Derivation of preliminary derived concentration guideline levels for surface soil at Kori Unit 1 by RESRAD probabilistic analysis

  • Byon, Jihyang;Park, Sangjune;Ahn, Seokyoung
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1289-1297
    • /
    • 2018
  • Preliminary surface soil Derived Concentration Guideline Levels (DCGLs) were derived conforming to the Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) procedure for the site release and reuse of Kori Unit 1 in Korea. Based on the decommissioning experiences of the U.S. nuclear power plants, a suite of residual radionuclides was determined, and uncertainties contributed to the resultant dose by the input parameters were quantified via the sensitivity analysis of parameters. The peak of the mean dose was obtained via the probabilistic analysis of the RESRAD (RESidual RADioactivity)-ONSITE code. Consequently, $DCGL_w$ of Kori Unit 1 in accordance with two scenarios, industrial worker and residential farmer scenario, were derived and the results were compared respectively with other NPPs. It could be used as a basic guideline for establishing regulatory standards for reuse planning, designing the site characterization surveys and implementing final status survey (FSS).

Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project (건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구)

  • Jung, Yong-Il;Lee, Chanwoo;Kang, Kyung-In;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

Preliminary Study on Market Risk Prediction Model for International Construction using Fractal Analysis

  • Moon, Seonghyeon;Kim, Du Yon;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.463-467
    • /
    • 2015
  • Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.