• 제목/요약/키워드: Probabilistic Risk Assessment

검색결과 302건 처리시간 0.023초

Development of an Accident Sequence Precursor Methodology and its Application to Significant Accident Precursors

  • Jang, Seunghyun;Park, Sunghyun;Jae, Moosung
    • Nuclear Engineering and Technology
    • /
    • 제49권2호
    • /
    • pp.313-326
    • /
    • 2017
  • The systematic management of plant risk is crucial for enhancing the safety of nuclear power plants and for designing new nuclear power plants. Accident sequence precursor (ASP) analysis may be able to provide risk significance of operational experience by using probabilistic risk assessment to evaluate an operational event quantitatively in terms of its impact on core damage. In this study, an ASP methodology for two operation mode, full power and low power/shutdown operation, has been developed and applied to significant accident precursors that may occur during the operation of nuclear power plants. Two operational events, loss of feedwater and steam generator tube rupture, are identified as ASPs. Therefore, the ASP methodology developed in this study may contribute to identifying plant risk significance as well as to enhancing the safety of nuclear power plants by applying this methodology systematically.

건설공사의 확률적 위험도분석 시스템 모형 및 해석방법 (Probabilistic Risk Assessment System Model and Methods for Construction Projects)

  • 조효남;최현호;김윤배
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.3-10
    • /
    • 1999
  • This paper presents probabilistic risk assessment system model and methods for general construction projects and demonstrates the applicability of the approach to a specific subway construction project. The proposed system model entitled Integrated Risk Assessment System(IRAS) for construction projects is composed of four steps, which is newly reorganized and improved in order to be easily adjusted for a systematic PRA of construction projects. Based on the proposed model, and integrated prototype software is then developing for computer-aided PRA of construction projects under the environment of the graphic-user interface, which will be successfully applied to construction projects.

  • PDF

PRA: A PERSPECTIVE ON STRENGTHS, CURRENT LIMITATIONS, AND POSSIBLE IMPROVEMENTS

  • Mosleh, Ali
    • Nuclear Engineering and Technology
    • /
    • 제46권1호
    • /
    • pp.1-10
    • /
    • 2014
  • Probabilistic risk assessment (PRA) has been used in various technological fields to assist regulatory agencies, managerial decision makers, and systems designers in assessing and mitigating the risks inherent in these complex arrangements. Has PRA delivered on its promise? How do we gage PRA performance? Are our expectations about value of PRA realistic? Are there disparities between what we get and what we think we are getting form PRA and its various derivatives? Do current PRAs reflect the knowledge gained from actual events? How do we address potential gaps? These are some of the questions that have been raised over the years since the inception of the field more than forty years ago. This paper offers a brief assessment of PRA as a technical discipline in theory and practice, its key strengths and weaknesses, and suggestions on ways to address real and perceived shortcomings.

A dynamic reliability approach to seismic vulnerability analysis of earth dams

  • Hu, Hongqiang;Huang, Yu
    • Geomechanics and Engineering
    • /
    • 제18권6호
    • /
    • pp.661-668
    • /
    • 2019
  • Seismic vulnerability assessment is a useful tool for rational safety analysis and planning of large and complex structural systems; it can deal with the effects of uncertainties on the performance of significant structural systems. In this study, an efficient dynamic reliability approach, probability density evolution methodology (PDEM), is proposed for seismic vulnerability analysis of earth dams. The PDEM provides the failure probability of different limit states for various levels of ground motion intensity as well as the mean value, standard deviation and probability density function of the performance metric of the earth dam. Combining the seismic reliability with three different performance levels related to the displacement of the earth dam, the seismic fragility curves are constructed without them being limited to a specific functional form. Furthermore, considering the seismic fragility analysis is a significant procedure in the seismic probabilistic risk assessment of structures, the seismic vulnerability results obtained by the dynamic reliability approach are combined with the results of probabilistic seismic hazard and seismic loss analysis to present and address the PDEM-based seismic probabilistic risk assessment framework by a simulated case study of an earth dam.

Direct fault-tree modeling of human failure event dependency in probabilistic safety assessment

  • Ji Suk Kim;Sang Hoon Han;Man Cheol Kim
    • Nuclear Engineering and Technology
    • /
    • 제55권1호
    • /
    • pp.119-130
    • /
    • 2023
  • Among the various elements of probabilistic safety assessment (PSA), human failure events (HFEs) and their dependencies are major contributors to the quantification of risk of a nuclear power plant. Currently, the dependency among HFEs is reflected using a post-processing method in PSA, wherein several drawbacks, such as limited propagation of minimal cutsets through the fault tree and improper truncation of minimal cutsets exist. In this paper, we propose a method to model the HFE dependency directly in a fault tree using the if-then-else logic. The proposed method proved to be equivalent to the conventional post-processing method while addressing the drawbacks of the latter. We also developed a software tool to facilitate the implementation of the proposed method considering the need for modeling the dependency between multiple HFEs. We applied the proposed method to a specific case to demonstrate the drawbacks of the conventional post-processing method and the advantages of the proposed method. When applied appropriately under specific conditions, the direct fault-tree modeling of HFE dependency enhances the accuracy of the risk quantification and facilitates the analysis of minimal cutsets.

