• Title/Summary/Keyword: Precast pile

Search Result 62, Processing Time 0.016 seconds

Structural Performance Evaluation of Offshore Modular Pier Connection using Ultra-high Performance Concrete (초고성능 콘크리트를 활용한 해상 모듈러 잔교 연결부의 구조성능 평가)

  • Lee, Dong-Ha;Kim, Kyong-Chul;Kang, Jae-Yoon;Ryu, Gum-Sung;Koh, Kyung-Taek
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.3
    • /
    • pp.351-357
    • /
    • 2022
  • In this study, offshore modular pier system using the ultra-high performance concrete was developed for the offshore construction environment. For the application of offshore modular pier system, the design, fabrication, and construction performance evaluation were performed using ultra-high performance concrete a compressive strength 120 MPa or more and a direct tensile strength 7 MPa or more. For offshore piers previously constructed with precast concrete, it was intended to verify the idea and possibility of solving errors due to position or vertical deformation during the driving of the foundation pile part during the construction stage. Furthermore, a offshore modular pier system was fabricated with ultra-high performance concrete for the construction performance evaluation. The results showed that a offshore modular pier system secured about 9 % of sectional performance of load bearing capacity under ultimate load conditions. If the offshore modular pier system developed through this study is utilized in the future, it is judged that competitiveness due to sufficient durability and constructability can be secured.

A Study for Predicting Rotational Cutting Torque from Electrical Energy Required for Ground Drilling (지반절삭 전기에너지를 활용한 회전굴착토크 예측에 관한 연구)

  • Choi, Chang-Ho;Cho, Jin-Woo;Lee, Yong-Soo;Chung, Ha-Ik;Park, Yong-Boo
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.57-64
    • /
    • 2007
  • This study proposes a method to estimate drilling torque during ground boring with an aid of electrical energy required for rotating a boring-auger. Ground boring is commonly used in geotechnical engineering such as preboring precast pile installation, soil-cement grouting, ground exploration and so forth. In order to understand the correlation between required electrical energy to rotate the boring auger and the drilling torque, a small laboratory apparatus was designed and a pilot study was performed. The apparatus rotates common drill bits of $D=5{\sim}25mm$ in CBR specimens. The velocity of a bit is 19 RPM and predefined using a reduction gear which connects a main rotation axis to a 25 Watts AC electrical motor shaft. In the middle of drilling the motor current increments and the drilling torque were measured and the correlation between the current and the torque was obtained through linear square fits. Based on the correlation the acquired motor current during drilling was applied to predict the drilling torque in consequent testing and the prediction results were compared to the measured torque. The comparison leads a conclusion that the motor current during drilling using electrical power may be a good indicator to estimate/determine strength characteristics of the ground.