The 2th International Conference on Construction Engineering and Project Management
/
pp.729-738
/
2007
The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.
Patrick T.I. Lam ;Albert P. C. Chan ; Akintola Akintoye ;Arshad Ali Javed
국제학술발표논문집
/
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.389-394
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
This paper analyzes the profitability of the Private Finance Initiative(PFI) ports and proposes the application plans of the R-project(Rehabilitate project) for old ports to attract and activate private investment in the port industry. The R-project of old ports can reduce the government's financial budget and provide improved facilities for users more quickly than the public sector comparator. Before suggesting the R-project for old ports, the profitability of the currently operating 11 companies of the PFI ports are analyzed using the four ratios of profitability, and the results show that all the companies indicate low profitability, except for the top three companies. To apply the R-project, the three types of R-project ports are categorized as maintaining the function of the port, changing the function of the port, and mixing the function of the port. Additionally, three obstacles and improvement measures are suggested; attracting private business, legal issues, and administrative procedures. This study is conducive to the policy making for the port renewal and the activating PFI for the port industry.
Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
Journal of Construction Engineering and Project Management
/
제1권2호
/
pp.43-48
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
민간투자사업은 민간의 참여를 통해 사회기반시설을 효율적으로 확충하기 위하여 시행되고 있다. 2005년도부터는 기존의 도로, 항만 등을 비롯한 산업기반시설 뿐만 아니라 학교시설, 환경시설 등을 포함한 생활기반시설까지 그 범위가 확대되게 되었다. 따라서 사업의 추진방식도 기존에는 BTO 방식이 주로 이용되었지만 새로이 추가된 민간투자사업에서는 BTL 방식이 도입되게 되었다. BTL 방식은 민간투자 적합 여부를 판단하기 위하여 민간투자 적격성 조사를 실시하며 이는 정량적 VFM과 정성적 VFM으로 구분된다. 본 연구에서는 명확한 결과 도출이 어려운 정성적 VFM의 평가항목을 설정하고 전문가를 대상으로 설문조사를 실시한 후 AHP 기법을 활용하여 상대적 중요도와 가중치를 산정하였다. 이상의 내용은 정량적 VFM과 더불어 정성적 측면의 효율성 및 발생편익을 효과적으로 평가 가능하게 함으로써 BTL 시행여부에 대한 합리적 의사결정을 지원할 것으로 판단된다.
The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
/
pp.153-158
/
2017
Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.
The 10th International Conference on Construction Engineering and Project Management
/
pp.1278-1278
/
2024
Private Finance Initiative (PFI) involves long-term contracts where private entities invest in the construction and maintenance of street lighting facilities. The current implementation of PFI Smart Street Lighting Systems faces challenges in the fulfillment process, including discrepancies in quantities, coordination of power variations, delays in the deployment of smart systems, and issues with performance indicator scoring. These challenges disrupt the smooth execution of contractual obligations. Nevertheless, the adoption of intelligent systems in street lighting presents significant advantages in reducing energy consumption, extending the lifespan of fixtures, and enhancing maintenance efficiency. This study aims to analyze an ongoing project, applying the Fuzzy Analytic Hierarchy Process (FAHP) to identify crucial PFI indicators and their weights. The study explores areas of improvement in the project compared to traditional street lighting, aiming to provide solutions to the mentioned challenges. The results indicate that indicators such as PS3 (Lighting Service Continuity) with a weight of 0.384% and PS4 (Smooth Operation of the Smart Street Lightings Management System) with a weight of 0.274% have the highest impact on service performance. Additionally, the project involves replacing 162,000 streetlights, resulting in a yearly energy consumption reduction of approximately 70%, a decrease in monthly maintenance time from an average of 48 hours to 15 hours, and an expected reduction of 900,000 tons in carbon emissions during the project period. Value for Money (VfM) analysis suggests an annual reduction in government expenditures of NTD 66 million. This reveals that implementing PFI model is more advantageous than traditional street lighting procurement, as it allows the government to leverage contractor financing and alleviate the initial high costs of streetlight replacement, thereby reducing the overall costs of streetlight establishment and maintenance.
오늘날 국가는 사회안전유지 활동의 효율과 효과를 도모하기 위해서 "전문화", "고도화", "선택과 집중"에 형사정책의 초점을 맞추게 되는데, 이로써 국가의 활동영역의 축소가 필연적으로 수반된다. 이에 따라 축소된 국가의 활동영역을 보완해야할 대체 역할자가 필요하게 되고, 대체 역할자의 중요성이 점점 더 부각되고 있다. 이러한 대체 역할자의 하나로 Private Security(이하 PS)가 있다. PS는 비공적인 조직 또는 개인이 종래에 공적기관에 독점되어 온 사회의 안전확보와 범죄예방 역할을 대체 담당하는 것이다. 우리나라에서는 민간경비업이 이에 해당한다. 우리나라를 포함한 많은 선진국에서 PS가 범죄예방에 큰 역할을 담당해 왔고 그 비중도 높아지고 있다. 세계적으로도 "공(公)"에서 "사(私)"로, "관(官)"에서 "민(民)"으로 시큐리티 밸런스가 점점 전환되어 가고 있다. 위 현상을 가장 잘 보여주고 있는 사례로서 일본 PFI(Private Finance Initiative)교도소에 있어서의 PS의 역할을 들 수 있다. PFI교도소는 시설운영의 효율성 진작을 위해 민간의 노하우를 적극 활용함과 동시에 형벌권에 뒤따르는 행정책임을 국가가 보장하는 등의 철저한 "관민협동" 방식으로 운영되고 있다. 특히 키츠렌가와 센터와 하리마 센터는 관민협동방식 PFI교도소의 실효성을 높이기 위하여 민간사업자 선정평가기준으로 위험부담과 관계된 제안, 지역과의 공생, 보안사고의 방지 및 사고발생시의 대응, 기존교도소의 운영업무 등의 항목이 중요시 된다. 이러한 사례는, 우리나라의 향후 PS의 역할 모색에 있어 그 시사하는 바가 매우 크다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.