This study focuses on the current state of Smart Grid policy in Japan and its problems while the interest in Smart Grid has been increasing since the March 2011 earthquake in East Japan. As a result of the analysis, Japan introduced the fixed price buying system of new and renewable energy in response to the power supply and demand problem caused by the 2011 earthquake in East Japan, and established a decentralized green electricity trading market in which electricity generated from new and renewable energy is traded Smart Grid-related projects were implemented as a solution to solve energy crisis and environmental problems at the same time. As a result, we achieved visible results such as suppressing peak power, reducing CO2 emissions, and securing stable supply and demand of energy using renewable energy sources. On the other hand, the improvement of current Smart Grid policy operation in Japan and the introduction of stabilization system of power system, promotion of international standards of domestic technology related to smart grid, and support for strengthening security of smart grid.
Ahmed, Sheeraz;Raza, Ali;Shafique, Shahryar;Ahmad, Mukhtar;Khan, Muhammad Yousaf Ali;Nawaz, Asif;Tariq, Rohi
KSII Transactions on Internet and Information Systems (TIIS)
/
v.14
no.6
/
pp.2398-2421
/
2020
In third world countries like Pakistan, the production of electricity has been quickly reduced in past years due to rely on the fossil fuel. According to a survey conducted in 2017, the overall electrical energy capacity was 22,797MW, since the electrical grids have gone too old, therefore the efficiency of grids, goes down to nearly 17000MW. Significant addition of fossil fuel, hydro and nuclear is 64.2%, 29% and 5.8% respectively in the total electricity production in Pakistan. In 2018, the demand crossed 20,223MW, compared to peak generation of 15,400 to 15,700MW as by the Ministry of Water and Power. Country faces a deficit of almost 4000MW to 5000MW for the duration of 2019 hot summer term. Focus on one aspect considering Demand Side Management (DSM) cannot oversea the reduction of gap between power demand and customer supply, which eventually leads to the issue of load shedding. Hence, a scheduling scheme is proposed in this paper called RPSMDSM that is based on selection of those appliances that need to be only Turned-On, on priority during peak hours consuming minimum energy. The Home Energy Management (HEM) system is integrated between consumer and utility and bidirectional flow is presented in the scheme. During peak hours of electricity, the RPSMDSM is capable to persuade less power consumption and accomplish productivity in load management. Simulations show that RPSMDSM scheme helps in scheduling the electricity loads from peak price to off-peak price hours. As a result, minimization in electricity cost as well as (Peak-to-Average Ratio) PAR are accomplished with sensible waiting time.
This This paper investigates the variation of the factors to determinate housing price in Seoul metropolitan area after sub-prime financial crisis, in Korea, using a VAR model. The model includes housing price and housing rent (Jeonse) in Seoul metropolitan area from 1999 to 2011, and uses interest rate, real GDP, KOSPI, Producer Price Index and practices to impulse response and variance decomposition analysis to grasp the dynamic relation between a variable of macro economy and and a variable of housing price. Data is classified to 2 groups before and after the 3rd quater of 2008, when sub-prime crisis occurred; one is from the 1st quater of 1999 to the 3rd quater of 2008, and the other is from the 2nd quater of 1999 and the 4th quater of 2011. As a result, comparing before and after sub-prime crisis, housing price is more influenced by its own variation or Jeonse price's variation instead of interest rate and KOSPI. Both before and after sub-prime financial crisis, Jeonse price is also influenced by its own variation and housing price. While after sub-prime financial crisis, influences of Producer Price Index, KOSPI and interest rate were weakened, influence of real GDP is expanded. As housing price and housing rent are more influenced by real economy factors such as GDP, its own variation than before sub-prime financial crisis, the recent trend that the house prices is declined is difficult to be converted, considering domestic economic recession and uncertainty, continued by Europe financial crisis. In the future to activate the housing business, it ia necessary to promote purchasing power rather than relaxation of financial and supply regulation.
Purpose: This paper uses the resource-dependency theory to present the case of the Pakistan sugar industry to highlight how the industry uses a strategic alliance to gain a powerful bargaining position over its critical dependencies. The case of the Pakistan sugar industry is well-known and it is common knowledge that the alliance or the cartel within it is responsible for frequent price hikes and sugar supply shortages in the country. Research design, data and methodology: We use a case study, qualitative document analysis design to trace how the alliance overcomes its various dependencies, and in doing so, how does it harm various stakeholder interests. Results: This paper finds that the sugar industry alliance maintains its bargaining power by manipulating sugar supply through horizontal alliances, political affiliations, underselling and under-reporting sugar stocks, purchasing sugarcane from the black market, and by gaining billions of rupees in export subsidies by hoarding stock and using its political connections. Conclusion: The paper concludes by providing a summary of the measures which the government has taken to curb this anticompetitive conduct; the most important of which is the removal of protectionist measures for sugar trade and allowing market forces to control the demand and supply of sugar in the local market.
