• 제목/요약/키워드: Process Piping System

검색결과 93건 처리시간 0.029초

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • 한국해양공학회지
    • /
    • 제34권3호
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

프로세스 배관계의 3차원 유동해석 (3-D Flow Simulation of Process Piping System)

  • 양희천;박상규
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집E
    • /
    • pp.469-473
    • /
    • 2001
  • It is very important that piping system shall meet the optimum design requirement as predicted in designing system. If the piping system proved not to meet the requirement in commission it shall be redesigned and corrected till the required capacity is satisfied. which costs much expense. The objective of this study is to understand steady 3-dimensional flow phenomena in a process piping system numerically. 3-dimensional numerical simulations with standard $k-{\epsilon}$ model were carried out by using ALGOR code for three cases of Reynolds number. 2500, 3500 and 4500, based on inlet pipe diameter and three cases of inflow air temperature, $20^{\circ}C,\;50^{\circ}C$ and $100^{\circ}C$.

  • PDF

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제7권2호
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

해양플랜트 배관재 공정관리 방법에 관한 연구 (A Study on Process Management Method of Offshore Plant Piping Material)

  • 박중구;우종훈
    • 대한조선학회논문집
    • /
    • 제55권2호
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

3D CAD 모델 기반 해양플랜트 배관 공정 모니터링 시스템 개발 (A Development of Offshore plant Piping Process Monitoring System Based on 3D CAD Model)

  • 김현철;이규홍
    • 한국산학기술학회논문지
    • /
    • 제21권2호
    • /
    • pp.58-65
    • /
    • 2020
  • 3D CAD 시스템으로 설계된 해양플랜트 배관재 모델들은 2D 배관 제작도와 설치도의 형태로 생산 공정에 제공되고, 기본 엔지니어링 정보와 함께 통합 공정관리시스템에서 원자재의 구매, 조달, 제작, 설치 및 검사가 체계적으로 관리되어 진행된다. 기존의 통합 공정관리시스템은 자원의 흐름 및 진행 상황을 체계적으로 관리하여 공정 시수 절감에 많은 기여를 하고 있지만, 3D 설계 형상 모델 정보를 포함하고 있지 않기 때문에 배관 설치 작업 전에 복잡한 배관 구조를 파악하거나, 잦은 설계 변경으로 인해 연관된 도면을 찾을 때 상호간 신속한 정보 교류가 어려운 단점을 가지고 있었다. 이러한 문제점을 해결하기 위해 3D 모델을 기반으로 하는 해양플랜트 배관 공정 모니터링 시스템을 개발하였다. 본 시스템은 3D 모델 기반 배관 모니터링 시스템은 Visual Studio 2017 C#과 UNITY3D를 기반으로 배관 공정 작업 정보가 3D CAD 모델과 실시간 연동될 수 있도록 구성하였다. 그리고 블록, 크기, 재료에 따른 배관 설치 공정 진행 흐름 뿐만 아니라, 청소, 수압검사, 공압검사 등 기능 검사 항목별 진행 흐름을 3D 모델상에서 실시간으로 확인할 수 있도록 하였다. 작업자는 개발된 시스템을 통해 생산 현장에서 실시간으로 배관 공정 진행 흐름을 포함한 3D CAD 모델을 쉽게 파악함으로써 작업 효율성 향상에 많은 기여를 할 것으로 기대된다.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

공정플랜트 연료배관의 시스템응력 해석에 의한 구조 건전성 평가 (Structural Integrity Evaluation by System Stress Analysis for Fuel Piping in a Process Plant)