Seismic Scenario Simulation and Its Applications on Risk Management in Taiwan

  • Yeh, Chin-Hsun
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2009년도 정기 학술발표대회
    • /
    • pp.13-24
    • /
    • 2009
  • This paper introduces various kinds of applications of the scenario-based seismic risk assessment in Taiwan. Seismic scenario simulation (SSS) is a GIS-based technique to assess distribution of ground shaking intensity, soil liquefaction probability, building damages and associated casualties, interruption of lifeline systems, economic losses, etc. given source parameters of an earthquake. The SSS may integrate with rapid earthquake information release system to obtain valuable information and to assist in decision-making processes to dispatch rescue and medical resources efficiently. The SSS may also integrate with probabilistic seismic hazard analysis to evaluate various kinds of risk estimates, such as average annual loss and probable maximum loss in one event, in a probabilistic sense and to help proposing feasible countermeasures.

  • PDF

Development of a regulatory framework for risk-informed decision making

  • Jang, Dong Ju;Shim, Hyung Jin
    • Nuclear Engineering and Technology
    • /
    • 제52권1호
    • /
    • pp.69-77
    • /
    • 2020
  • After the Fukushima Daiichi accidents, public concerns on nuclear safety and the corresponding burden of nuclear power plant licensees are increasing. In order to secure public trust and enhance the rationality of current safety regulation, we develop a risk-informed decision making (RIDM) framework for the Korean regulatory body. By analyzing all the regulatory activities for nuclear power plants in Korea, eight action items are selected for RIDM implementation, with appropriate procedures developed for each. For two items in particular - the accident sequence precursor analysis (ASPA) and the significance determination process (SDP) - two customized risk evaluation software has been developed for field inspectors and probabilistic safety assessment experts, respectively. The effectiveness of the proposed RIDM framework is demonstrated by applying the ASPA procedure to 35 unplanned scrams and the SDP to 24 findings from periodic inspections.

위험도평가에 기초한 예방유지관리 계획 - 부산지하철 반송선의 설계 예 - (Development of Preventive Maintenance Plan based on PRA - Case Study of Pansong-Line Railway in Pusan -)

  • 김재원;최영민;김대성;김교훈;박향우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.482-487
    • /
    • 2005
  • In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.

  • PDF

Probabilistic Safety Assessment of Nuclear Power Plants Using Bayes Method

  • Shim, Kyu-Bark
    • Communications for Statistical Applications and Methods
    • /
    • 제8권2호
    • /
    • pp.453-464
    • /
    • 2001
  • A commercial nuclear power station contains at least tow emergency diesel generators(EDG) to control the risk of severe core damage during station blackout accidents. Therefore, the reliability of the EDG's to start and load-run on demand must be maintained at a sufficiently high level. Probabilistic safety assessments(PSA) are increasingly being used to quantify the public risk of operating potentially hazardous systems such as nuclear power reactors. In this paper, to perform PSA, we will introduce three different types of data and use Bayes procedure to estimate the error rate of nuclear power plant EDG, and using practical examples, illustrate which method is more reasonable in our situation.

  • PDF

확률론적 지진위험도 분석을 위한 원전 격납건물의 비탄성에너지 흡수계수 평가 (Inelastic Energy Absorption Factor for the Seismic Probabilistic Risk Assessment of NPP Containment Structure)

  • 최인길;서정문
    • 한국지진공학회논문집
    • /
    • 제5권5호
    • /
    • pp.47-56
    • /
    • 2001
  • 원전 격납건물은 내진 안정성을 확보하기 위해 설계단계에서 여유나 보수성을 부여하게 된다. 원전 구조물의 내진성능 평가는 이러한 여유나 보수성을 배제한 실질적인 성능 및 응답을 기준으로 평가하게 된다. 본 연구에서는 내진성능 평가에 고려되는 구조물의 성능 및 응답관련 계수들 중 그 기여도가 비교적 큰 비탄성 에너지 흡수계수의 산정방법에 대한 비교를 수행하였다. 또한 각종 방법에 따라 산정된 비탄성 에너지 흡수계수에 따른 HCLPF(high confidence of low probability of failure)값의 변화를 분석하였다. 연구결과 원전 격납건물의 비탄성 에너지 흡수계수는 1.5~1.75로 나타났다. 구조물의 내진성능을 명확히 평가하기 위해서는 먼저 구조물의 비선형 거동 및 연성도를 정확히 평가하여야 함을 알 수 있다.

  • PDF