• 제목/요약/키워드: Power farm

검색결과 530건 처리시간 0.035초

The Analysis of Active Power Control Requirements in the Selected Grid Codes for Wind Farm

  • Kim, Mi-Young;Song, Yong-Un
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권4호
    • /
    • pp.1408-1414
    • /
    • 2015
  • The renewable energies such as photovoltaic power, wind power and biomass have grown to a greater extent as decarbonization techniques. The renewable energies are interconnected to power systems (or electrical grids) in order to increase benefits from economies of scale, and the extra attention is focused on the Grid Code. A grid code defines technical parameters that power plants must meet to ensure functions of power systems, and the grid code determined by considering power system characteristics is various across the country. Some TSO (Transmission System Operator) and ISO (Independent System Operator) have issued grid code for wind power and the special requirements for offshore wind farm. The main purpose of the above grid code is that wind farm in power systems has to act as the existing power plants. Therefore wind farm developer and wind turbine manufacturer have great difficulty in grasping and meeting grid code requirements. This paper presents the basic understanding for grid codes of developed countries in the wind power and trends of those technical requirements. Moreover, in grid code viewpoint, the active power control of wind power is also discussed in details.

풍력발전단지 보호를 위한 내외부 고장 판별 알고리즘 (A Protection Algorithm Discriminating Between Internal and External Faults for Wind Farms)

  • 권영진;강상희
    • 전기학회논문지
    • /
    • 제56권5호
    • /
    • pp.854-859
    • /
    • 2007
  • A wind farm consists of many wind generator(WG)s therefore, it is generally a complex power system. A wind farm as a distributed generation(DG) affects utility power system. If a conventional protection schemes are applied, it is difficult to detect faults correctly and the schemes can't provide proper coordination in some cases. This paper presents a protection algorithm for a wind farm which consists of a looped collection circuit. Because the proposed algorithm can distinguish between an internal fault and an external fault in a wind farm, The proposed algorithm can disconnect the faulted section in a wind farm. This algorithm is based on an overcurrent protection technique with the change of the ratio of the output current of a generator to the current of the looped line connected to each generator to collect the each generator's power. In addition, operating time of the algorithm is shortened by using the voltage drop at a generator collection point. The performance of the proposed algorithm was verified under various fault conditions using PSCAD/EMTDC simulations.

Critical Short Circuit Ratio Analysis on DFIG Wind Farm with Vector Power Control and Synchronized Control

  • Hong, Min;Xin, Huanhai;Liu, Weidong;Xu, Qian;Zheng, Taiying;Gan, Deqiang
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권2호
    • /
    • pp.320-328
    • /
    • 2016
  • The introduction of renewable energy sources into the AC grid can change and weaken the strength of the grid, which will in turn affect the stability and robustness of the doubly-fed induction generator (DFIG) wind farm. When integrated with weak grids, the DFIG wind turbine with vector power control often suffers from poor performance and robustness, while the DFIG wind turbine with synchronized control provides better stability. This paper investigates the critical short circuit ratios of DFIG wind turbine with vector power control and synchronized control, to analyze the stability boundary of the DFIG wind turbine. Frequency domain methods based on sensitivity and complementary sensitivity of transfer matrix are used to investigate the stability boundary conditions. The critical capacity of DFIG wind farm with conventional vector power control at a certain point of common coupling (PCC) is obtained and is further increased by employing synchronized control properly. The stability boundary is validated by electromagnetic transient simulation of an offshore wind farm connected to a real regional grid.

풍력발전에 적합한 기본풍속 연구 (Study on Basic Wind Speed Suiteable for Wind Power Development)

  • 김정환;정호성;김형준;한정헌;박선규;최진웅
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 추계학술대회 초록집
    • /
    • pp.189.1-189.1
    • /
    • 2010
  • The wind farm where the wind velocity condition is excellent and economical can be established to produce power with the multiple wind power turbine. The wind velocity which is suitable to Wind Power Development must be evaluated for searching the economical wind farm on planning the wind farm. In this paper, based on wind speed data at 24 locations in Korea from 1971 through 2009, the basic wind velocity which can be applied to designing wind power development is estimated using the statiscal process. The wind velocity which is measured from observation stations is revised according to wind gauge's height and Circumferential environment. The wind speeds for 200 year's return period in 24 locations are determined using the Gumbel's distribution.

