• 제목/요약/키워드: Prefabricated construction method

검색결과 86건 처리시간 0.024초

신뢰성에 기초한 강상형 보도육교의 안전도 및 잔존 내하력평가 (Reliability-Based Assessment of Safety and Residual Carrying-Capacity of Steel-Box Pedestrian Bridges)

  • 조효남;최영민;이은철
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1996년도 봄 학술발표회 논문집
    • /
    • pp.202-211
    • /
    • 1996
  • A number of typical type of steel-box pedestrian bridges are constructed in the metropolitan highway or heavy traffic urban area. Although it has the advantage of speedy construction because of its simple structural form and prefabricated erection method, it has been reported that many of these bridges are deteriorated or damaged and thus are in the state such that it would give unsafe and uncomfortable feeling to pedestrians. In the paper, for the realistic assessment of safety and residual earring-capacity of deteriorated and/or damaged steel box pedestrian bridges, an interactive non-linear limit state model are formulated based on the von Mises' combined stress yield criterion. It is demonstrated that the proposal model is effective for the reliability-based safety assessment and residual carrying-capacity evaluation of steel-box pedestrian bridges. In addition, this study suggests an effective and practical field load test method for pedestrian bridges.

  • PDF

유닛 모듈라 주택의 설계자동화를 위한 기초 연구(I) - 부품 및 유닛의 DB설정을 중심으로- (A Study on the Design criteria of Steel Unit House for the Open System)

  • 임석호
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2005년도 추계학술대회 논문집
    • /
    • pp.287-290
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and Unit Box have their own merits an demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

유닛 모듈라 주택의 설계자동화를 위한 기초 연구(II) - 유닛간의 결합/배치/평면구성 원칙을 중심으로- (A Study on the Design criteria of Steel Unit House for the Open System)

  • 임석호
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2005년도 추계학술대회 논문집
    • /
    • pp.291-294
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel Stud and Unit Box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

Celay System을 이용한 In-Ceram Alumina 3 Unit Bridge제작법 (THE CONSTRUCTION METHOD OF IN-CERAM ALUMINA 3 UNIT BRIDGE USING CELAY SYSTEM)

  • 조병완
    • 대한심미치과학회지
    • /
    • 제5권1호
    • /
    • pp.34-43
    • /
    • 1996
  • In nowdays many dental CAD/CAM system were developed. Among those only Cerec and Celay were used globally as clinical application. Celay is a machinable ceramic system that is capable of milling inlays, onlays, and veneers from prefabricated industrial ceramic blocks(Vita Celay Blanks). The advatages of Celay are to simplify the manufactures and to save the processing time. For esthetics In-Ceram Alumina bridges were introduced into maxillary anterior restoration. They have a high strength, a high translucency and an excellent marginal adapation. But the laboratory processes are very difficult and complicated. So the construction of In-Ceram Alumina bridge combined with celay system was desgined. The patient is a 28 year old age male. The chief complain is missing of maxillary left central incisor. He wants to restore anterior bridge for esthetically. The Alumina bridge framework was constructed easily by celay system. Glass ilfiltration was occurred. After that, vitadura-${\alpha}$porcelain build up was occurred by conventional method. The translucency of In-Ceram Alumina 3 unit bridge revealed to be superior to that of porcelain fused to metal bridge. So we report it with clincal case and literature reviews.

  • PDF

Determination of the load carrying capacity of closed steel supports used in underground construction and mining

  • Lenka, Koubova;Petr, Janas;Karel, Janas;Martin, Krejsa
    • Steel and Composite Structures
    • /
    • 제45권5호
    • /
    • pp.715-728
    • /
    • 2022
  • Closed steel supports of different shapes are used in mining and underground constructions. The supports are prefabricated from rolled, usually robust, steel profiles. The load carrying capacity of a support is considerably influenced by the active loading and passive forces. The passive forces are induced by interactions between the support and the surrounding rock mass. The analysis herein comprises three parts: The first part consists of structural geometry processing. The second part involves finding the numerical solution of a statically indeterminate structure for a specified load. The third part is calculation of the load carrying capacity and the components of internal forces and deformations. For this, the force method and numerical integration are used. The Winkler model is applied when the support interacts with the surrounding environment. The load carrying capacity is limited by the slip resistance of the connected parts and it is limited by reaching the ultimate state of the profile. This paper serves as a comprehensive reference for the determination of the load carrying capacity of closed steel supports and includes stepwise derivations of the governing formulas.

프리훼브 콘크리트충전 각형강관기둥 이음부의 휨거동에 관한 실험적 연구 (An Experimental Study on the Behavior of Column-to-Column Connections of Prefabricated Concrete Filled Tubes)

  • 김재훈;이명재
    • 한국강구조학회 논문집
    • /
    • 제11권3호통권40호
    • /
    • pp.311-318
    • /
    • 1999
  • 콘크리트충전 강관은 콘크리트와 강관의 합성작용으로 인한 내력의 증가와 우수한 변형능력 등의 많은 장점이 있으나 현장에서 강관에 콘크리트를 타설할 때 충전된 콘크리트의 충전성에 대한 신뢰도가 떨어질 수 있다. 본 연구에서는 콘크리트의 공장타설에 의한 콘크리트충전 각형강관기둥의 프리훼브화로 콘크리트의 충전성을 확보하기 위한 목적으로 현장에서의 기둥 이음방식을 용접과 고강도 무수축 모르터를 사용한 접합방법을 사용하여 이에 대한 실험을 하였다. 본 연구는 이러한 시공법을 선택할 경우 콘크리트를 미리 타설한 기둥과 기둥을 접합할 때 그 이음부의 역학적 특성을 파악하여 실제 현장에서 실시하고 있는 방법인 현장 타설방법과 동등한 능력을 발휘할 수 있는 지를 확인하고 그 방법에 대한 영향인자를 파악하고 분석하는 기초적 연구이다.

