• Title/Summary/Keyword: Prefabricated construction method

Search Result 86, Processing Time 0.026 seconds

Reliability-Based Assessment of Safety and Residual Carrying-Capacity of Steel-Box Pedestrian Bridges (신뢰성에 기초한 강상형 보도육교의 안전도 및 잔존 내하력평가)

  • 조효남;최영민;이은철
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.04a
    • /
    • pp.202-211
    • /
    • 1996
  • A number of typical type of steel-box pedestrian bridges are constructed in the metropolitan highway or heavy traffic urban area. Although it has the advantage of speedy construction because of its simple structural form and prefabricated erection method, it has been reported that many of these bridges are deteriorated or damaged and thus are in the state such that it would give unsafe and uncomfortable feeling to pedestrians. In the paper, for the realistic assessment of safety and residual earring-capacity of deteriorated and/or damaged steel box pedestrian bridges, an interactive non-linear limit state model are formulated based on the von Mises' combined stress yield criterion. It is demonstrated that the proposal model is effective for the reliability-based safety assessment and residual carrying-capacity evaluation of steel-box pedestrian bridges. In addition, this study suggests an effective and practical field load test method for pedestrian bridges.

  • PDF

A Study on the Design criteria of Steel Unit House for the Open System (유닛 모듈라 주택의 설계자동화를 위한 기초 연구(I) - 부품 및 유닛의 DB설정을 중심으로-)

  • Lim, Seok-Ho
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2005.11a
    • /
    • pp.287-290
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and Unit Box have their own merits an demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

A Study on the Design criteria of Steel Unit House for the Open System (유닛 모듈라 주택의 설계자동화를 위한 기초 연구(II) - 유닛간의 결합/배치/평면구성 원칙을 중심으로-)

  • Lim, Seok-Ho
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2005.11a
    • /
    • pp.291-294
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel Stud and Unit Box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

THE CONSTRUCTION METHOD OF IN-CERAM ALUMINA 3 UNIT BRIDGE USING CELAY SYSTEM (Celay System을 이용한 In-Ceram Alumina 3 Unit Bridge제작법)

  • Jo, Byung-Woan
    • Journal of the Korean Academy of Esthetic Dentistry
    • /
    • v.5 no.1
    • /
    • pp.34-43
    • /
    • 1996
  • In nowdays many dental CAD/CAM system were developed. Among those only Cerec and Celay were used globally as clinical application. Celay is a machinable ceramic system that is capable of milling inlays, onlays, and veneers from prefabricated industrial ceramic blocks(Vita Celay Blanks). The advatages of Celay are to simplify the manufactures and to save the processing time. For esthetics In-Ceram Alumina bridges were introduced into maxillary anterior restoration. They have a high strength, a high translucency and an excellent marginal adapation. But the laboratory processes are very difficult and complicated. So the construction of In-Ceram Alumina bridge combined with celay system was desgined. The patient is a 28 year old age male. The chief complain is missing of maxillary left central incisor. He wants to restore anterior bridge for esthetically. The Alumina bridge framework was constructed easily by celay system. Glass ilfiltration was occurred. After that, vitadura-${\alpha}$porcelain build up was occurred by conventional method. The translucency of In-Ceram Alumina 3 unit bridge revealed to be superior to that of porcelain fused to metal bridge. So we report it with clincal case and literature reviews.

  • PDF

Determination of the load carrying capacity of closed steel supports used in underground construction and mining

  • Lenka, Koubova;Petr, Janas;Karel, Janas;Martin, Krejsa
    • Steel and Composite Structures
    • /
    • v.45 no.5
    • /
    • pp.715-728
    • /
    • 2022
  • Closed steel supports of different shapes are used in mining and underground constructions. The supports are prefabricated from rolled, usually robust, steel profiles. The load carrying capacity of a support is considerably influenced by the active loading and passive forces. The passive forces are induced by interactions between the support and the surrounding rock mass. The analysis herein comprises three parts: The first part consists of structural geometry processing. The second part involves finding the numerical solution of a statically indeterminate structure for a specified load. The third part is calculation of the load carrying capacity and the components of internal forces and deformations. For this, the force method and numerical integration are used. The Winkler model is applied when the support interacts with the surrounding environment. The load carrying capacity is limited by the slip resistance of the connected parts and it is limited by reaching the ultimate state of the profile. This paper serves as a comprehensive reference for the determination of the load carrying capacity of closed steel supports and includes stepwise derivations of the governing formulas.

