Proceedings of the Korean Vacuum Society Conference
/
2013.08a
/
pp.318.1-318.1
/
2013
Nowadays Cu2ZnSnS4 (CZTS) solar cell is attracting a lot of attention as a strong alternative to CIGS solar cell due to nontoxic and inexpensive constituent elements of CZTS. From various processes for the fabrication of CZTS solar cell, solution-based deposition of CZTS thin films is well-known non-vacuum process and many researchers are focusing on this method because of large-area deposition, high-throughput, and efficient material usage. Typically the solution-based process consists of two steps, coating of precursor solution and annealing of the precursor thin films. Unlike vacuum-based deposition, precursor solution contains unnecessary elements except Cu, Zn, Sn, and S in order to form high quality precursor thin films, and thus the precise control of precursor thin film preparation is essential for achieving high efficient CZTS solar cells. In this work, we have investigated the effect of preparation condition of CZTS precursor thin films on the performance of CZTS solar cells. The composition of CZTS precursor solution was controlled for obtaining optimized chemical composition of CZTS absorber layers for high-efficiency solar cells. Pre-annealing process of the CZTS precursor thin films was also investigated to confirm the effect of thermal treatment on chemical composition and carbon residues of CZTS absorber layers. The change of the morphology of CZTS precursor thin film by the preparation condition was also observed.
Isroaniso matrix precursor synthesized from commercially available petroleum pitch was stabilized in air. The influence of oxygen mass gain during stabilization on the yield of matrix precursor was studied. Additionally, the influence of pressure on the yield of the stabilized matrix precursor in a real system was studied. The fourier transform infrared spectrometry (FTIR), thermogravimetric analysis (TGA), yield, yield rate, and yield impact were used to check the effect of stabilization and pressure on the yield of the matrix precursor and the end properties of the composite thereafter. The results showed that the yield increased with stabilization duration up to 20 h whereas it decreased for stabilization duration beyond 20 h. Further results showed that the stabilized matrix precursor for a duration of 5 h could withstand almost two-fold greater hot-pressing pressure without resulting in exudation as compared to that of a 1 h stabilized matrix precursor. The enhanced hot-pressing pressure significantly improved the yield of the matrix precursor. As a consequence, the densification and mechanical properties were increased significantly. Further, the matrix precursor stabilized for a duration of 20 h or more failed to provide proper and uniform binding of the reinforcement.
In the powder compact melting technique, proper precursor fabrication is very important because density distribution after foaming and foamability are determined during precursor fabrication process. The fabrication of the precursor has to be performed very carefully because any residual porosity or other defects will lead to poor results in further processing. In order to evaluate the effect of the compaction parameters on the kinetics of the foaming process, a series of experiments were performed. In this study, aluminium foams with a closed cell structure were fabricated by using both the powder compact method and the induction heating process. A proper induction coil was designed to obtain a uniform temperature distribution over the entire cross sectional area of precursor. To establish the foamable precursor fabrication conditions, effects of process parameters such as the titanium hydride content (0.3∼1.5 wt.%), pressing pressure of the foamable precursor (50∼150kN) on the pore morphology were investigated.
Kim, Chan;Kim, Dae-Hwan;Seong, Si-Jun;Gang, Jin-Gyu;Lee, Il-Su;Do, Jin-Yeong;Park, Wan-U
Proceedings of the Korean Vacuum Society Conference
/
2011.02a
/
pp.404-405
/
2011
Cu(InGa)$Se_2$ (CIGS) 박막 태양전지의 저가 및 대면적화를 위한 양산화 공정인 two-step process (sputter/selenization) 공정에서는 sputtering으로 형성한 metal precursor stack을 $H_2$ Se gas를 이용하여 selenization하는 공정을 주로 이용한다. 하지만 이러한 selenization 공정은 유독한 $H_2$ Se gas를 이용해야 한다는 점과 긴 시간 동안 열처리를 해야 하는 단점을 가지고 있다. 이에 metal precursor stack 위에 Se 막을 우선 증착하고, Rapid Thermal Process (RTP)를 이용하여 selenization하는 방법이 현재 많은 관심을 끌고 있다. 본 논문에서는 sputtering 이후 RTP를 이용한 CIGS 흡수층 제작에 대한 선행연구의 일환으로 co-evaporator 장비를 이용하여 다양한 구조의 precursor를 제작하고 RTP 조건에 따른 selenization 효과를 연구하였다. Co-evaporator를 이용하여 CIGS, CIG/Se, CuGa/In/Se, In/CuGa/Se 4가지 구조의 precursor stack을 Mo coated soda lime glass 위에 제작하였다. 이때 amorphous 상태의 precursor stack을 만들기 위하여 기판에 열은 가하여 주지 않았으며, 각각의 stack 구조에서 가지고 있는 Cu, In, Ga, Se의 총량을 동일하게 유지하기 위하여 각 stack의 증착 시간을 동일하게 유지하였다. Selenization을 위한 RTP 조건은 550, $600^{\circ}C$ 각각에 대하여 1, 5, 10분으로 split을 진행하였다. Precursor stack의 증착 후 관찰한 XRD 결과는 비정질 상태를 잘 나타내었으며, SEM 결과 CIGS precursor stack을 제외한 나머지 구조의 stack에서는 In 박막의 surface roughness로 인하여 박막의 평탄화가 좋지 않음을 확인하였다. CIGS precursor stack의 경우, RTP 온도와 시간 split와 상관없이 결정화가 잘 이루어졌으나 grain의 성장이 부족하였다. 이에 비하여 CIG/Se, CuGa/In/Se, In/CuGa/Se 구조의 precursor stack의 경우, $550^{\circ}C$ 열처리에서는 InSe의 결정상이 관찰 되었으며 $600^{\circ}C$, 5분 이상 열처리에서 CIGS 결정상이 관찰되었다. 이러한 결과는 Se이 metal 원소들과 함께 있는 CIGS 구조에 비하여 metal precursor stack 위에 Se을 증착한 stack 구조들의 경우는 CIGS 결정을 형성하기 위해 Se이 metal 층들로 확산되어 반응을 하여야 하므로 상대적으로 많은 열에너지가 필요한 것으로 이해할 수 있으며, RTP를 이용한 selenization 공정으로 CIGS 박막 태양전지의 흡수층 형성이 가능함을 확인하였다.
