• Title/Summary/Keyword: Power generation project

Search Result 172, Processing Time 0.025 seconds

PROJECT MANAGEMENT FOR ENERGY MANAGEMENT SYSTEMS (에너지 관리(管理)시스템의 사업관리(事業管理))

  • Lee, Kyu-Sun;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1983.07a
    • /
    • pp.174-176
    • /
    • 1983
  • This paper explains about general considerations and project management for a modern electric utility EMS/SCADA system. This paper also attempts to help engineers in the following situation: They are given the task of specifying, buying and installing a EMS/SCADA system. When do they start? What tools/texts/guidelines are available to help them out? If it is a large system, methodical project management is necessary. What are the critical tasks to be undertaken? When should they been done and how does their timing impact the whole project.

  • PDF

Constitution and Operation of a Molten Carbonate Fuel Cell System (용융탄산염형 연료전지 발전시스템 구성 및 운전)

  • Ahn, Kyo-Sang;Kim, Dong-Hyung;Seol, Jin-Ho;Lim, Hee-Chun
    • Proceedings of the KIEE Conference
    • /
    • 1997.07a
    • /
    • pp.100-103
    • /
    • 1997
  • Korea Electric Power Corporation (KEPCO) started a fuel cell project to develop alternative sources of electric power because of the rapid increase in power demand and global environmental problems. For the development of a molten carbonate fuel cell (MCFC), KEPCO started the project in 1993 to develop a 2 kW MCFC system and finished it at the end of 1996. In this project, $ASPEN^+$ was utilized to design the 2 kW MCFC generation system. Based on this simulation, a power generation system was designed and installed for operation and a long term test of internally manifolded 2 kW class MCFC stack. This stack has 20 cells with an effective electrode area of $1000\;cm^2$. It was run at 0.84 V and $150\;mA/cm^2$ and was operated for more than 3,250 hours continuously. This paper describes the system configuration and its control and measurement units. An analysis of the stack performance, the effect of gas utilization ratio, and the stack performance requirements are also discussed.

  • PDF

The Development and Application of a Training Base for the Installation and Adjustment of Photovoltaic Power Generation Systems

  • Chuanqing, SUN
    • International Journal of Advanced Culture Technology
    • /
    • v.4 no.1
    • /
    • pp.37-50
    • /
    • 2016
  • In recent years, the development and application of green energy resources have attracted more and more /$^*$ 'tention of people. The training room presented here is focused on the terminal applications of a photovoltaic power generation system (PPGS). Through introducing the composition and the general design principles, we aimed at leading the students to master the fundamental skills required for its design, installation and construction. The training room consists of numerous platforms, such as: PPGS, Wind and Photovoltaic Hybrid Power Generation Systems, Wind Power Generation Equipments, Simulative Grid-Connected Power Generation System, Electronic Technology Application of New Energy, etc. This enables the students to obtain their project and professional skills training via assembling, adjusting, maintaining and inspecting, etc., various component parts of the photovoltaic and new energy power generation systems, to further grasp the fundamental and related theoretical knowledge, and to further reinforce their practical and operational skills, so as to improve their problem-analyzing and problem-solving abilities.

Designing Study on Techno-Economic Assessment of Solar Photovoltaic Mini-Grid Project in Nepal

  • Poudel, Prasis;Bae, Sang-Hyun;Jang, Bongseog
    • Journal of Integrative Natural Science
    • /
    • v.15 no.2
    • /
    • pp.89-97
    • /
    • 2022
  • This paper presents the comprehensive feasibility study of solar mini-grid project located in Bajhang District, Sudur Paschim Province, Nepal. The study has been conducted with the aim of developing a suitable size solar mini-grid system to meet electricity demand of proposed settlements of the village people. The study forecasts that the estimated average daily peak power consumption of load is about 20kW and average daily energy demand of load is about 100-150kWh/day in the base year 2022. The shared ratio of productive end uses is about 25% of the total power consumption and about 27% of the total energy demand, which will be used for small business/income generation activities and required 45kWp size solar power generation mini-grid system. The estimated project cost for the proposed 45kW solar mini-grid system technology, including 3 years of operation & maintenance, as well as power distribution network up to end user's premises is about 0.24 million USD. It is concluded that 45kWp photovoltaic mini-grid is feasible for the location.

High Efficient Inductive Power Supply System Implemented for On Line Electric Vehicles

  • Huh, Jin;Park, Eun-Ha;Jung, Gu-Ho;Rim, Chun-Taek
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.105-110
    • /
    • 2009
  • The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.