  • PDF

베트남지역에서의 연약지반 개량 설계.시공 사례 (A Case Study on Soft Soil Treatment Design and Construction in Vietnam)

  • 윤동덕;조성한;서원석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.336-345
    • /
    • 2010
  • GS E&C was awarded the contract for the construction of Hanoi - Hai Phong Expressway Package EX-7 from Station Km 72+000 to Station Km 81+300 in December 2008. This project is the $7^{th}$ contract package of the 105.5 km long expressway near Hai Phong city, which includes a FCM-styled bridge along with high embankments over soft ground. For these high embankments, there is a need to treat the soft soil for improving the overall stability during construction and for reducing the post-construction settlement of the expressway. The Designer of this project had adopted four (4) different types of ground improvement techniques to treat the soft ground, including the prefabricated vertical drains (PVD), sand drains (SD), pack drains (PD, or sometimes called packed sand drains), and sand compaction piles (SCP). The main focus of soft soil treatment should be paid attention to the residual settlement after construction. In current design, however, it appeared that the secondary compression (or creep) of the improved soil layer and the consolidation settlement of the lower untreated compressible soil layer have been neglected in the estimation of the post-construction settlement. These uncalculated residual settlements may not only unsatisfy the design criteria but also raise serious problems during service period of this expressway. In this paper, the subsoil condition and current design were reviewed focusing on the employed soft soil treatment method and expected residual settlement.

  • PDF

프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발 (Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder))

  • 김대영;정태원;김량균
    • 한국건설관리학회논문집
    • /
    • 제24권3호
    • /
    • pp.12-19
    • /
    • 2023
  • 건설업의 경우 공사기간 내에 최소한의 수수료로 완제품을 인도할 수 있도록 공정과 원가의 관계를 적절히 분배해야 한다. 이때 교량의 크기, 공법, 공장의 환경과 생산능력, 운송거리 등을 고려해야 한다. 그러나 공사기간 중 발생하는 다양한 원인으로 인해 공사지연, 공사비 상승, 품질 및 신뢰성 저하 등의 문제가 발생하고 있다. 따라서, 기존의 방식에서 탈피하기 위해서는 체계적이고 과학적인 시공기술과 공정관리 기술이 필요하다. 프리팹(Pre - Fabrication)은 공장에서 제작하여 현장에서 시공하는 대표적 OSC(Off-Site Construcation) 공법이다. 본 연구에서는 프리팹 교량 거더인 Nodular 거더의 공정관리를 위한 자원 및 공정계획 최적화 시스템 개발이다. 인력, 장비 동원 계획의 다양한 변수를 자동으로 테스트하여 최적의 값을 도출하는 시뮬레이션 알고리즘을 개발한다. 그리고, 건설 중인 파주-포천 고속도로 건설공사(3공구) 도하 4교에 알고리즘을 적용하여 그 결과를 비교한다. 건설공사 표준품셈을 근거로 액티비티 카드에 실제 투입된 인력, 장비 종류, 수량 등을 적용하고, 작업량, 자원계획, 자원소요량을 반영했다. 향후 다양한 현장 데이터를 포함한 예측기법을 적용하여 프로그램의 정확도를 높일 계획이다.

현장조건을 고려한 PVDs의 압밀도 산정에 관한 연구 (A Study on the PVDs Consolidation Degree Considering In-Situ Conditions)

  • 신은철;박정준;권형택
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.824-827
    • /
    • 2006
  • The Prefabricated Vertical Drains (PVDs) method is one of the most widely used techniques to accelerate the consolidation process in-situ and hence increase its bearing capacity. In this paper, the degree of consolidation incorporated with PVDs was evaluated in O construction work site which composed with dredged soil. O Program PVD(Version 2.3) which developed by Asian Institute of Technology was used. The purpose of this analysis is efficiently to estimate the degree of consolidation by analyzing the surface settlement with time, and drainage at initial stage and final stage by using design-parameter which based on the in-situ tests and laboratory tests. This result can be compared with analysis of the degree of consolidation using Program PVD(Version 2.3) and the field observed data in the future studies.

  • PDF

Experiments and numerical analyses for composite RC-EPS slabs

  • Skarzynski, L.;Marzec, I.;Tejchman, J.
    • Computers and Concrete
    • /
    • 제20권6호
    • /
    • pp.689-704
    • /
    • 2017
  • The paper presents experimental and numerical investigations of prefabricated composite structural building reinforced concrete slabs with the insulating material for a residential building construction. The building slabs were composed of concrete and expanded polystyrene. In experiments, the slabs in the full-scale 1:1 were subjected to vertical concentrated loads and failed along a diagonal shear crack. The experiments were numerically evaluated using the finite element method based on two different constitutive continuum models for concrete. First, an elasto-plastic model with the Drucker-Prager criterion defined in compression and with the Rankine criterion defined in tension was used. Second, a coupled elasto-plastic-damage formulation based on the strain equivalence hypothesis was used. In order to describe strain localization in concrete, both models were enhanced in the softening regime by a characteristic length of micro-structure by means of a non-local theory. Attention was paid to the formation of critical diagonal shear crack which was a failure precursor.