  • PDF

유.무효 전력 제어를 통한 풍력발전단지의 효율적인 운전 (A Study on Active and Reactive Power Control for Efficient Operations of Wind Farm)

  • 장성일;김지원;김광호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1351-1354
    • /
    • 2002
  • Wind farm which are composed with wind turbine generators can be a good alternatives to solve environmental problem and solutions to cope with energy crisis for using wind energy. Until now, these wind turbine generators have been being studied on the viewpoint of only active power control for reducing the burden of main grid. In this control scheme, we might demand a reactive power compensator in order to make reparation for the reactive power produced from wind turbine generator itself. Therefore, if the reactive power as well as active power of wind turbine generator were controlled according to the demand of reactive power, the installation of a additional reactive power compensator could be reduced. This paper presents the control method of a active and reactive power for wind turbine generators by means of SVPWM(Space Vector Pulse Width Modulation) inverting method and describes a operational coordination of wind turbine generators. The proposed power control algorithm can simply produce the output power of wind turbine generator needed in wind farm, which can reduce the power of main grid more and exclude a supplementary reactive power compensator. We assumed that wind farm are composed with two kinds of wind turbine generators, AC/DC/AC and induction generator types.

  • PDF

풍력전단지의 계통 연계 운전에 따른 보호 계전기 설정치 정정에 관한 고찰 (The Study on Correction of Protective Relaying Set Value for the Power Electric Network Paralleled with Wind Farm)

  • 장성일;최돈만;최정환;김광호;오종률;김주열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.487-490
    • /
    • 2002
  • Wind farm paralleled with electric power network can supply the power into a power network not only the normal conditions, but also the fault conditions of distribution network. If the fault happened in the power line with wind farm, the fault current level measured in a relaying point might be lower than that of distribution network without wind turbine generator. Consequently, it is difficult to detect the fault happened in the distribution network connected with wind generator. This paper describes the influence of wind turbine generator on the protective relaying system for detecting the fault occurred in a power line network. Simulation results shows that the fault current depends on the fault impedance, location, and the capacity of wind farm and distribution network load.

  • PDF

이중 여자 비동기 발전기를 포함한 풍력단지 시모의 해석 (Time Domain Simulation Analysis For Wind Farm with DFAG)

  • 조성구;송화창;이장호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 추계학술대회 논문집
    • /
    • pp.439-442
    • /
    • 2009
  • As a result of increasing environmental concern, the penetration of renewable power on power systems is now increasing. Wind energy can be considered as the most economical energy sources to generate electricity without depletion of fossil fuel. The penetration of wind energy from wind farm is getting larger and larger, so we need adequate control strategies for wind farm. To devise adequate control strategies for wind farm, time domain simulation analysis needs to be performed. This presents a Simultaneous Implicit-based time domain simulation algorithm for wind farm with DFAG (Doubly Fed Asynchronous generator) connected to the external power systems. This paper shows an illustrative example with a 5-bus test system.

  • PDF

풍력단지의 발전량 추계적 모형 제안에 관한 연구 (Development of a Stochastic Model for Wind Power Production)

  • 류종현;최동구
    • 경영과학
    • /
    • 제33권1호
    • /
    • pp.35-47
    • /
    • 2016
  • Generation of electricity using wind power has received considerable attention worldwide in recent years mainly due to its minimal environmental impact. However, volatility of wind power production causes additional problems to provide reliable electricity to an electrical grid regarding power system operations, power system planning, and wind farm operations. Those problems require appropriate stochastic models for the electricity generation output of wind power. In this study, we review previous literatures for developing the stochastic model for the wind power generation, and propose a systematic procedure for developing a stochastic model. This procedure shows a way to build an ARIMA model of volatile wind power generation using historical data, and we suggest some important considerations. In addition, we apply this procedure into a case study for a wind farm in the Republic of Korea, Shinan wind farm, and shows that our proposed model is helpful for capturing the volatility of wind power generation.

국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정 (Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula)

  • 김지영;강금석;오기용;이준신;유무성
    • 신재생에너지
    • /
    • 제5권2호
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

대형 풍력 농장에 대한 AC 전력시스템 모델링 개발 (The AC Power System Development For the Big Wind Farm)

  • 장수;최준호;손계도;조정섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.300-302
    • /
    • 2008
  • This paper will discuss the steps in building a wind farm and the modelling of AC power system for wind power generation. And take the JeJu island for an example, with its good wind power energy resource, the most important factor for a wind farm is a good power system interconnection to decrease the power loss including the transmission loss as less as possible. So in this paper, after the JEJU wind energy analysis, we will mainly discuss the development of the modelling on JEJU AC power system by using PSCAD. And also for using the real data of the wind power in the simulation, the modelling of the JeJu power system in 2011 will also be presented in this paper.

  • PDF