KEPCO was operating power plants with diesel generators in 49 islands including Baekryeong-Do, and the generation capacity was about 66 MW in 2008. The cost of fuel is increasing by the international oil price inflation and continuous rise of oil price is predicted. For the stabilizing of electric power supply to the separate islands, renewable energy and fuel cell systems were considered. Hydrogen is made using renewable energy such as wind power and solar energy, and then a fuel cell system generates electricity with the stored hydrogen. Though the system efficiency is low, it is treated as the only way to secure the stable electric supply using renewable energy at this present. The analytic hierarchy process was used to select suitable candidate island for the system installation and 5 islands including Ulleung-Do were selected. Economic evaluation for the system composed of a kerosene generator, a wind power, an electrolysis, and a fuel cell system was conducted with levelized generation cost based on present value methode. As the result, the necessity of renewable energy combined generation system and micro grid composition in the candidated islands was confirmed. Henceforth, the development of an integration technology which connects micro grid to the total power grid will be needed.
Purpose - The purpose of this study was to investigate market power of soybeans exported by the United States to Korea. Particularly, this paper considered dichotomous characteristics of genetically modified (GM) soybeans and non-GM soybeans and conducted empirical analysis of these two segregated soybean markets to understand key tenets of market power in international soybean trade. Design/methodology - The difference in market power between GM and non-GM soybeans was analyzed using Residual Demand Elasticity (RDE) and Residual Supply Elasticity (RSE) models over the period of 2008~2018. RDE and RSE models under an imperfect competition condition were used to estimate market margins and determine whether GM and non-GM exporters or importers exercised market power in the destination market. Findings - Empirical results suggested that the U.S. had a market power on both GM and non-GM soybean exports. GM exports had greater market power than non-GM exports (14% vs. 9%). By contrast, Korea showed an inability to grab market margin or exert market power in soybean imports. Both export supply by the U.S. and import demand by Korea were found to be more responsive to price changes of GM soybeans than to prices changes of non-GM soybeans. This might be due to a self-interested, profit-seeking strategy by the exporter and many concerned consumers regarding potential adverse effects of GMOs in the importing country. Originality/value - This paper fills the literature gap by exploiting market power in both GM and non-GM markets with explicit consideration of price correlations between GM and non-GM soybeans in Korea. A number of existing studies have provided evidence for market power broadly embedded in international commodity trade. However, studies focusing on Korean markets are limited. No study has explored the country's soybean trade. Furthermore, the majority of prior studies have almost exclusively focused on the market power from a standpoint of exporting countries without discussing importers' market structure. This paper also sought to understand potentially distinguished patterns of market power between GM and non-GM markets.
This study analyzed the effect of power output reduction in coal fired power generation on the change of system marginal price and green house gas emissions. Analytical method was used for electricity market forecasting system used in korea state owned companies. Operating conditions of the power system was based on the the 7th Basic Plan for Electricity Demand and Supply. This as a reference, I analyzed change of system marginal price and green house gas emission by reduced power output in coal fired power generation. The results, if the maximum output was declined as 29 [%] to overall coal-fired power plant, system marginal price is reduced 12 [%p] compared to before and decreasing greenhouse gas emissions were 9,966 [kton]. And if the low efficiency coal fired power plant that accounted for 30 [%] in overall coal-fired power plant stopped by year, system marginal price is reduced 14 [%p] compared to before and decreasing greenhouse gas emissions were 12,874 [kton].
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.5
/
pp.667-679
/
2015
The bearer of the power sector's ETS compliance cost is power consumer for the following reasons. Firstly, power companies are constrained in establishing appropriate strategies to comply with ETS regulations due to the structural differences between the domestic power market and emission trading system. In other words, because power companies do not have a right to determine price and production of electricity, they have to compete with other companies under disadvantaged conditions in the emission trading market. Secondly, because ETS compliance cost is part of power production costs as it is also clearly written in the national greenhouse gas reduction road-map and the second energy supply plan, the cost should be included in power price following the power market operation rule. Thirdly, the most effective method to reduce carbon emissions in power sector is to reduce power demand, which is efficiently achieved through raising power price to a realistic level. Low power price in Korea is the major cause of rising power demand which is also the major cause of rising GHG emission. Therefore, power sector's ETS compliance cost should be included in power price to encourage power consumers' actions on reducing power consumption. Fourthly, when externality cost occurs in the process of delivering public services, usually beneficiary pay principle is applied to identify the cost bearer. Since electricity is one representative public good, the bearer of power sector's ETS compliance cost is power consumer.
