• 제목/요약/키워드: Power performance test

검색결과 2,648건 처리시간 0.03초

진공차단기용 전자식 보조접점 컨트롤러 개발 및 성능인증시험에 관한 연구 (A Study on the Development of Controller which is used Electric Operating Cell(EOC) for Vacuum Circuit Breaker and the Controller Performance Certification Test)

  • 이기선;박정철;추순남
    • 전기학회논문지P
    • /
    • 제64권3호
    • /
    • pp.130-137
    • /
    • 2015
  • This study is about the controller development of the Electric Operating Cell(EOC) which will replace the Mechanical Operated Cell(MOC) of the vacuum circuit breaker which has been used in the power plant and the performance test for the developed controller. The controller developed through this study was manufactured considering the harsh installation environment and electrical condition of the power plant, and the controller performance certification test for confirming the product reliability was taken to know whether or not to withstand fully in various electrical and mechanical problems. Items for performance certification test were AC power frequency voltage withstand test, combined surge immunity test, 1 [MHz] oscillatory SWC test, fast transient SWC test, radiated electromagnetic interference test, vibration test. As a result, all tests has passed an examination without malfunction.

Insulation Design and Reliability Evaluation of ±80kV HVDC XLPE Cables

  • Jung, Chae-Kyun;Park, Hung-Sok;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권3호
    • /
    • pp.1002-1008
    • /
    • 2014
  • This paper describes insulation design and its reliability evaluation of ${\pm}80kV$ HVDC XLPE cable. Recently, the construction of HVDC transmission system, which is combined overhead line with underground cable, has been completed. This system is installed with existing 154 kV AC transmission line on the same tower. In this paper, the lightning transient analysis is firstly reviewed for selection of basic impulse insulation level and nominal insulation thickness. Then the electrical performance tests including load cycle test and superimposed impulse test based on CIGRE TB 496 are performed to evaluate the reliability of newly designed HVDC cable. There is no breakdown for ${\pm}80kV$ HVDC XLPE cable during electrical performance test. Finally, this system is installed in Jeju island based on successful electrical performance test (Type test). After installation tests are also successfully completed.

30kW급 ESS용 이동형 성능평가 시험장치의 구현 및 특성분석 (Characteristic Analysis and Implementation of 30kW Portable Test Equipment for Performance Evaluation in Energy Storage System)

  • 박재범;김미성;노대석
    • 전기학회논문지
    • /
    • 제67권6호
    • /
    • pp.715-723
    • /
    • 2018
  • The energy storage system consists of batteries, power conditioning system and energy management system. If ESS is installed and operated in the field, SAT(Site Acceptance Test) of ESS is being essentially required for the safety and performance of ESS. Furthermore, in order to more accurately and reliably validate the performance of the ESS in advanced countries, it has been required to perform not only performance testing by H/W equipments but also performance verification by S/W tool. Therefore, this paper proposes the modeling of portable test equipment in order to evaluate the performance and reliability of ESS by using the PSCAD/EMTDC S/W. And also, the prototype of 30[kW] scaled portable test equipments is implemented based on the S/W modeling. From the results of various simulations and testings such as power quality, LVRT and anti-islanding tests, it is confirmed that 30[kW] scaled portable test equipment is useful for SAT of ESS, because the simulation results of PSCAD/EMTDC are identical to them of 30[kW] test equipment at the same test conditions.

태양광발전용 인버터 보호기능시험 성능평가 (Performance Evaluation with Protective Function test of Inverter for Solar Power Generation)

  • 윤용호
    • 전기학회논문지
    • /
    • 제67권11호
    • /
    • pp.1570-1575
    • /
    • 2018
  • The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. This paper describes domestic technical standard of Photovoltaic(PV) PCS(Power Conditioning Systems)- Characteristics of the utility interface. Especially protective function test items of 1) Output overvoltage protection test, 2) Output undervoltage protection test, 3) Frequency rise protection test, 4) Frequency fall protection test, 5) System voltage's momentary interruptions, 6) System voltage distortion capability test. Therefore in this paper protective function test item of facilities evaluation detailed standards for new renewable energy, small, medium and large photovoltaic inverter standard is studied and analyzed and finally full tested by PV inverter performance function.

