• Title/Summary/Keyword: Priority of risk

Search Result 494, Processing Time 0.032 seconds

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

Risk-based approach to develop a national residue program: prioritizing the residue control of veterinary drugs in fishery products

  • Kang, Hui-Seung;Han, Songyi;Cho, Byung-Hoon;Lee, Hunjoo
    • Fisheries and Aquatic Sciences
    • /
    • v.22 no.12
    • /
    • pp.29.1-29.7
    • /
    • 2019
  • Veterinary drugs are widely used to protect production-related diseases and promote the growth of farmed fish. The use of large amounts of veterinary drugs may have potential risk and cause adverse effects on both humans and the environment. In this study, we developed risk-based ranking based on a scoring system to be applied in the national residue program. In this approach, the following three factors of veterinary drugs that may occur as residues in fishery products were considered: potency (acceptable daily intake), usage (number of dose and withdrawal period), and residue occurrence. The overall ranking score was calculated using the following equation: potency × usage (sum of the number of sales and withdrawal period) × residue occurrence. The veterinary drugs that were assigned high score by applying this approach were enrofloxacin, amoxicillin, oxolinic acid, erythromycin, and trimethoprim. The risk-based approach for monitoring veterinary drugs can provide a reliable inspection priority in fishery products. The developed ranking system can be applied in web-based systems and residuemonitoring programs and to ensure safe management of fishery products in Korea.

Risk-based Priority Ranking for Air Pollution Problems in Seoul (서울 지역에서 인체 위해도에 입각한 대기오염물질의 관리 우선 순위 선정에 관한 연구)

  • 김예신;박화성;이용진;임영욱;신동천
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.19 no.2
    • /
    • pp.205-216
    • /
    • 2003
  • We have gathered exposure data on ambient air quality level and investigated dose-response slope factors of air pollutants such as fine particle, HAPs (metals, VOCs, PAHs) and dioxins in Seoul. Theoretical mortality incidences were estimated from exposure to these pollutants. From the results, priorities were ranked in the order fine particle, metals, VOCs, dioxins and PAHs by ordinal scale, and the uncertainties relative to those risk estimates were described.

Investment Prioritization Method for Steep Slope Retaining Wall Considering the Disaster Risk and the Repair and Reinforcement Cost (재해위험도와 보수보강비용을 고려한 급경사지 옹벽의 투자 우선순위 결정방법 연구)

  • Choi, Jae-Soon;Shin, Yean-Ju;Baek, Woo-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.12
    • /
    • pp.79-89
    • /
    • 2022
  • Every summer in our country, an accident occurs, in which the retaining wall on a steep slope collapses due to torrential rain. According to the data on the results of steep slope risk assessment in 2019, over 780 retaining walls are below grade C; therefore, preparing for countermeasures is urgent. However, due to the limited budget for the repair and reinforcement of these retaining walls, it is necessary to discuss the investment prioritization. In this study, a prioritization method was proposed at the network and project levels along with the review of the revised criteria of disaster risk assessment in the steep slope retaining wall, and an application research in the network level was conducted for six retaining walls. Moreover, it is proposed that the priority index was determined by using the actual cost for repair and reinforcement in determination of the project level prioritization.

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

Priority Setting for the Healthy City Program in Busan Using the Analytic Hierarchy Process (계층 분석법을 적용한 부산시 건강도시 사업의 우선순위 설정)

  • Yoon, Tae-Ho;Choi, Min-Hyeok;Cheong, Kyu-Seok;Kim, Yun-Hee;Kim, Keon-Yeop;Jung, Baek-Geun
    • Korean Journal of Health Education and Promotion
    • /
    • v.28 no.3
    • /
    • pp.31-42
    • /
    • 2011
  • Objectives: Busan had the highest mortality and the shortest life expectancy at birth among 16 provinces in Korea in 2008 and there were considerable health inequalities within the region. This study was performed to build up a priority setting framework in Healthy City Busan project. Methods: Analytic hierarchy process was used to determine the relative priority weight for different strategic and program dimensions along with the consistency of response. An on-site workshop-based meeting (calculating importance) and online survey (calculating risk) were conducted to obtain data from 8 experts. Results: The results showed that in strategic criteria "active health promotion & diseases prevention" and "building infrastructure for the Health City project" were two most important factors. In program criteria, considering both importance and risk scores, "making a healthy community" and "building community health centers" in disadvantaged areas were a top priority group. In addition, "enacting an ordinance for the Healthy City", "building the infrastructure for health impact assessment" and "making health care safety net for vulnerable population" were also higher priorities group. Conclusions: Our findings suggest that the Healthy City project in Busan should be focused on strengthening health equity and building infrastructure for sustainability of the project.

