• Title/Summary/Keyword: Pre-bored steel pile piles

Search Result 4, Processing Time 0.017 seconds

Calculation of Base Load Capacity of Bored Pre-cast Piles Using New PHC PIles with Steel Pipe at Pile Toe (강관 부착 PHC파일로 시공된 매입말뚝의 선단지지력 산정)

  • Paik, Kyu-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.9
    • /
    • pp.5-16
    • /
    • 2016
  • New PHC piles, where short steel pipes are attached to the pile toe, are developed to increase the base load capacity of bored pre-cast piles embedded in weathered rock. In this study, new bored pre-cast piles using the new PHC piles are installed at 7 test sites with different soil conditions, and static and dynamic pile load tests are performed to investigate quantitative characteristics on the base load capacity of new bored pre-cast piles. In addition, based on the static pile load test results, a new empirical equation for estimating the base load capacity of new bored pre-cast piles is proposed. A comparison between predicted and measured base load capacities shows that the proposed empirical equation produces conservative predictions for the new bored pre-cast piles. However, the existing design criterion significantly underestimates the base load capacity of new bored pre-cast piles.

Development of Steel Pipe Attached PHC Piles for Increasing Base Load Capacity of Bored Pre-cast Piles (매입말뚝의 선단지지력 증대를 위한 강관 부착 PHC파일 개발)

  • Paik, Kyu-Ho;Yang, Hee-Jeong
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.8
    • /
    • pp.53-63
    • /
    • 2013
  • Bored pre-cast piles using PHC piles is widely used in foundation of building structures constructed in urban areas because noise and vibration due to pile installation are low. However, since slime is formed at the base of borehole and the density of bearing stratum surrounding the base of borehole is decreased due to stress relaxation in drilling process of bored pre-cast pile method, the base load capacity of bored pre-cast piles is very low compared to the strength of bearing stratum. In this study, a new type of PHC pile, which short steel pipe with the same diameter as the PHC pile is attached to the pile tip, is developed to increase the base load capacity of bored pre-cast piles. In order to check the effect of the use of new PHC pile on the base load capacity of bored pre-cast piles, field pile load tests are performed for bored pre-cast piles using the new and existing PHC piles. Results of the pile load tests show that the new PHC pile gives higher base load capacity to bored pre-cast piles than the existing PHC pile, since the tip of new PHC pile is penetrated to undisturbed bearing stratum passing through the slime at the base of borehole and the loosened bearing stratum under the slime by pile driving using light hammer.

Prediction of End Bearing Capacity for Pre-Bored Steel Pipe Piles Using Instrumented Spt Rods (SPT 에너지효율 측정 롯드를 이용한 매입말뚝의 선단지지력 예측)

  • Nam, Moon S.;Park, Young-Ho;Park, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.12
    • /
    • pp.105-111
    • /
    • 2013
  • The standard penetration test (SPT) has been widely used because of its usability, economy, and many correlations with soil properties among other factors. In SPT, hammer energy is an important factor to evaluate and calibrate N values. To measure hammer energy, an instrumented SPT rod was developed considering that stress waves transferring on rods during SPT driving are the same as stress waves transferring on piles due to pile driving. Using this idea, an instrumented SPT rod with a pile driving analyzer was applied as a pile capacity prediction tool in this study. In order to evaluate this method, SPT and dynamic cone tests with the instrumented SPT rod were conducted and also 2 pile load tests were performed on pre-bored steel pipe piles at the same test site. End bearings were predicted by CAPWAP analysis on force and velocity waves from dynamic cone penetration tests and SPT. Comparing these predicted end bearings with static pile load tests, a new prediction method of the end bearing capacity using the instrumented SPT rod was proposed.

Study on the Fractures Types of PHC Pile by Impact Load of Follower (보조말뚝의 충격하중에 의한 PHC말뚝의 파손유형 고찰)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Min-Kab;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.144-145
    • /
    • 2021
  • This study analyzed the cases of cracks in piles due to the use of followers under construction conditions where water exists inside the piles, and confirmed whether the piles were cracked through a field test simulating the construction conditions in which water pressure inside the piles was generated by a hammer. According to the construction case, under the construction condition where the pile length is 20% to 30% shorter than the drilled length, about 80% cracks occur, so there is a high possibility of cracking due to water inside the pile. A field test was conducted to confirm the type of pile failure due to hammer under the construction condition in which water exists inside the pile. The pile head was not destroyed by the compressive load, and one or more longitudinal cracks occurred along the PC steel wire. The closed end pile generates water pressure by hammer. the follower and cushion(compression plywood) must be drilled at least 0.4D. It is expected that improved quality control will be possible as the water pressure inside the pile is reduced.

  • PDF