• Title/Summary/Keyword: Prestressed concrete slab

Search Result 114, Processing Time 0.024 seconds

Development for Design Program of Prestressed Concrete Slab Bridge Using VBA(Visual Basic for Application) (VBA(Visual Basic for Application)을 이용한 프리스트레스트 콘크리트 슬래브 교량의 설계 프로그램 개발)

  • Huh, Young;Hwang, Seong-Hyun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.195-202
    • /
    • 2002
  • Generally, bridge designers must consider variable factors in design of bridge-structures. For this reason, it was difficult to make a design program till now. However, the rapid development of computers turns it into a possible one with considering complex factors and the advance of computer's language make us design programming. When we use the automatic design program including structural analysis(FEM), we can save the time and effort. Additionally, the automatic design program was generated to reduce the man' errors. Therefore, in this paper, the automatic design program of the Prestressed Concrete Slab Bridge was developed. This design program will support bridge designers with time that they can spend on a creative and efficient duty for development of design.

  • PDF

Construction Method and Control System of the Heat of Hydration for Inchon International Airport Elevated Road Way (인천국제공항 여객터미널 전면 고가 교량 공사 시공방법 및 수화열 대책)

  • 임채만;박명웅;조용기;조선규;김은겸
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.869-881
    • /
    • 1999
  • Inchon International Airport Elevated Road Way is located between the Passenger Terminal Building and Transportaion Center which are Inchon International Airport core construction projects. The deck of the bridge is consists of 5-span or 6-span continuous pre-stressed concrete slab. Steel form has been used to enhance the quality of texture on concrete slab. Steel form has been used to enhance the quality of texture on concrete surface, lower surface of deck slab with the two way arch has been manufactured by highly professional manner in order to get an beautiful exterior architectural looks. The prestressed concrete deck slab is mass concrete structures with a high-specified concrete strength and a varying section in the range of 0.95-2.8m thickness. Therefore high risks of thermal cracking occurrence by heat of hydration highly are expected. To resolve such problem, we adopted type 1 cement and pipe cooking method at construction site through mass concrete specimen test and 3-dimensional analysis. For Pipe cooling we used 25mm diameter stainless pipes with wrinkles. Cooling pipe with spacing 50-60cm has been installed. And continuous pipe cooling with cooling water of 15$^{\circ}C$ was conducted for 2days. In present 8 span of all 29 spans construction has been completed. No thermal cracking heat hydration has been observed yet.

  • PDF

Effect of Different Interfacial Shear Reinforcement Lengths and Types on Flexural Behavior of PC/PS-Half Slab (계면 전단 보강근 길이 및 형태 변화에 따른 PC/PS-Half Slab의 휨 거동)

  • 이차돈;이종민
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.131-138
    • /
    • 2001
  • Total number of seven experimental specimens of size 4.6m$\times$2.4m are designed in full scale with due considerations given to the constructability as well as economic applications. Each specimen is made with different shapes of trusses or hooks along the interfacial surface between precast panel and topping concrete to maintain appropriate shear resistance. Structural performances in terms of strength and ductility under flexural load are examined for each specimen with different types of interfacial shear resistance reinforcements. Experimentally obtained flexural strength are also compared with those of analytical predictions. Based on experimental and analytical studies, design equations are suggested for the developed precast prestressed concrete half-slab systems.

  • PDF

Cable layout design of two way prestressed concrete slabs using FEM

  • Khan, Ahmad Ali;Pathak, K.K.;Dindorkar, N.
    • Computers and Concrete
    • /
    • v.11 no.1
    • /
    • pp.75-91
    • /
    • 2013
  • In this paper, a new approach for cable layout design of pre-stressed concrete slabs is presented. To account the cable profile accurately, it is modelled by B-spline. Using the convex hull property of the B-spline, an efficient algorithm has been developed to obtain the cable layout for pre-stressed concrete slabs. For finite element computations, tendon and concrete are modelled by 3 noded bar and 20 noded brick elements respectively. The cable concrete interactions are precisely accounted using vector calculus formulae. Using the proposed technique a two way prestressed concrete slab has been successfully designed considering several design criteria.