Development of Priority Evaluation Framework for IT System Consolidation using Global Single Instance in Hightech Industry (하이테크 분양의 GSI 구현 대상 우선순위 평가 방법 및 적용 방안 연구)

  • Lee, Chi-Hun;Chang, Min-Yong;Seo, Jong-Hyen
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.175-182
    • /
    • 2009
  • The effort for GSI based IT system consolidation has been continued due to the increase of the system and complication increase of system connection, mainly by the global company. Since successful example of GSI realization by part of developed company affect to Korea, global level IT system consolidation has been examined mainly by the domestic company that have great deal of overseas business. Although they have examined consolidation possibility mainly on R&D, finance, operation management part which is the base part of company management, there are limitation for consolidation realization because of the difference between regional business problem of huge cost needed for consolidation. To overcome these realization limitations, it is necessary to lead risk and cost reduction through stepwise part unity and decide Priority Evaluation Framework for Consolidation target and systematic consolidation strategy. For GSI realization, appropriate distributions of unification time according to target system are needed. In this study, based on easiness and usefulness of consolidation and connection between the targets, evaluation methodology for Priority Evaluation Framework of system consolidation has been developed. Priority Evaluation Framework has been decided by applying developed methodology to global production company of high tech industrial part. Through this methodology, companies can realize successful and stable GSI by investing global resources intensively by Priority Evaluation Framework of consolidation target system.

Estimation for Failure Rate of Railway Power Facility and Determination of Maintenance Priority Order using Fuzzy Theory and Expert System (퍼지이론과 전문가 시스템을 이용한 철도 전력 설비의 고장률 평가와 유지보수 우선순위의 결정)

  • Lee, Yun-Seong;Kwon, Ki-Ryang;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.495-504
    • /
    • 2009
  • As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.

  • PDF

Seismic risk priority classification of reinforced concrete buildings based on a predictive model

  • Isil Sanri Karapinar;Ayse E. Ozsoy Ozbay;Emin Ciftci
    • Structural Engineering and Mechanics
    • /
    • v.91 no.3
    • /
    • pp.279-289
    • /
    • 2024
  • The purpose of this study is to represent a useful alternative for the preliminary seismic vulnerability assessment of existing reinforced concrete buildings by introducing a statistical approach employing the binary logistic regression technique. Two different predictive statistical models, namely full and reduced models, were generated utilizing building characteristics obtained from the damage database compiled after 1999 Düzce earthquake. Among the inspected building parameters, number of stories, overhang ratio, priority index, soft story index, normalized redundancy ratio and normalized lateral stiffness index were specifically selected as the predictor variables for vulnerability classification. As a result, normalized redundancy ratio and soft story index were identified as the most significant predictors affecting seismic vulnerability in terms of life safety performance level. In conclusion, it is revealed that both models are capable of classifying the set of buildings being severely damaged or collapsed with a balanced accuracy of 73%, hence, both are able to filter out high-priority buildings for life safety performance assessment. Thus, in this study, having the same high accuracy as the full model, the reduced model using fewer predictors is proposed as a simple and viable classifier for determining life safety levels of reinforced concrete buildings in the preliminary seismic risk assessment.

Simulation of Traffic Signal Control with Adaptive Priority Order through Object Extraction in Images (영상에서 객체 추출을 통한 적응형 통행 우선순위 교통신호 제어 시뮬레이션)

  • Youn, Jae-Hong;Ji, Yoo-Kang
    • Journal of Korea Multimedia Society
    • /
    • v.11 no.8
    • /
    • pp.1051-1058
    • /
    • 2008
  • The advancement of technology for image processing and communications makes it possible for current traffic signal controllers and vehicle detection technology to make both emergency vehicle preemption and transit priority strategies as a part of integrated system. Present]y traffic signal control in crosswalk is controlled by fixed signals. The signal control keeps regular signals traffic even with no traffic, when there is traffic, should wait until the signal is given. Waiting time causes the risk of traffic accidents and traffic congestion in accordance with signal violation. To help reduce the risk of accidents and congestion, this paper explains traffic signal control system for the adaptive priority order so that signal may be preferentially given in accordance with the situation of site through the object detect images.

  • PDF