap because of incomplete computerization (3.60), practical education for the computerizing is lack(3.41), and the computer literate nurses are lack(3.40) . 6. Study subject's contentment by age was significant difference(F=3.10,P=0.0119). Study subject's contentment by job posision was significant difference(F=6.001P=0.0034) I will propose the following according to the above results. The domain of original nursing practice is urgernt. Manual and indication of act should be made before long in computer obstacle. Nursing department should support the nurses so that they could receive the education needed for the nurses themselves.

  • PDF

Multi-View Video System using Single Encoder and Decoder (단일 엔코더 및 디코더를 이용하는 다시점 비디오 시스템)

  • Kim Hak-Soo;Kim Yoon;Kim Man-Bae
    • Journal of Broadcast Engineering
    • /
    • v.11 no.1 s.30
    • /
    • pp.116-129
    • /
    • 2006
  • The progress of data transmission technology through the Internet has spread a variety of realistic contents. One of such contents is multi-view video that is acquired from multiple camera sensors. In general, the multi-view video processing requires encoders and decoders as many as the number of cameras, and thus the processing complexity results in difficulties of practical implementation. To solve for this problem, this paper considers a simple multi-view system utilizing a single encoder and a single decoder. In the encoder side, input multi-view YUV sequences are combined on GOP units by a video mixer. Then, the mixed sequence is compressed by a single H.264/AVC encoder. The decoding is composed of a single decoder and a scheduler controling the decoding process. The goal of the scheduler is to assign approximately identical number of decoded frames to each view sequence by estimating the decoder utilization of a Gap and subsequently applying frame skip algorithms. Furthermore, in the frame skip, efficient frame selection algorithms are studied for H.264/AVC baseline and main profiles based upon a cost function that is related to perceived video quality. Our proposed method has been performed on various multi-view test sequences adopted by MPEG 3DAV. Experimental results show that approximately identical decoder utilization is achieved for each view sequence so that each view sequence is fairly displayed. As well, the performance of the proposed method is examined in terms of bit-rate and PSNR using a rate-distortion curve.

Design and Implementation of An I/O System for Irregular Application under Parallel System Environments (병렬 시스템 환경하에서 비정형 응용 프로그램을 위한 입출력 시스템의 설계 및 구현)

  • No, Jae-Chun;Park, Seong-Sun;;Gwon, O-Yeong
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.26 no.11
    • /
    • pp.1318-1332
    • /
    • 1999
  • 본 논문에서는 입출력 응용을 위해 collective I/O 기법을 기반으로 한 실행시간 시스템의 설계, 구현 그리고 그 성능평가를 기술한다. 여기서는 모든 프로세서가 동시에 I/O 요구에 따라 스케쥴링하며 I/O를 수행하는 collective I/O 방안과 프로세서들이 여러 그룹으로 묶이어, 다음 그룹이 데이터를 재배열하는 통신을 수행하는 동안 오직 한 그룹만이 동시에 I/O를 수행하는 pipelined collective I/O 등의 두 가지 설계방안을 살펴본다. Pipelined collective I/O의 전체 과정은 I/O 노드 충돌을 동적으로 줄이기 위해 파이프라인된다. 이상의 설계 부분에서는 동적으로 충돌 관리를 위한 지원을 제공한다. 본 논문에서는 다른 노드의 메모리 영역에 이미 존재하는 데이터를 재 사용하여 I/O 비용을 줄이기 위해 collective I/O 방안에서의 소프트웨어 캐슁 방안과 두 가지 모형에서의 chunking과 온라인 압축방안을 기술한다. 그리고 이상에서 기술한 방안들이 입출력을 위해 높은 성능을 보임을 기술하는데, 이 성능결과는 Intel Paragon과 ASCI/Red teraflops 기계 상에서 실험한 것이다. 그 결과 응용 레벨에서의 bandwidth는 peak point가 55%까지 측정되었다.Abstract In this paper we present the design, implementation and evaluation of a runtime system based on collective I/O techniques for irregular applications. We present two designs, namely, "Collective I/O" and "Pipelined Collective I/O". In the first scheme, all processors participate in the I/O simultaneously, making scheduling of I/O requests simpler but creating a possibility of contention at the I/O nodes. In the second approach, processors are grouped into several groups, so that only one group performs I/O simultaneously, while the next group performs communication to rearrange data, and this entire process is pipelined to reduce I/O node contention dynamically. In other words, the design provides support for dynamic contention management. Then we present a software caching method using collective I/O to reduce I/O cost by reusing data already present in the memory of other nodes. Finally, chunking and on-line compression mechanisms are included in both models. We demonstrate that we can obtain significantly high-performance for I/O above what has been possible so far. The performance results are presented on an Intel Paragon and on the ASCI/Red teraflops machine. Application level I/O bandwidth up to 55% of the peak is observed.he peak is observed.

