The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.5
no.4
/
pp.211-215
/
2012
Surgery equipment in operating room is very important at treatment procedure of patients. In this circuit of large equipment, a sudden change of current make big problem such as short circuit. when the current is converted suddenly, the current converter becomes in saturate and it caused by the induction curve of the inductor. in this case, the rates of the primary and secondary winding are broken and it becomes a open circuit. in this paper, we will look around the current transform of the primary and secondary winding when current converter becomes in saturate.
The property of circuit symmetry has long been applied to the Problem of minimizing the area and timing of multi-level logic circuits. In this paper, we focus on another important design objective, power minimization, utilizing circuit symmetries. First, we analyze and establish the relationship between several types of circuit symmetry and their applicability to reducing power consumption of the circuit, proposing a set of re-synthesis techniques utilizing the symmetries. We derive an algorithm for detecting the symmetries (among the internal signals as well as the primary inputs) on a given circuit implementation. We then propose effective transformation algorithms to minimize power consumption using the symmetry information detected from the circuit. Unlike many other approaches, our transformation algorithm guarantees monotonic improvement in terms of switching activities, which is practically useful in that user can check the intermediate re-synthesized designs in terms of the degree of changes of power, area, timing, and the circuit structure. We have carried out experiments on MCNC benchmark circuits to demonstrate the effectiveness of our algorithm. On average we reduced the power consumption of circuits by 12% with relatively little increase of area and timing.
The Transactions of the Korea Information Processing Society
/
v.6
no.8
/
pp.2204-2212
/
1999
In this paper, we present techniques which perform incremental timing analysis using Timed Boolean Algebra that solves the false path problem and extracts the timing information in combinational circuits. Our algorithm sets histories of internal inputs that are substituted for internal output and extracts maximal delays through checking sensitizability of primary outputs. Once finding the sum of primitive delay terms, then it applies modified delay with referencing histories of primary output and it can extract maximal delays of primary outputs fast and efficiently. When the structure of circuit is changed, there is no need to compute the whole circuit again. We can process partial timing analysis of computing on the gates that are need to compute again. These incremental timing analysis methods are considered both delay changes and structure of circuit, and can reduce the costs of a trial error in the circuit design.
The Transactions of the Korean Institute of Power Electronics
/
v.21
no.3
/
pp.224-230
/
2016
In this study, a single-power-conversion series-resonant ac-dc converter with high efficiency and high power factor is proposed. The proposed ac-dc converter consists of single-ended primary-inductor converter with an active-clamp circuit and a voltage doubler with series-resonant circuit. The active-clamp circuit clamps the surge voltage and provides zero-voltage switching of the main switch. The series-resonant circuit consists of leakage inductance $L_{lk}$ of the transformer and resonant capacitors $ C_{r1}$ and $ C_{r2}$. This circuit also provides zero-current switching of output diodes $D_1$ and $D_2$. Thus, the switching loss of switches and reverse-recovery loss of output diodes are considerably reduced. The proposed ac-dc converter also achieves high power factor using the proposed control algorithm without the addition of a power factor correction circuit and a dc-link electrolytic capacitor. A detailed theoretical analysis and the experimental results for a 1kW prototype are discussed.
The Transactions of the Korean Institute of Power Electronics
/
v.24
no.6
/
pp.406-410
/
2019
Three-level (3L) DC-DC converters are appropriate for high-input-voltage applications. Although the voltage stress of TL converter switches can be reduced to half of the input voltage, the primary side has a large circulating current, which degrades efficiency. In this study, a dual half-bridge cascaded TL converter is presented to reduce this circulating current and thus decrease the conduction loss of the primary circuit. Moreover, the proposed converter can reduce the voltage stress of rectifier diodes, thereby reducing their conduction loss. Therefore, efficiency can be improved by reducing the conduction loss of the primary circuit and rectifier diodes.
This study is a middle report on the development of intelligent spot welding monitoring technology applicable to the production line. An intelligent algorithm has been developed to predict the quality of welding in real time. We examined whether it is effective or not through the In-Line and the Off-Line tests. The purpose of the present study is to provide a reliable solution which can prevent welding defects in production site. In this study, the process variables, which were monitored in the primary circuit of the welding, are used to estimate the weld quality by Hidden Markov Model(HMM). The primary dynamic resistance patterns are recognized and the quality is estimated in probability method during the welding. We expect that the algorithm proposed in the present study is feasible to the applied in the production sites for the purpose of in-process real time quality monitoring of spot welding.
This study is a middle report on the development of intelligent spot welding monitoring technology applicable to the production line. An intelligent algorithm has been developed to predict the quality of welding in real time. We examined whether it is effective or not through the In-Line and the Off-Line tests. The purpose of the present study is to provide a reliable solution which can prevent welding defects in production site. In this study, the process variables, which were monitored in the primary circuit of the welding, are used to estimate the weld quality by Hidden Markov Model(HMM). The primary dynamic resistance patterns are recognized and the quality is estimated in probability method during the welding. We expect that the algorithm proposed in the present study is feasible to the applied in the production sites for the purpose of in-process real time quality monitoring of spot welding.
Transactions on Electrical and Electronic Materials
/
v.1
no.3
/
pp.1-5
/
2000
This paper presents a new sort of multilayer piezoelectric ceramic transformer for switching regulation power supplies. This piezoelectric transformer operate in the second thickness resonant vibration mode. Accordingly its resonant frequency is higher than 1 NHz, Because output power is low if input and output part of transformer are consisted of single layer, this research suggests a new method, which is consisted of both input and output part of transformer have 2-layered piezoelectric ceramics, The size of transformer is 20 mm in width and length, and 1.4 mm in thickness, respectively, To design a high efficient switching circuit of the transformer, internal circuit parameters were measured and then weve calculated a parameter of inductor nd capacitor to design a driving circuit, Weve used a MISFET and its driver circuit modified a calp oscillator circuit as the primary switching circuit.
Kim, Sun-Koo;Kim, Seon-Ho;Kim, Won-Man;Roh, Chang-Il;Lee, Dong-Jun;Jung, Heung-Soo
Proceedings of the KIEE Conference
/
2007.07a
/
pp.915-916
/
2007
There are many equipments for the Short Circuit Test, for example Short Circuit Generator, Induction Motor, Sequence Timer, Exciter, CLR, Back Up Breaker, Making Switch and TRV etc. Especially Back up Breaker and Making Switch are very important equipments to test the short circuit test. A role of a Back up Breaker is to break high-voltage and high-current for short circuit test and a Making Switch should be operated always same speed/time and kept electrical-mechanical characteristics to make the voltage and current of short circuit test. This study introduces to the short circuit test also to kinds, principal movements and compare them of Back up Breaker and Making Switch.
The ratios of compliant branch circuit of leakage current and insulation resistance were 68.4% and 90.8%, respectively at the lamp load, 64.6% and 96.5% at the heat load, 86.7% and 88.9% at the power load. Limit of residual current of the zero phase secondary current value at the zero phase primary current was 100 A when rated primary current 400 A more than. The reason why the ratio of branch circuit of the leakage current was less than the ratio of compliant branch circuit of the insulation resistance might be that the leakage current includes the capacitive leakage current and the zero phase current.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.