• 제목/요약/키워드: Power distribution lines

검색결과 306건 처리시간 0.03초

배전선로에 유도발전기 연결시 역률 변동에 관한 연구 (A study on the variation of power factor by connection of the induction generator to the distribution line)

  • 김종겸;박영진;이경배;김영국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1469-1470
    • /
    • 2015
  • Recently induction generator has been applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed how the power factor is changed according to the load increase or decrease in the distribution lines.

  • PDF

PSCAD/EMTDC를 이용한 철도 고압 배전계통의 과도특성 해석 및 1선 지락사고에 대한 보호방안 (Analysis of Transient Characteristic in the Railway High Voltage Distribution Lines Using PSCAD/EMTDC at Method of Protection for One Line Ground Fault)

  • 박계인;창상훈;최창규
    • 조명전기설비학회논문지
    • /
    • 제22권2호
    • /
    • pp.51-56
    • /
    • 2008
  • 철도에서의 고압배전선로는 역사조명 및 동력설비, 그리고 열차의 안전운행을 위한 신호설비의 전력을 공급해주는 설비로 열차의 안전운행 및 철도 이용자의 서비스 향상을 위한 중요한 역할을 담당하고 있다. 또한 각종 전력기기의 전자화, 자동화로 인해 양질의 전력공급이 요구되며, 철도 이용자에 대한 보다 향상된 서비스를 제공과 역사내 전기에너지 사용의 급증으로 인한 전력공급의 신뢰성 확보가 요구된다. 본 논문에서는 철도고압배전계통의 고장현상을 분석하기 위하여 철도고압배전 설비 중 접지계통과 비접지계통에 대해서 사고시 전압강하가 발생 여부와 사고를 제거하기 위해 차단기를 동작시켰을 때의 서지전압에 의한 과도특성을 PSCAD/EMTDC를 이용하여 모의하였으며, 이 사고모의 결과를 토대로 비접지 고압배전계통의 보호방법에 대한 대안을 제시하였다.

전력선 통신을 이용한 집단주택 안전관리 시스템 (Security Monitoring System for Apartment House Building Using Paver Line Carrier)

  • 김인수;김관호;김요희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.476-478
    • /
    • 1993
  • Instead of installing new communication wiring to each house in the apartment house building. the power distribution network. which is already installed in the building. can be use as communication medium. In a safty management, by adoption of power line communication system, at remote we can monitor safty related sensors such as fire, gas leakage, burglar intrusion and emergency call which are located at each house. From this viewpoint, we developed security monitoring system for apartment house building using power lines. Security monitoring system consists of Power Line Communication-Sub Controller (PLC-SC). Power Line Communication-Main Controller (PLC-MC) and Management System (MS). Between a PLC-MC and a PLC-SC, the transmission rate is 1200 bps in power lines and modulation technique is frequency shirt keying (FSK). In between a PLC-MC and a MS, the transmission rate is 1200 bps in communication line (RS-485). As a result of this research. transmission loss is 0.1dB per meter of intrabuilding distribution network. Transmission can be reach in 250 meters. So it is enough to communicate for security monitoring system in apartment house building.

  • PDF

Development of a Live-line Insulator Inspection Tool System for 154 kV Power Transmission Lines

  • Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak;Oh, Ki-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권1호
    • /
    • pp.23-33
    • /
    • 2012
  • The current paper deals with a new live-line insulator inspection tool system that will be used by the Korea Electric Power Corporation for its 154 kV power transmission lines in 2011. Unlike the existing contact type tools, the developed inspection tool automates parts of the insulator inspection process using a sensor and an actuator. The tool sustains its weight independently, not by a lineman. In addition, the inspection tool measures the insulation resistance of an insulator together with its distribution voltage, thus providing more information for analysis and diagnosis. Such characteristics improve the system's operation efficiency, measurement reliability, and usability. We confirmed its effectiveness through live-line field tests with actual power transmission lines.