Design Methodology of Gap Slab for Post-Tensioned Prestressed Concrete Pavement (포스트텐션 콘크리트 포장의 Gap Slab 설계 방안)

  • Park, Hee-Beom;Kim, Seong-Min;Shim, Jae-Soo
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • This study was conducted to develop the design methodology of gap slabs for the post-tensioned concrete pavement (PTCP). The gap slabs were considered as unbonded, half bonded, and bonded types. According to the types of the gap slabs, the curling stresses were investigated first under the environmental loads. The stresses due to the vehicle loads were analyzed considering both the single and tandem axles. The method to calculate the prestressing amount was suggested by comparing the combined stresses due to both loads and the allowable tensile stress of concrete. The prestressing amount for the unbonded type gap slab could be designed by considering only the gap slab; however, for the half bonded and bonded gap slabs, the whole PTCP slab should be analyzed to properly design the prestressing amount.

Development of a New Design Theory for Incrementally Prestressed Concrete Girder (프리스트레스를 단계적으로 도입하는 IPC 거더의 설계 이론 연구)

  • 한만엽;김진근;이차돈;박준범
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.4
    • /
    • pp.121-130
    • /
    • 2000
  • Current engineering practice in determining sectional dimensions of prestressed concrete (PSC) girders for bridges is primarily based on the code-specified allowable concrete stresses at different loading stages. It is customary that tendons and sectional dimensions are calibrated and tendon forces are applied at once at the initial stage to keep the subsequent stresses occurring at different loading stages within the allowable stresses. This traditional tensioning method, however, usually results in a too conservative sectional depth in view of ultimate capacity of a girder. A new design method which can realize the reduction of sectional depth of PSC girders is theoretically suggested in this study. Tendons are tensioned twice at different loading stages: the initial stage and the stage after fresh slab concrete is cast. It can be shown that according to this technique, sectional depth can be significantly reduced and larger span can be realized compared to traditional ones. Parametric studies are performed with due considerations given to its practical applications.

A Evaluation on Flexural Behavior for Hollow Core Slab of Fire Resistance section for Residence Building (주거용 내화단면 중공슬래브의 휨거동 평가)

  • Boo, Yoon-Seob;Bae, Kyu-Woong;Shin, Sang-Min
    • Journal of Korean Association for Spatial Structures
    • /
    • v.23 no.2
    • /
    • pp.61-68
    • /
    • 2023
  • A two-hour fire-resistance PC hollow slab for residential use was developed to secure structural and fire-resistance performance and to be applied to the general building and apartment housing markets. Compared to the existing hollow slab, in order to secure the same or better structural performance and economic feasibility by reducing the quantity, it was attempted to secure the fire resistance performance by reducing the concrete filling rate in the cross section and adjusting the thickness of the upper and lower flanges by optimizing the hollow shape in the cross section of the slab. For structural performance evaluation, experiments were performed on PC hollow slabs by varying the member thickness and the presence or absence of overlaid concrete, and all of the experimental results showed that the design strength was sufficiently exhibited and that stability during construction was possible. The developed synthetic PC hollow slab has secured fire resistance and residential performance so that it can be applied to all buildings, and it is intended to be immediately applied to the field.

Long-term Behavior of IPC Girder Bridge (IPC 거더 교량의 장기거동 해석)

  • 권승희;김진근;이상순;한만엽
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.107-112
    • /
    • 2001
  • The IPC(Incremental Prestressed Concrete) which is gradually introducing the tensile force by tendons has been recently developed for reducing the effective depth of PSC bridges. As well known, concrete experiences long-term deformation such as creep and drying shrinkage, and the prediction of the long-term behavior of concrete bridges is essential for both safety and serviceability aspects. This paper was analysed the long-term behavior of a continuous 2-span IPC girder bridge taking into consideration of creep, drying shrinkage and the time of tensile force introduction. As results, the shrinkage of slab concrete increases the negative moment at interior support, and the The difference of concrete ages between slab and girder increases the camber. The effect of initial tensile force is larger than the effect of secondary tensile force in the tendons.

  • PDF