RTDS를 이용한 PSS 현장 설치 모의 시험 (The trial installation test of PSS to Power Plant using Real Time Digital Simulator)

  • 허진;김동준;문영환;신정훈;김태균
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.59-62
    • /
    • 2002
  • Before a developed digital Power System Stabilizer(PSS) is installed to real power system, an efficient trial test for installing PSS is needed. In this paper, the performance of developed digital PSS for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator(RTDS) in order to install PSS to real power system practically. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS and the test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The trial installation test through AVR 3% step test and three fault analysis may be guaranteed to install PSS to real power system.

  • PDF

3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구 (Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System)

  • 우상우;이기학;이상일;박종포
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.35.2-35.2
    • /
    • 2011
  • A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO's Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

  • PDF

복합화력의 냉각수 배열회수를 위한 히트펌프의 성능평가 사례 분석 (Analysis of the Performance Test Results of a Heat Pump for Closed Cooling Water Heat Recovery on a Combined Thermal Power Plant)

  • 이성호
    • 설비공학논문집
    • /
    • 제26권11호
    • /
    • pp.541-546
    • /
    • 2014
  • The present study was conducted to determine whether ESCO Business is success or not. ESCO Business recovers the investment costs by the energy savings resulting from complementing existing energy facilities. The guaranteed parameters are Quantity of Heat Recovery, and Generator output drop. The results of the Performance Test show that the Quantity of Heat Recovery increased by 11.52 Gcal/h, and Generator output decreased by 0.234 MW, which satisfied the guarantee value.

소형 축류터빈의 상온 성능시험기 개발 (Development of a Test Facility for Cold-air Performance of Small Axial Turbine)

  • 손창민;차봉준;이대성
    • 대한기계학회논문집
    • /
    • 제19권7호
    • /
    • pp.1780-1786
    • /
    • 1995
  • The main goal of the present study is to establish the techniques and methodolgies of turbine performance test through evaluating the objective turbine test piece, and checking the reliability of the self-developed test facility by performing a series of turbine tests under ambient temperature condition. A high speed coupling, a lubrication system and a test bed of the test facility were modified through a series of preliminary test in order to reduce the vibration and oil leakage. The flowrate control of the test facility and data acquisition were accomplished by using a software called "Labview" The measurement of shaft horse power and control of rotational speed according to the conditions of turbine rotation were performed by a separate system. The preliminary evaluation of the measured data suggests that the developed test facility and the test technique can be used reliably for the performance test of turbines with the minor improvement.provement.

실시간 대규모 전력계통 해석용 시뮬레이터(KEPS)를 이용한 국산 디지털 PSS의 성능 시험 (The Performance Test of Digital PSS Using KEPCO Enhanced Pourer System Simulator(KEPS))

  • 신정훈;김태균;추진부;백영식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권12호
    • /
    • pp.611-623
    • /
    • 2002
  • This paper introduce the real time digital simulator which is located in Korea Electric Power Research Institute. This paper also describes the methodology for the performance test of the PSS using KEPS. This test is to get a high degree of the confidence of the developed PSS before it is installed into the real power system. This has been performed in the form of closed-loop tests in which Simulator and PSS are connected and signals come and back interactively. Many tests have successfully done using KEPS which consists of 26 RTDS racks, under the large-scale power system. The simulated reduced KEPCO power system contains 88 generators and 295 buses. Through the AVR step, three phase fault and active power variation test, the effectiveness of developed PSS has been proved. This paper also presents the overview of KEPS and hardware of protype PSS.

U50 풍력발전기 출력성능 실증연구 (The Field Test of Power Performance Measurement for U50 Wind Turbine)

  • 황진수;장성태;김대현;방조혁;류지윤
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 추계학술대회 논문집
    • /
    • pp.372-375
    • /
    • 2007
  • 750kW gearless type wind turbine, named U50, is developed by UNISON in Korea. The newly developed wind turbine should be evaluated the power curve and the estimated annual energy production by following international standard to verify the power performance characteristics. This paper shows the test and evaluation procedure according to IEC 61400-12-1 which specifies a procedure of measuring the power performance characteristics of a single wind turbine and applies to the testing of wind turbines of all types and sized connected to the electrical power network. And this paper also shows the power performance characteristics for U50 wind turbine which is determined in accordance with IEC regulation.

  • PDF