Efforts are being made to respond to global warming. Interest in and demand for the private sector-led RE100 campaign is also increasing. Self-built solar power generation, one of the implementation tools for RE100, is not expanding. However, it can be an economical means of implementation in the long run. In this study, we intend to analyze the impact on the optimal ratio of self-solar power generation using HOMER simulation. OPR defines the optimal solar power generation ratio and looks into what changes there are in the optimal solar power ratio when self-power consumption increases and external power purchase price changes. As a result, the optimal rate of self-solar power generation has a low impact even if self-power consumption increases. As the external power unit price increases, the optimal ratio increases, and at a power unit price of 100 KRW/kWh, OPR is 24%; at 200 KRW/kWh OPR is 31%; and at 300 KRW/kWh OPR is 34%. This shows that the electricity price replaced during the life cycle has a high impact on the economic feasibility of solar power generation. However, when the external power unit price reached a certain level, the increase in OPR decreased. This shows that it is difficult for domestic companies to achieve RE100 based on the economic feasibility of solar energy alone. Therefore, efforts are needed to supply renewable energy in the public sector.
Cities around the world have paid attention to public transportation as an alternative to reducing traffic congestion caused by automobile usage, excessive energy consumption, and environmental pollution. This study measures accessibility to subway stations in Seoul using a supply-demand-based accessibility technique. Then, the impacts were analyzed through land prices by use and segment. As a result of analysis using the multilevel hedonic price models, accessibility considering both supply and demand for the subway had a positive effect on both residential and non-residential land prices. The effect was stronger for residential than for non-residential. Further, among the accessibility measured by the three functions, the accessibility by the Exponential function was most suitable for the residential land price, and the accessibility measured by the Power function for the non-residential land price had the highest explanatory power. Also, looking at the impacts by land price segments, it was found that higher access to metro stations had the greatest positive impacts on the most expensive segment of residential and non-residential land prices. The results of this study can be applied not only to identify the impacts of public investment on neighborhoods, but also to support real estate valuation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.11
/
pp.39-49
/
2011
Smart Grid has two main objectives on both supply and demand aspects which are to distribute the renewable energy sources on supply side and to develop realtime price responses on demand side. Renewable energy does not consume fossil fuels, therefore it improves the eco-friendliness and saves the cost of power system operation at the same time. Demand response increases the flexibility of the power system by mitigating the fluctuation from renewable energies, and reduces the capacity investment cost by shedding the peak load to off-peak periods. Currently Smart Grid technologies mainly focus on energy monitoring and display services but it has been proved that enabling technologies can induce the higher demand responses through many pilot projects in USA. On this context, this paper provides a price responsive algorithm for HEMS (home energy management system) on the real time pricing environment. This paper identifies the demand response as a core function of HEMS and classifies the demand into 3 categories of fixed, transferable, and realtime responsive loads which are coordinated and operated for the utility maximization or cost minimization with the optimal usage combination of three kinds of demand.
Kim, J.T.;Chang, H.S.;Kim, D.K.;Kim, Y.D.;Kim, D.Y.
Proceedings of the Korean Society for Technology of Plasticity Conference
/
2007.05a
/
pp.38-41
/
2007
The increase of $CO_2$ emission by increasing of fossil fuel usage has been understood a major cause of global warming. The supply of electric energy is heavily dependent on the massive thermal power and nuclear power plant before developing the renewable energy to supply the electric energy stably at a low price. The large and sound forged components of pressure vessel, turbine and generator are widely used in power plant such as wind power, hydroelectric power generation, nuclear power and thermal power plant. This paper is discussed the trend of manufacturing technology for pressure vessel and turbine to satisfy the required condition of utility company. It is also introduced a strategy of forging industry to cope with carbon tax.
Journal of the Korean Data and Information Science Society
/
v.20
no.2
/
pp.283-292
/
2009
Recently the stable electric power supply is threaten by the rapid development of all the industries consuming a lot of electric power, thus KEPCO is trying to establish the countermeasures to cope with this circumstance of uprising power consumption by running the efficient and flexible 12-month s price policy for the base price and raisin the electric power price remarkably in peak power consumption period to suppress the maximal power demand of consumers. To resolve these problems, this study propose the method calculating hourly CBL based on the hourly amount at non-event using the pattern of the amount of power consumption and propose the operation method of DR Program.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.6
/
pp.191-196
/
2019
In the case of urban railway facilities, the power supply should be maintained for the safe movement of passengers in communication facilities, disaster prevention facilities and boarding area security because of the confusion when power supply is cut off due to the nature of public transportation. In addition, considering that the number of trains is running on the urban railway line, it is necessary to operate at least 30 minutes for the bus stop and at least 1 hour for the communication and disaster prevention facilities. Therefore, it is essential to supply emergency power source to maintain stable operation of induction lamp and smoke exhaust system because main power is cut off in order to prevent further spread due to fire in case of the history of urban railway section or vehicle fires. Recently, UPS(Uninterruptible Power Supply) function to prevent power outage in emergency, emergency power generation combined with ESS function which saves electricity at nighttime price time, A hybrid power storage system with a UPS function.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.