• Title/Summary/Keyword: Priority determination of project level

Search Result 1, Processing Time 0.015 seconds

Investment Prioritization Method for Steep Slope Retaining Wall Considering the Disaster Risk and the Repair and Reinforcement Cost (재해위험도와 보수보강비용을 고려한 급경사지 옹벽의 투자 우선순위 결정방법 연구)

  • Choi, Jae-Soon;Shin, Yean-Ju;Baek, Woo-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.12
    • /
    • pp.79-89
    • /
    • 2022
  • Every summer in our country, an accident occurs, in which the retaining wall on a steep slope collapses due to torrential rain. According to the data on the results of steep slope risk assessment in 2019, over 780 retaining walls are below grade C; therefore, preparing for countermeasures is urgent. However, due to the limited budget for the repair and reinforcement of these retaining walls, it is necessary to discuss the investment prioritization. In this study, a prioritization method was proposed at the network and project levels along with the review of the revised criteria of disaster risk assessment in the steep slope retaining wall, and an application research in the network level was conducted for six retaining walls. Moreover, it is proposed that the priority index was determined by using the actual cost for repair and reinforcement in determination of the project level prioritization.