An Experimental Study on the Behavior of Column-to-Column Connections of Prefabricated Concrete Filled Tubes (프리훼브 콘크리트충전 각형강관기둥 이음부의 휨거동에 관한 실험적 연구)

  • Kim, Jae Hoon;Lee, Myung Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.3 s.40
    • /
    • pp.311-318
    • /
    • 1999
  • Concrete filled tubular(CFT) members have many structural and constructional advantages. The prefabrication of CFT members can be thought an idea for the good qualify control of concrete. The objective of this study is to suggest the construction method of prefab CFT beam-columns. Tests are performed to understand their structural behaviors. The opening space between prefab CFT members and the size of tubular members are the parameters of this study. The results of this study will be based on the suggestion of prefab CFT.

  • PDF

A Case Study on Soft Soil Treatment Design and Construction in Vietnam (베트남지역에서의 연약지반 개량 설계.시공 사례)

  • Yoon, Dong-Duk;Cho, Sung-Han;Seo, Won-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.336-345
    • /
    • 2010
  • GS E&C was awarded the contract for the construction of Hanoi - Hai Phong Expressway Package EX-7 from Station Km 72+000 to Station Km 81+300 in December 2008. This project is the $7^{th}$ contract package of the 105.5 km long expressway near Hai Phong city, which includes a FCM-styled bridge along with high embankments over soft ground. For these high embankments, there is a need to treat the soft soil for improving the overall stability during construction and for reducing the post-construction settlement of the expressway. The Designer of this project had adopted four (4) different types of ground improvement techniques to treat the soft ground, including the prefabricated vertical drains (PVD), sand drains (SD), pack drains (PD, or sometimes called packed sand drains), and sand compaction piles (SCP). The main focus of soft soil treatment should be paid attention to the residual settlement after construction. In current design, however, it appeared that the secondary compression (or creep) of the improved soil layer and the consolidation settlement of the lower untreated compressible soil layer have been neglected in the estimation of the post-construction settlement. These uncalculated residual settlements may not only unsatisfy the design criteria but also raise serious problems during service period of this expressway. In this paper, the subsoil condition and current design were reviewed focusing on the employed soft soil treatment method and expected residual settlement.

  • PDF

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

A Study on the PVDs Consolidation Degree Considering In-Situ Conditions (현장조건을 고려한 PVDs의 압밀도 산정에 관한 연구)

  • Shin, Eun-Chul;Park, Jeong-Jun;Kwon, Hyeung-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.824-827
    • /
    • 2006
  • The Prefabricated Vertical Drains (PVDs) method is one of the most widely used techniques to accelerate the consolidation process in-situ and hence increase its bearing capacity. In this paper, the degree of consolidation incorporated with PVDs was evaluated in O construction work site which composed with dredged soil. O Program PVD(Version 2.3) which developed by Asian Institute of Technology was used. The purpose of this analysis is efficiently to estimate the degree of consolidation by analyzing the surface settlement with time, and drainage at initial stage and final stage by using design-parameter which based on the in-situ tests and laboratory tests. This result can be compared with analysis of the degree of consolidation using Program PVD(Version 2.3) and the field observed data in the future studies.

  • PDF

Experiments and numerical analyses for composite RC-EPS slabs

  • Skarzynski, L.;Marzec, I.;Tejchman, J.
    • Computers and Concrete
    • /
    • v.20 no.6
    • /
    • pp.689-704
    • /
    • 2017
  • The paper presents experimental and numerical investigations of prefabricated composite structural building reinforced concrete slabs with the insulating material for a residential building construction. The building slabs were composed of concrete and expanded polystyrene. In experiments, the slabs in the full-scale 1:1 were subjected to vertical concentrated loads and failed along a diagonal shear crack. The experiments were numerically evaluated using the finite element method based on two different constitutive continuum models for concrete. First, an elasto-plastic model with the Drucker-Prager criterion defined in compression and with the Rankine criterion defined in tension was used. Second, a coupled elasto-plastic-damage formulation based on the strain equivalence hypothesis was used. In order to describe strain localization in concrete, both models were enhanced in the softening regime by a characteristic length of micro-structure by means of a non-local theory. Attention was paid to the formation of critical diagonal shear crack which was a failure precursor.