  • 정성용;윤기봉;팜반듀엣;유종민;김지윤
    • 한국안전학회지
    • /
    • 제28권3호
    • /
    • pp.44-50
    • /
    • 2013
  • Process gas piping is one of the most basic components frequently used in the refinery and petrochemical plants. Many kinds of by-product gas have been used as fuel in the process plants. In some plants, natural gas is additionally introduced and mixed with the byproduct gas for upgrading the fuel. In this case, safety or design margin of the changed piping system of the plant should be re-evaluated based on a proper design code such as ASME or API codes since internal pressure, temperature and gas compositions are different from the original plant design conditions. In this study, series of piping stress analysis were conducted for a process piping used for transporting the mixed gas of the by-product gas and the natural gas from a mixing drum to a knock-out drum in a refinery plant. The analysed piping section had been actually installed in a domestic industry and needed safety audit since the design condition was changed. Pipe locations of the maximum system stress and displacement were determined, which can be candidate inspection and safety monitoring points during the upcoming operation period. For studying the effects of outside air temperature to safety the additional stress analysis were conducted for various temperatures in $0{\sim}30^{\circ}C$. Effects of the friction coefficient between the pipe and support were also investigated showing a proper choice if the friction coefficient is important. The maximum system stresses were occurred mainly at elbow, tee and support locations, which shows the thermal load contributes considerably to the system stress rather than the internal pressure or the gravity loads.

원자로냉각재계통 소구경 관통관 용접부 부분노즐교체 예방정비를 위한 최적 용접공정에 관한 연구 (Study on Optimal Welding Processes of Half Nozzle Repair on Small Bore Piping Welds in Reactor Coolant System)

  • 김영주;정광운;최광민;최동철;조상범;조홍석
    • 한국압력기기공학회 논문집
    • /
    • 제14권1호
    • /
    • pp.58-65
    • /
    • 2018
  • The purpose of this study is to develop a Half Nozzle Repair(HNR) process to prevent the leakage from welds on small bore piping in Reactor Coolant System. The Codes & Standards of tempered bead and design requirements of J-Groove welds are reviewed. Automatic machine GTAW welding and machining equipments are developed to perform HNR process. Single pass welding and overlay welding equipments are conducted in order to obtain the optimal temper bead welding process parameters with Alloy 52M filler wire. Coarse grain heat affected zone(CGHAZ) is formed by rapid cooling rate in heat affected zone after welding. Accordingly, a proper temper bead technique is required to reduce CGHAZ in 1-Layer of welds by 2- and 3-Layers. Mock-up tests show that the developed HNR process is possible to meet ASME Code & Standard requirements without any defect.

배관계에서 열팽창을 고려한 열팽창매출변 및 주변설비의 설계와 설치에 관한 고찰 (The Review of Design and Installation of the Thermal Relief Valve with It's Surrounding Facility in a Chemical Plant Piping System)

  • 차순철;김영배
    • 기술사
    • /
    • 제30권3호
    • /
    • pp.104-114
    • /
    • 1997
  • Throughout the practical process engineering design and commissioning 8E startup experiences focused on chemical process safety, the review of design and installation of the thermal relief valve with its surrounding facility in a chemical plant piping system is made to help the better understanding of the piping system of characteristics of thermal relief valve which Is consisting of theoretical approach, correlation in terms of temperature and pressure increase caused by external heat supply in a piping system, consideration of thermal relief valve design, pressure relieving system of serial thermal relief valves and exception of their installation. It is earnestly recommended that following topic should be implemented during thermal relief valve design, installation and normal operation as well.

  • PDF

프로세스 마이닝 기법을 이용한 해양플랜트 배관재 제작 공정 관리 방법에 관한 연구 (A Study on Process Management Method of Offshore Plant Piping Material using Process Mining Technique)

  • 박중구;김민규;우종훈
    • 대한조선학회논문집
    • /
    • 제56권2호
    • /
    • pp.143-151
    • /
    • 2019
  • This study describes a method for analyzing log data generated in a process using process mining techniques. A system for collecting and analyzing a large amount of log data generated in the process of manufacturing an offshore plant piping material was constructed. The analyzed data was visualized through various methods. Through the analysis of the process model, it was evaluated whether the process performance was correctly input. Through the pattern analysis of the log data, it is possible to check beforehand whether the problem process occurred. In addition, we analyzed the process performance data of partner companies and identified the load of their processes. These data can be used as reference data for pipe production allocation. Real-time decision-making is required to cope with the various variances that arise in offshore plant production. To do this, we have built a system that can analyze the log data of real - time system and make decisions.