Unbundled power quality service is paid much attention under the circumstances of deregulation and diversification of needs of customers for quality and price of electric power. Moreover, distributed generators (DGs) such as photovoltaic generations and wind turbines will be introduced to distribution system more and more, and reverse flow of active power has possibility to cause new problems in the distribution system such as voltage rise of distribution line and protection problem. Flexible, Reliable and Intelligent Electrical eNergy Delivery System, which is called FRIENDS, has been proposed as one of promising distribution system for such requirements, and intensive studies are under way. One of features of the system is introducing Quality Control Center (QCC) into the system for unbundled power quality service and easy installation of DGs. Two types of QCCs for such purposes are proposed, and simulation results are shown in this paper.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.8
/
pp.1504-1511
/
2009
By development of renewable energies and high-efficient facilities and deregulated electricity market, the operation cost of distributed generation(DG) becomes more competitive. The amount of distributed resource is considerably increasing in the distribution network consequently. Also, international environmental regulations of the leaking carbon become effective to keep pace with the global efforts for low-carbon paradigm. It contributes to spread out the business of DG. Therefore, the operator of DG is able to supply electric power to customers who are connected directly to DG as well as loads that are connected to entire network. In this situation, community energy system(CES) having DGs is recently a new participant in the energy market. DG's purchase price from the market is different from the DG's sales price to the market due to the transmission service charges and etc. Therefore, CES who owns DGs has to control the produced electric power per hourly period in order to maximize the profit. If there is no regulation for carbon emission(CE), the generators which get higher production than generation cost will hold a prominent position in a competitive price. However, considering the international environment regulation, CE newly will be an important element to decide the marginal cost of generators as well as the classified fuel unit cost and unit's efficiency. This paper will introduce the optimal operation of CES's DG connected to the distribution network considering CE. The purpose of optimization is to maximize the profit of CES and Particle Swarm Optimization (PSO) will be used to solve this problem. The optimal operation of DG represented in this paper is to be resource to CES and system operator for determining the decision making criteria.
Journal of Korean Society of Industrial and Systems Engineering
/
v.33
no.3
/
pp.10-21
/
2010
Promotion system can be used as strategical management weapon to enhance the sales power. Planned order system has some similarities with promotion system to create purchasing power and to supply the service parts with low price on purpose. The only difference is whether it is prearranged event or not. The effectiveness of forecasting has increased with normal state of ordering process. However, the accuracy of forecasting has diminished with irregular state of ordering, such as demand occurrences by unexpected climate change or intended planned order by the company. A planned order system is examined through the process of computing the effectiveness on the basis of forecasting in this paper. And it is suggested that how to increase the accuracy of forecasting capability under the planned order system.
Intensive competition in the electricity market and demand for higher quality service force the utilities to change their strategies in setting price and quality combination. As cost-up by homogeneously enhancing the electricity service quality may reduce their competitiveness, differential service is to be taken into consideration. Priority Service, which provides customers with a selection of service options at a range of prices and reliability for all or portions of their loads, has drawn attention from utilities in an increasingly competitive environment. Priority Service is to enlarge service options for customers who have diverse needs for supply reliability. This paper in the light of this point reviews differentiated strategy of power quality in the U.S.A.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.65
no.4
/
pp.285-291
/
2016
A light-emitting diode (LED) has been increasingly applied to various industrial fields and general lightings because of its high efficiency, low power consumption, environment-friendly characteristic and long lifetime. To drive the LED lighting, a power converter with the constant output current is needed. Among many power converters, the flyback converter is chosen by many converter designers due to high power density, structural simplicity, and miniaturization. In this converter, an electrolytic capacitor is generally chosen for the stabilization of the DC voltage because of having the large capacitance and the low price. However, the disadvantages are the short expected life time and 120Hz ripple currents on the converter output node. In this paper, a single-stage dimmable PFC DCM flyback converter without the electrolytic capacitor is proposed to prolong the lifetime of the LED driver. For the long lifetime of the converter, the polyester film capacitor with the small capacitance is substituted for the electrolytic capacitor on the output node and an LC resonant filter is added to damp 120Hz ripple current. The proposed converter is verified through the simulation and the experimental works.
There are many successful cases in power interconnection among European and South American countries. However, that is not the case in Northeast Asian countries. Even though there will be a considerable benefit in power interconnection in Northeast Asian countries, there will be some difficulties due to various interest relationship and constraints among countries in Northeast Asia. GTMax(Generation and Transmission Maximization) Program is a very useful tool to analyze competitive electricity market and power interconnection developed by Argonne National Laboratory under the Department of Energy in the USA. This study tried to verify applicability and usefulness by GTMax model to domestic electric power system and power transfer from Russia Far East by power interconnection. When the power by importing from Russia is 2,000MW(around 2% of domestic installed capacity in 2017), there is no impact on domestic electricity market because of small power transfer. The power by importing should be large enough for achieving greater cost reduction by power interconnection. Besides, it would be better to supply power to Kyung-In region directly in reducing overall cost when the power by importing from Russia are sold at low price. In the case of interconnecting Young-Dong region, if it is not possible to upgrade transmission line with power transfer capabilities between Young-Dong and Kyung-In region, then the power by importing from Russia can replace the power produced in Jung-Bu region and the relative benefit of importing power can be reduced.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.