Comparison of Artificial Neural Network and Empirical Models to Determine Daily Reference Evapotranspiration (기준 일증발산량 산정을 위한 인공신경망 모델과 경험모델의 적용 및 비교)

  • Choi, Yonghun;Kim, Minyoung;O'Shaughnessy, Susan;Jeon, Jonggil;Kim, Youngjin;Song, Weon Jung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.6
    • /
    • pp.43-54
    • /
    • 2018
  • The accurate estimation of reference crop evapotranspiration ($ET_o$) is essential in irrigation water management to assess the time-dependent status of crop water use and irrigation scheduling. The importance of $ET_o$ has resulted in many direct and indirect methods to approximate its value and include pan evaporation, meteorological-based estimations, lysimetry, soil moisture depletion, and soil water balance equations. Artificial neural networks (ANNs) have been intensively implemented for process-based hydrologic modeling due to their superior performance using nonlinear modeling, pattern recognition, and classification. This study adapted two well-known ANN algorithms, Backpropagation neural network (BPNN) and Generalized regression neural network (GRNN), to evaluate their capability to accurately predict $ET_o$ using daily meteorological data. All data were obtained from two automated weather stations (Chupungryeong and Jangsu) located in the Yeongdong-gun (2002-2017) and Jangsu-gun (1988-2017), respectively. Daily $ET_o$ was calculated using the Penman-Monteith equation as the benchmark method. These calculated values of $ET_o$ and corresponding meteorological data were separated into training, validation and test datasets. The performance of each ANN algorithm was evaluated against $ET_o$ calculated from the benchmark method and multiple linear regression (MLR) model. The overall results showed that the BPNN algorithm performed best followed by the MLR and GRNN in a statistical sense and this could contribute to provide valuable information to farmers, water managers and policy makers for effective agricultural water governance.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

A Comparative Analysis on Generated Construction Waste Quantities in a Case Study for Deconstruction of an Apartment (공동주택의 분별해체 시험시공을 통한 건설폐기물 발생량 비교 분석)

  • Kim, Hyojin;Kang, Leenseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.63-70
    • /
    • 2014
  • Deconstruction of the building must be applied firstly in order to improve recycling and reuse of construction wastes. In this study have done a case study for deconstruction of an apartment. All construction waste(CW) which will be generated during deconstruction was examined in each part of the building. Because drawing did not exist in most of the old building, we drew up floor plans of buildings. After analyzing these drawings, estimated quantities of CW. It was measured working time of labor and equipments for deconstruction and general demolition on each building of the apartment. In addition, it was proposed in the volume and weight per unit after analyzing detailed measurement of CW which was generated in the process of deconstruction and traditional demolition. It suggested recovery rate at a site, volume and weight conversion factors, and waste basic unit per area that based on the results of comparative analysis on the amount of CW which is calculated from drawing and generated at a site. These factors will be used fundamental materials for estimating quantities and treatment cost of CW, and scheduling of works.