Kim, Doo-Hyun;Kim, Sung-Chul;Lee, Jong-Ho;Kang, Dong-Kyu
Journal of the Korean Society of Safety
/
v.24
no.2
/
pp.30-36
/
2009
This paper aims at the precursor analysis and DB development of electrical fires based on thermal and current signals for partial disconnection and poor contact on electric wires through experiments and simulations. Also, DB system required for developing the precursor DB with these data was studied and designed. Firstly, in case of partial disconnection, characteristics were derived and analyzed by experiment and electrical-thermal finite element method(Flux 3D) on the model wires which consist of VCTF and IV electric wires. Based on the characteristics, About 351 partial disconnection precursor patterns were generated by the thermal analysis for electric wire according to deterioration time under normal state and 200% overload state of rated current. Secondly, in order to develop poor contact precursor patterns, temperature value and the current signal were considered. In simulating the poor contact situation on connector area of MCCB, connection torque was changed. Through the experimental analysis, about 251 poor contact precursor patterns were generated. Finally, Using thermal precursor patterns obtained by partial disconnection and poor contact, electrical fire thermal precursor DB was developed.
Many researches on fabrication process for BSCCO precursor powders have been developed for high J$_{c}$ BSCCO-2223 tape. Spray pyrolysis method for fabrication of precursor powder has many advantages, such as high purity, fine particle size and low carbon content of BSCCO precursor powder. Fine, spherical powders were prepared by ultrasonic spray pyrolysis from the aqueous solution of metal nitrates. BSCCO precursor powders were synthesized with various solutes concentration and heat treatment conditions. Average particle size for spray pyrolysis powders was $1.5∼3\mu\textrm{m}$. Bi-2223/Ag tape was prepared by PIT method and followed by various sintering conditions. BSCCO precursor powders were characterized by XRD, SEM, EDS, Carbon content and particle size analysis.s.
Properties of Precursor pitch derived from petroleum residue were studied physical and chemical analysis method for investigation of production of pitch fiber. For preparing of those precursor pitches it was carried out a temperature and time variation experiment i reactor. It was demonstrated the precursor pitch prepared in this study to have a similar properties to Ashland precursor pitch capable of bulk mesophase formation from the results of the basic analysis, that is, molecular weight distribution, coking yield, carbon content, chemical composition, etc.
Kim, Y.K.;Yoo, J.M.;Chung, K.C.;Ko, J.W.;Cho, Y.S.;Heo, E.O.
Progress in Superconductivity
/
v.8
no.1
/
pp.22-26
/
2006
Total Fluorine content in the precursor solution for MOD processing of YBCO coated conductors can be significantly reduced by synthesizing precursor solution with F-free Y & Cu precursor and Barium trifluoroacetate(TFA). It was shown that crack-free and uniform precursor films were formed after calcinations in humidified oxygen atmosphere. Less than 2 hours are required to finish the calcination process, and XRD measurement shows that $BaF_2,\;CuO,\;and\;Y_2O_3$ are major constituent of calcined precursor films. Film thickness after calcination was measured to be ${\sim}2.8$ um by applying slot-die coating method. In particular, addition of Samarium shows critical current of Ic=226 A/cm-w($Jc=3.4\;MA/cm^2$). Also discussed are recent developments in the reel-to-reel processing using F-free Y & Cu precursor solutions. It is shown that uniform and fast processing route to YBCO coated conductor with high Ic can be provided by employing F-free Y & Cu precursor solutions in MOD process.
Kim, Young-Kuk;Yoo, Jai-Moo;Chung, Kook-Chae;Ko, Jae-Woong
Progress in Superconductivity and Cryogenics
/
v.9
no.1
/
pp.1-4
/
2007
The total Fluorine content in the precursor solution for MOD processing of YBCO coated conductors can be significantly reduced by synthesizing precursor solution with F-free Y & Cu precursor and Barium trifluoroacetate(TFA). It was shown that crack-free and uniform precursor films were formed after calcinations in humidified oxygen atmosphere. Less than 2 hours are required to finish the calcinations process and XRD measurement shows that $BaF_2,\;CuO,\;Y_2O_3$ are major constituent of calcined precursor films. Film thickness after calcinations was improved to be 2.8um by applying slot-die coating method. In particular, addition of Samarium shows critical current of $I_c=273A/cm-w(J_c=3.8MA/cm^2)$. It is shown that uniform and fast processing route to YBCO coated conductor with high Ic can be provided by employing F-free Y & Cu precursor solution in MOD process.
Homogeneous and fine powders for Bi-2223 tape were prepared by ultrasonic spray pyrolysis (SP) method from an aqueous solution of metal nitrates. Bi-2223 precursor powders were synthesized with various solutes concentration and pyrolysis temperature. The synthesized precursor powders had a narrow particle size distribution and an average particle size was $\~{\cal}um$. The reactivity of precursor powder by SP method is very high, attributed to the fine and narrow particle size distribution. Bi-2223/Ag tape was prepared using PIT method and followed by various sintering conditions. The precursor powder by SP method promoted a very quick formation of the Bi-2223 phase for short sintering time while the secondary phase such as large AEC phase and $Ca_2PbO_4$ were minimized for SP tapes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.