• Title/Summary/Keyword: Preliminary Plan

Search Result 377, Processing Time 0.022 seconds

Analysis of the Actual Condition of the Tree Doctor Qualification Test and Improvement of the System - Focus on the First Test - (나무의사 자격시험의 실태분석과 제도개선 방안 - 제1차 시험을 중심으로 -)

  • Yong Jo Jung;Hak Cheol Kim
    • Journal of Environmental Science International
    • /
    • v.32 no.1
    • /
    • pp.11-24
    • /
    • 2023
  • This study aimed to provide preliminary data for the improvement of the tree doctor qualification test (first written test), which was newly created by enforcing the Forest Protection Act on June 28, 2018., The high demand for system improvement accelerated this study. The results were analyzeds through literature and questionnaire surveys. Writing test questions and the license of the tree doctor qualification exam are currently managed by the Korea Forestry Research Institute, and it is deemed that the test should be entrusted to Human Resources Development Service of Korea for fair and transparent management. Additionally, the plan for the improvement of the subject-wise scope of examination questions writing, difficulty of test questions, and acceptance rate of the first test should be prepared after public hearings or seminars related to the examination questions.

BITSE Preliminary Result and Future Plan

  • Bong, Su-Chan;Yang, Heesu;Lee, Jae-Ok;Kwon, Ryun Young;Cho, Kyung-Suk;Kim, Yeon-Han;Reginald, Nelson L.;Yashiro, Seiji;Gong, Qian;Gopalswamy, Natchumuthuk;Newmark, Jeffrey S.
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.44 no.2
    • /
    • pp.58.2-58.2
    • /
    • 2019
  • BITSE is a technology demonstration mission to remotely measure the speed, temperature, and density of the solar wind as it forms as close as 3 Rs. BITSE obtained coronal images during its one day flight above more than 99% of the atmosphere, and calibration data are taken in the laboratory as well as during the flight. As the linearly polarized K-corona is much fainter than other bright sources like diffraction, sky, and F-corona, a careful data reduction is required to obtain reliable scientific results. We will report status of the obtained data, the reduction progress, and future plan.

  • PDF

Development of the Critical Pathway for Cesarean Section Patient (제왕절개술 환자를 위한 Critical Pathway 개발)

  • Chung Kyung-Hee;Jang Keum-Seung
    • The Journal of Korean Academic Society of Nursing Education
    • /
    • v.4 no.1
    • /
    • pp.66-80
    • /
    • 1998
  • With the opening of healthcare market, the health care environment in Korea is anticipating a drastic change. In this Internationally open market environment, it is necessary to introduce a systematic health care plan and DRG system which offer qualitative medical services as well as reduced cost. Purpose of this study is to develop and test the critical pathway for Cesarean section patient in the way to be possible the integrated inpatient management. It was adopted the process of six phases to develop the critical pathway as the theoretical framework implemented by Johns Hopkins Hospital, Maryland, U.S.A. In the first phase, make a selection of diagnosis/procedures to develop. In the second phase, organize a development team consisted of eight expertises working in maternity nursing area. In the third phase, analyze the overall medical service offered to patient through review medical records and decided the service content and the implementation period for the Cesarean section patient. In the forth phase, make out a preliminary critical pathway after verification of expert group on content validity. In the fifth phase, validity operate to ten Cesarean section patients to test implementation in practice by using the preliminary critical pathway, In the sixth phase, defined the final critical pathway. The result of this study was as follows. 1. There were classified 8 categories as monitoring/assesment, treatment, medication, activity, diet, test, consult, education/discharge plan for vertical axis and showed hospital stayed from admission to discharge for horizontal axis of critical pathway through analysis 68 Cesarean section patients medical records. 2. After critical review 68 medical records to make out a preliminary critical pathway, hospital stays for horizontal axis were showed 6 days, mean hospital stays were 7.5 days, 2.1 days were to be taken operation after admission and 4.2 days were stayed until discharge after operation. 3. After making out a questionare in 90 items of a medical service content of eight categories and verifying the content validity of expertises, the 85 items of the preliminary critical pathway were selected by expertises agreement over 88% and modified or deleted 5 items showing agreement below 75%. 4. After verifying a validity to 10 patients for 4 weeks, hospital stays were 5.9 days. There were deleted 1 item and modified or supplemented the 9 items of the 10 items.

  • PDF

GEO-KOMPSAT-2 LAE Burn Plan in Supersynchronous Transfer Orbit (정지궤도복합위성의 SSTO 액체원지점엔진 점화계획)

  • Park, Bong-Kyu;Choi, Jae-Dong
    • Aerospace Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.122-130
    • /
    • 2014
  • GEO-KOMPSAT-2 which is under development by KARI to be launched in 2018 is expected to be injected into its orbit through the standard GTO(Geostationary Transfer Orbit) or SSTO(Supersynchronous Transfer Orbit). While the standard GTO mission has been applied for the most of the geostationary satellites, the SSTO mission is rare case and significantly different from the standard GTO mission in technical point of view. This paper lists the operational constraints to be applied for GEO-KOMPSAT-2 SSTO mission, and introduces a preliminary LAE burn plan for GEO-KOMPSAT-2 mission. In order to evaluate the developed plan, a simulation study has been performed considering ground station visibility.

