• 제목/요약/키워드: Power performance test

검색결과 2,648건 처리시간 0.034초

크로스핏 파워 트레이닝이 TPI OnBaseU Power Test와 골프 수행력에 미치는 영향 (Effect of CrossFit Power Training on TPI OnBaseU Power Test and Golf Performance)

  • Chang Wook Kim
    • 한국운동역학회지
    • /
    • 제33권4호
    • /
    • pp.185-195
    • /
    • 2023
  • Objective: The purpose of this study is to improve TPI OnBaseU Power Test and golf performance by conducting CrossFit power training. Method: Three male golf players from University B participated in this study. They had 3 to 4 years of golf experience and participated in 8 weeks of CrossFit power training. Results: OnBaseU Power Test: There was a lot of improvement in Sit up throw (27.9%) and Chest pass (10.58%), but there was not much improvement in Baseline Toss (R5.9, L9.8%) and Vertical Jump (4.1%). Golf shot data: There was a very statistically significant difference in Club speed, Ball speed, and Total Length, which are related to speed, and there was no difference in Club path and Smash factor, which are related to accuracy and posture. Conclusion: CrossFit power training was effective in improving TPI OnBaseU Power Test and golf performance (Club speed, Ball speed, Total Length).

발전설비의 성능진단 적용 무선계측 기술 (Wireless Measurement Technology for Power Plant Performance Diagnosis)

  • 김의환;이응곤;홍은기
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권1호
    • /
    • pp.9-16
    • /
    • 2017
  • The performance test is conducted for the purpose of determining the accurate thermal performance of the power generation facility or deriving the factors of thermal efficiency degradation. Compared to the acquisition method of power plant thermal performance test data by compensating cable or transmission cable, performance test using wireless instrument can acquire digital data in order to shorten the period due to installation and demolition of instrument and enhance safety of workers and relatively accurate data can be acquired thereby improving work efficiency. Wireless instruments have already been introduced to the market a long time ago, and some of them are used in industry such as petrochemical industry. However, there is no example which has been conducted for performance test of power generation facilities. In order to apply power generation facilities, a reliable system capable of acquiring performance data smoothly without affecting the control system is required. The wireless measurement system can eliminate the measurement defects and errors such as the damage due to the movement of the connecting cable, the extension due to the extension of the shield wire, the contact failure at the contact point between the measuring sensor and the connecting wire, This method has the advantage of collecting relatively accurate performance test data.

풍력발전기 출력성능 평가에 대한 연구 (The Study about Performance Test of Wind turbine)

  • 고석환;장문석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1348-1349
    • /
    • 2011
  • In this paper, The case of power performance test for 3MW wind-turbine system is introduced. For the verification of power curve and the certification of wind-turbine, power performance test is very important. This paper described the power testing results of a 3MW wind turbine and analysed an uncertainty about the testing. The measured power curves are very closely coincide with the calculated. Total uncertainty of measured data for Power Curve is 120~200kW in the rated power.

  • PDF

유럽과 한국의 이륜차 엔진 성능 시험 규정에 대한 비교 연구 (A Comparison Study on the Engine Performance Test Regulation of Two-wheeled Vehicles between EU and Korea)

  • 이광구;용기중
    • 자동차안전학회지
    • /
    • 제8권3호
    • /
    • pp.22-27
    • /
    • 2016
  • As a preliminary research to provide amendment for the engine performance test regulation of two-wheeled vehicles, the engine performance data are investigated in terms of maximum torque, rated power, and engine speed of motorcycles on sales in Korean market. Based on the engine performance database officially published to consumers, some forecasted problems are discussed when the maximum torque and the rated power are measured under the present test standards. EU and Korea regulations on engine performance test are carefully compared in terms of the accuracy of measurement devices, test procedures including data acquisition method, and allowable range of rated power measurement. Complementary items are discussed to eliminate ambiguities in the present regulation and to construct rational regulation system.