  • PDF

DATA LINKS BETWEEN EMS AND SCADA SYSTEMS (EMS - SCADA 자료연계)

  • Lee, Kyung-Jae;Yu, Sung-Chul;Kim, Yeong-Han;Lee, Hyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.109-113
    • /
    • 1987
  • This paper briefly introduces a strategy of data links between EMS and SCADA systems for the KEPCO's EMS project. For the data links, front end/communication processors are adopted that provide for protocol conversion and communication processing in parallel with EMS/SCADA processing. The data link configuration for a communication channel is point to point links. The EMS - hardware and software - has capability of handling links utilizing both bisync protocol and X.25 (Level 1 and 2)protocol for the data link protocol.

  • PDF

Demonstration Research of Photovoltaic System with Solar Reflectors (반사판을 이용한 태양광발전시스템 실증연구)

  • Kim, Yong-Sik;Kang, Gi-Hwan;Sim, Sang-Yong;Lee, Hoo-Rock;Lee, Jin-Seob;Hong, Jin-Ki
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.1
    • /
    • pp.64-69
    • /
    • 2009
  • This paper aims at enhancing the electric production efficiency of photovoltaic(PV) system. The electrical power of PV system is proportional to light intensity on a PV module surface. In this paper, we apply two types of systems to enhance power generation efficiency. First, of all, concentring sunlight using specular surface and one-axis tracking system which traces the sun with vertical direction are applied in this project. From this, we analyze the fixed type method and power generation efficiency.

Real Option Valuation of a Wind Power Project Based on the Volatilities of Electricity Generation, Tariff and Long Term Interest Rate (발전량, 가격, 장기금리 변동성을 기초로 한 풍력발전사업의 실물옵션 가치평가)

  • Kim, Youngkyung;Chang, Byungman
    • New & Renewable Energy
    • /
    • v.10 no.1
    • /
    • pp.41-49
    • /
    • 2014
  • For a proper valuation of wind power project, it is necessary to consider volatilities of key parameters such as annual energy production, electricity sales price, and long term interest rate. Real option methodology allows to calculate option values of these parameters. Volatilities to be considered in wind project valuation are 1) annual energy production (AEP) estimation due to meteorological variation and estimation errors in wind speed distribution, 2) changes in system marginal price (SMP), and 3) interest rate fluctuation of project financing which provides refinancing option to be exercised during a loan tenor for commercial scale projects. Real option valuation turns out to be more than half of the sales value based on a case study for a FIT scheme wind project that was sold to a financial investor.

Tidal Current Power Generation by a Darrieus Type Water Turbine at the Side of a Bridge Pier

  • Kyozuka, Yusaku;Wakahama, Hisanori
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.99-104
    • /
    • 2006
  • There are several advantages to make use of a bridge pier for the tidal power generation. Current velocity increases near the pier, therefore the tidal power generation becomes more efficient because the power is proportional to the cubic of the current velocity. The pier is convenient for access and maintenance of the hydraulic turbine and the power unit. The project is now underway at the Ikitsuki Bridge in Tatsuno-Seto Strait of Nasasaki Prefecture, where the tidal current was measured by the bottom mount ADCP for almost one year. Model experiments for a Darrieus water turbine with two and three straight blades were carried out in the circulating water channel, in which the power coefficients of the turbine were obtained as a function of blade section and the attaching angle of a blade to the rotor. Those experimental results are discussed to obtain an optimum Darrieus turbine for tidal power generation.

  • PDF

A Study on Renewable Energy Profit-Sharing Method for Improving Residential Conditions in Rural Area - Focused on the Smart Green Village in Cheorwon-gun, Gangwon-do Province - (농촌지역 정주여건 향상을 위한 재생에너지 이익공유 방식에 관한 연구 - 강원도 철원군 스마트그린빌리지를 중심으로 -)

  • Yoo, Byung-Chun;Lee, Dong-Hee;Kim, Jung-Uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.1
    • /
    • pp.9-18
    • /
    • 2021
  • In this study, surveys and data collection on new profit-sharing measures were carried out in order to improve the residential environment and residents' participation in 65 MW large-scale solar power complex located at Munhye 5-ri, Galmal-eup, Cheorwon-gun, Gangwon-do province. From May to September 2018, the presentation and meetings for residents were held and a survey for 67 households were carried out in order to collect profit-sharing data which is sharing profits from solar power project improving residential environment. The results of the survey shows that it needs to improve some obstacles of residential environment in rural areas, such as improvement of living infrastructure at village level, improvement of monotonous leisure activities from the residents' point of view, improvement of economic income sources depending on farm income and Basic Old-age Pensions, inconvenience factors in the unsuitable residential environment due to aging. Based on these findings, this paper suggests that Profit-Sharing solar power complex project has possibilities to improve living environment in rural areas by sharing profits from power generation and residents participating in the project with consensus for need of renewable energy.