A study on the Housing Choice of the Elderly according to the Financial Retirement Planning of Pre-seniors (예비 고령자의 경제적 은퇴계획에 따른 고령자 주택선택에 관한 연구)

  • Kim, Chang-Gon;Lee, Joo-Hyung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.2
    • /
    • pp.175-189
    • /
    • 2015
  • This study analyzed the determinant factors of elderly housing by housing type according to the Financial Retirement plan of preliminary elders and it aimed to draw a future development scheme of elderly housing. This study used parameters of existing research as control variables and it has a meaningful point that the variables of Financial Retirement plan of elders were verified through the research model which this study used. In addition, there was a difference between the detailed models. As a comprehensive analysis result, the Choice Model of elderly housing type has a difference between determinants, the single-family housing and the multi-family housing, based on the Welfare Facility for the Aged from Financial Retirement plan of elders.

A method for Application of Hybrid Geothermal Cooling-Heating System in Multi Family Apartment (공동주택용 하이브리드 지열 냉난방 시스템의 적용추진 전략)

  • Park, Yong-Boo;Park, Jong-Bae;Kim, Gil-Tae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1447-1454
    • /
    • 2009
  • Currently, geothermal heat pump systems are being installed in new official and commercial building, welfare facilities, and school but there are a few cases for the housing heat sink in Korea. The reason is that there are no progressive taxes for the household electrical use, no actual output for the application of geothermal technology, high initial investment. For the overall use in multi family apartment such as the Green Home etc, technology development and building of the relevant research team need to be done through preliminary study. Core subjects for overall use include cooling heating load estimation for the multi family apartment, economical efficiency of the geothermal cooling and heating system, design and construction technology of the geothermal cooling and heating system for the multi family apartment, commercialization plan, and state of the art analysis. Selection of the detailed subjects with respect to core subject, driving schedule and commercialization plan, driving system, presentation of the utilization plan.

  • PDF

A Preliminary Study on the Effective Management Plan for the International Science Business Library (국제과학비즈니스도서관의 효과적 운영에 관한 기초연구)

  • Park, Hyun-Hee;Lee, Sung-Sook
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.49 no.2
    • /
    • pp.235-254
    • /
    • 2015
  • The aim of this study is to propose the effective management plan for (New) Library at International Science Business Belt in Korea. For this purpose, this study analyzed cases of domestic and overseas libraries which have been providing the special Science Business Service. Also user questionnaire surveys were conducted for the user demand in (New) Library. Based on case studies and user surveys, the management plan for ISBL was suggested as follow with its division into five realms; that is, information resources and special programs, manpower, space facilities, internal cooperation and international network. The research could be used as basic resources for the International Science Business Library in Korea.

A Study on the Geometric Form of the Preliminary Plan "hanyang" in Early Chosun Dynasty (초기 한양도성계획의 도형적 해석에 관한 연구)

  • 정기호;김용기
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.22 no.4
    • /
    • pp.119-132
    • /
    • 1995
  • This study shows the characteristics of the early phenomena of the city plan Hanyang (old city Seoul). It consists of two steps. One is to search for the constructing principles of the geometric setting. And the other is to inquire and interpret the objects of beginning and ending points of that setting. The results based on geographic analysis and historical facts are as follows: 1) The city plan Hanyang shows a certain hierarchy:the major axis and the locations of the palace and the city set up in the prority. This priority made onto lower hierarchical plans such as the site plans of palaces and city wall. For example of the significant objects are Namdaemum (South Gate of the city wall) and Kwanghwamun (South Gate of the Palace). They are on the main axis, and became the basic points of the detailed city plans. 2) The palace palace on its major axis, right-angled minor axis, and 4 grade inclination to north. The four small city wall gates located on the base of four greater gates. 3) The geometric characteristics as constructing principle found on certain hierarchical order. Thus, the natural elements as mountains, had an important effect on the arrangement of major facilities and those main constructions made on lower - hierarchical settings. 4) These facts related closely to the philosophy of Jung, Do-Jon, the initiative planer of the Hanyang.

  • PDF

Optimizing Laser Scanner Selection and Installation through 3D Simulation-Based Planning - Focusing on Displacement Measurements of Retaining Wall Structures in Small-scale Buildings -

  • Lee, Gil-yong;Kim, Jun-Sang;Yoou, Geon hee;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.68-82
    • /
    • 2024
  • The planning stage of laser scanning is crucial for acquiring high-quality 3D source data. It involves assessing the target space's environment and formulating an effective measurement strategy. However, existing practices often overlook on-site conditions, with decisions on scanner deployment and scanning locations relying heavily on the operators' experience. This approach has resulted in frequent modifications to scanning locations and diminished 3D data quality. Previous research has explored the selection of optimal scanner locations and conducted preliminary reviews through simulation, but these methods have significant drawbacks. They fail to consider scanner inaccuracies, do not support the use of multiple scanners, rely on less accurate 2D drawings, and require specialized knowledge in 3D modeling and programming. This study introduces an optimization technique for laser scanning planning using 3D simulation to address these issues. By evaluating the accuracy of scan data from various laser scanners and their positioning for scanning a retaining wall structure in a small-scale building, this method aids in refining the laser scanning plan. It enhances the decision-making process for end-users by ensuring data quality and reducing the need for plan adjustments during the planning phase.