An Adaptive Setting Method for the Overcurrent Relay of Distribution Feeders Considering the Interconnected Distributed Generations

  • Jang Sung-Il;Kim Kwang-Ho;Park Yong-Up;Choi Jung-Hwan;Kang Yong-Cheol;Kang Sang-Hee;Lee Seung-Jae;Oshida Hideharu;Park Jong-Keun
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.357-365
    • /
    • 2005
  • This research investigates the influences of distributed generations (DG), which are interconnected to the bus by the dedicated lines, on the overcurrent relays (OCR) of the neighboring distribution feeders and also proposes a novel method to reduce the negative effects on the feeder protection. Due to the grid connected DG, the entire short-circuit capacity of the distribution networks increases, which may raise the current of the distribution feeder during normal operations as well as fault conditions. In particular, during the switching period for loop operation, the current level of the distribution feeder can be larger than the pickup value for the fault of the feeder's OCR, thereby causing the OCR to perform a mal-operation. This paper proposes the adaptive setting algorithm for the OCR of the distribution feeders having the neighboring dedicated feeders for the DG to prevent the mal-operations of the OCR under normal conditions. The proposed method changes the pickup value of the OCR by adapting the power output of the DG monitored at the relaying point in the distribution network. We tested the proposed method with the actual distribution network model of the Hoenggye substation at the Korea Electric Power Co., which is composed of five feeders supplying the power to network loads and two dedicated feeders for the wind turbine generators. The simulation results demonstrate that the proposed adaptive protection method could enhance the conventional OCR of the distribution feeders with the neighboring dedicated lines for the DG.

가공배전선에 의한 유도전압 특성 분석 (An Analysis of the Induced Voltage characteristic on 22.9kV-Y Distribution Lines)

  • 임용훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.500-502
    • /
    • 2003
  • This paper reviews calculating of induced voltage onto a communication line from 22.9kV-Y Distribution Lines. The coexistence of both power line and communication line in parallel generates the induction of significant longitudinal voltage in the weak current line. In order to evaluate a precise induced voltage, this paper indicated some problems about coefficient and numerical formula. It also presents some induced voltage production technology standard application.

  • PDF

섬락 단선 방지 장치에 의한 피복 절연 가공배전 선로의 유도뢰애 의한 단선 방지 (Arc Fusion Protection of Covered Conductors Using AFPD)

  • 이용한;정동학;하복남;남궁도;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.800-802
    • /
    • 1997
  • After flashover occurs on the overhead distribution line by lighting strokes(direct or induced), the power frequency arc current continues. If lightning flashover occurs on the overhead lines using covered conductors, the power frequency art current with fixed path overheats the conductor, and arc fusion fault can be occurred. There are two categories protecting or reducing methods of arc fusion faults caused by lightning stokes. - Reducing lightning flashover rate : G/W, LA, etc. - Protection by AFPD(Arc Fusion Protection Device) : power follow current interruption. This paper presents lightning surge phenomena on overhead distribution lines and protecting performance of arc fusion Protection devices to the lightning strokes nearby overhead line.

  • PDF

Optimal Capacity and Allocation of Distributed Generation by Minimum Operation Cost in Distribution Systems

  • Shim Hun;Park Jung-Hoon;Bae In-Su;Kim Jin-O
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.9-15
    • /
    • 2005
  • In the operation of distribution systems, DGs (Distributed Generations) are installed as an alternative to extension and the establishment of substations, transmission and distribution lines according to the increasing power demand. In the operation planning of DGs, determining optimal capacity and allocation achieves economical profitability and improves the reliability of power distribution systems. This paper proposes a determining method for the optimal number, size and allocation of DGs in order to minimize the operation costs of distribution systems. Capacity and allocation of DGs for economical operation planning duration are determined to minimize total cost composed with power buying cost, operation cost of DGs, loss cost and outage cost using the GA (Genetic Algorithm).