해양소수력발전소 튜블러 수차 성능평가를 위한 현장시험 (Field Test for Performance Evaluation of a Tubular Turbine in Marine Small Hydro Power Plant)

  • 황영호;이영호;최영도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1070-1077
    • /
    • 2011
  • 본 연구는 해양소수력발전소에서의 튜블러 수차의 성능평가를 위한 현장시험 및 그 결과에 대한 내용을 포함하고 있다. 현장시험용 수차의 발전기 최소출력은 측정된 유효낙차, 출력 그리고 효율을 이용하여 검토되었다. 정격 및 최대 출력시험은 수차 설치현장의 조수간만의 차에 의한 영으로 인하여 동일한 실험조건을 확보할 수 없었기 때문에 모델시험에 의한 성능 데이터를 이용하여 환산된 값을 사용하였다. 현장시험에 의한 수차의 성능은 최소출력, 정격출력, 최대출력 운전점에서 보증출력 및 보증효율을 만족시키는 결과를 나타냄을 확인하였다.

원자력발전소 직류전원계통용 축전지 성능시험 분석 (Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant)

  • 김대식;차한주
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

FMEA를 활용한 재제조 파워스티어링 오일펌프 시험법에 대한 최적화 연구 (The Optimization Study on the Test Method of Remanufactured Power Steering Oil Pump by Using FMEA)

  • 서영교;정도현;유상석;나완용
    • 한국자동차공학회논문집
    • /
    • 제24권1호
    • /
    • pp.90-98
    • /
    • 2016
  • Currently government certified test method for an automobile remanufactured products is insufficient. Thus many automotive parts in the remanufacturing market are lacking proper evaluation criteria and production of defective products are causing customer dissatisfaction. In this paper a power steering oil pump, which requires stringent manufacturing standards, is studied by the failure mode and effect analysis approach. The research suggested that the test criteria such as discharge flow characteristic test, tightness test, pulley run-out test, pressure switch operation test, low temperature test and rotation pressure durability test should be performed to evaluate the reliability of remanufactured power steering oil pumps. As a result of tests, the performance of remanufactured power steering oil pump satisfied the evaluation criteria of pressure switch operation test and low temperature test. However, the remanufactured power steering oil pump failed to satisfy the evaluation criteria on discharge performance test, tightness test and pulley run-out test. These performance evaluation tests proved the necessity of standard process for the remanufactured power steering oil pump.

Plant Minimum Stable Load (Pmin) Test for Ilijan CCPP

  • Kim, Si Moon;Yun, Wan No;Jang, Cheol Ho;Park, Se Ik
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권1호
    • /
    • pp.83-88
    • /
    • 2016
  • This paper describes the test results of plant minimum stable load (Pmin) for Ilijan Power Plant. The test was conducted on May 13 through 14, 2015 to investigate the plant operating and equipment condition in accordance with "Ilijan Plant Performance Test Procedure on Plant Minimum Stable Load" [1]. This paper also contains the assessment of the impact of Pmin to plant operating parameters and possible technical operating issues when operating at lower loads and to recommend the safe minimum load operation of Ilijan per block. In addition, this paper describes the performance calculation results of efficiency and heat rate depending on the load level.

소형 풍력발전시스템의 출력성능검사 (Power performance Testing of Small Wind Turbine Generator System)

  • 김현기;김병민;유능수
    • 산업기술연구
    • /
    • 제31권A호
    • /
    • pp.123-128
    • /
    • 2011
  • In this study, procedures, a power performance testing system of Wind Turbine System Research Center of Kangwon National University is introduced. Test prodedures and results are presented on a stand-alone vertical-axis 200W wind turbine manufactured by Geum-Poong Energy Inc.. Power performance test is performed according to IEC standard. The test results are compared with the power performance standard. Also, the effects of normalization and disturbed sectors are considered.

  • PDF

해외 수력발전설비 성능평가설비 및 평가 방법 (Performance evaluation facilities and evaluation methods for hydropower equipment)

  • 김영준;김용열;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.194-194
    • /
    • 2010
  • The variable demand on the energy market, as well as the limited energy storage capabilities, requires a great flexibility in operating hydraulic turbines. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and/or maximum steady-state runaway speed, as well as guarantees related to cavitation. Performance test are conducted by the test standard. Test codes based on extensive research data are written under the leadership of an IEC. Performance evaluation is carry out several test(performance test, cavitation test and runaway test). The paper presents the international turbine test laboratory and performance test standard.

  • PDF